# Site investigation for road construction

Engineering Geology I · Chapter 1: Geology and Civil Engineering

- Asked in: 2064 Jestha (old course), 5 marks
- Video: [What is Geotechnical Investigation or Soil Investigation?](https://www.youtube.com/watch?v=ClCUdEyqm4Q) — Civil Mentors
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_3/engineering_geology_i/site-investigation-for-road-construction
- Whole chapter: https://www.bctengineer.com/md/semester_3/engineering_geology_i/chapter-1

## Question

Describe the various methods of site investigation for road construction.

## Short answer

Site investigation for a road involves desk study and reconnaissance, followed by detailed engineering geological mapping, test pits, boreholes, and geophysical surveys to determine ground conditions. In-situ tests, slope stability analysis, and material surveys for aggregates and fill are conducted, with findings documented in strip maps and geological sections.

## Answer

Site investigation for a road finds the ground conditions along the alignment so that the road is safe, economical and stable. It is done in stages.

#### 1. Reconnaissance and desk study
- Collect topographic maps, geological maps, aerial photographs, satellite images and earlier reports.
- Walk over possible routes to compare them and avoid landslides, steep slopes, marshes and fault zones.

#### 2. Preliminary survey
- Detailed **engineering geological mapping** of the corridor: rock types, structures, weathering, slope angles, springs, existing landslides.
- Aerial photograph interpretation for lineaments, drainage and unstable areas.
- A few test pits and shallow boreholes at key locations.

#### 3. Detailed investigation of the chosen alignment
- **Test pits and trenches** every 200 to 500 m or at changes in soil type to find soil type and depth of rock; sample for laboratory tests (grain size, Atterberg limits, CBR, compaction).
- **Boreholes (auger/rotary)** at bridge sites, high embankments, deep cuttings and landslide areas to get strata, groundwater and rock quality.
- **Geophysical methods**: electrical resistivity and seismic refraction for depth of bedrock, water table and buried slide surfaces.
- **In-situ tests**: SPT, plate load test, field CBR.
- **Slope stability study** by kinematic analysis of joints and bedding relative to the cut face.

#### 4. Material survey
- Locate quarries for stone and aggregate, borrow pits for fill, and sand and gravel sources; test for quality and quantity.

#### 5. Reporting
- Prepare strip maps, longitudinal geological sections, and recommendations on cut slopes, retaining structures, drainage and bioengineering.

#### 6. Construction stage
- Inspect cuttings and foundations, and revise treatment if conditions differ.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Detailed engineering geological mapping of the corridor is done in:
   A. Reconnaissance only
   B. Preliminary survey
   C. Construction stage only
   D. Reporting only
   Answer: B. Mapping the corridor is part of preliminary survey. (Key point: Stages)

2. Boreholes in road investigation are placed mainly at:
   A. Every metre of the road
   B. Only flat plains
   C. Bridge sites, high embankments, deep cuttings and landslide areas
   D. Quarry roofs only
   Answer: C. Boreholes target critical locations. (Key point: Boreholes)

3. Kinematic analysis checks:
   A. Soil colour
   B. Aggregate size
   C. Bridge loads
   D. Joints and bedding orientation relative to the cut face
   Answer: D. It shows whether blocks can slide out of the cut. (Key point: Slope stability)

4. Soil samples from test pits are tested for:
   A. Grain size, Atterberg limits, CBR and compaction
   B. Fossil age
   C. RQD
   D. Lugeon value
   Answer: A. These are road subgrade tests. (Key point: Lab tests)

## Related in Engineering Geology I

- [Methods of surface and subsurface site investigation](https://www.bctengineer.com/question.md?key=semester_3%2Fengineering_geology_i%3Amethods-of-surface-and-subsurface) — Engineering Geology I, chapter 1, asked 4×
- [Engineering geological map and site investigation](https://www.bctengineer.com/question.md?key=semester_3%2Fengineering_geology_i%3Aengineering-geological-map-and-site) — Engineering Geology I, chapter 1, asked 3×
- [Site investigation for dam and reservoir](https://www.bctengineer.com/question.md?key=semester_3%2Fengineering_geology_i%3Asite-investigation-for-dam-and) — Engineering Geology I, chapter 1, asked 2×
- [Objectives of investigation for hill road](https://www.bctengineer.com/question.md?key=semester_3%2Fengineering_geology_i%3Aobjectives-of-investigation-for-hill) — Engineering Geology I, chapter 1

## Related in other subjects

- [Purposes of site investigation](https://www.bctengineer.com/question.md?key=semester_4%2Fengineering_geology_ii%3Asite-investigation-purposes) — Engineering Geology II, chapter 4, asked 7×
- [Types and methods of site investigation](https://www.bctengineer.com/question.md?key=semester_4%2Fengineering_geology_ii%3Asite-investigation-methods) — Engineering Geology II, chapter 4, asked 7×
- [Contents of site investigation report](https://www.bctengineer.com/question.md?key=semester_5%2Ffoundation_engineering%3Asite-investigation-report) — Foundation Engineering, chapter 2, asked 5×
- [Detail stage of EG site investigation](https://www.bctengineer.com/question.md?key=semester_4%2Fengineering_geology_ii%3Adetail-stage-investigation) — Engineering Geology II, chapter 4