title: "Capacitor for zero regulation, 70 km 220 kV line"
subject: "Power System Analysis I"
chapter: 6
key: "semester_4/power_system_analysis_i:70km-220kv-zero-regulation-capacitor"
source: https://www.bctengineer.com/q/semester_4/power_system_analysis_i/70km-220kv-zero-regulation-capacitor
site: BCT Engineering
---

# Capacitor for zero regulation, 70 km 220 kV line

Power System Analysis I · Chapter 6: Performance Analysis

- Asked in: 2069 Bhadra, 6 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_4/power_system_analysis_i/70km-220kv-zero-regulation-capacitor
- Whole chapter: https://www.bctengineer.com/md/semester_4/power_system_analysis_i/chapter-6

## Question

A 70 km long, 50 Hz, 3-phase overhead transmission line is operating at 220 kV. The series impedance of the line is 8 + j22 Ohm/phase. The line is supplying a load of 100 MW at 0.9 p.f. lagging. Compute the capacitance per phase to be connected across the load so as to make the voltage regulation of the line zero.

## Short answer

To achieve zero regulation, a three-phase shunt capacitor of 87.8 MVAr is needed, corresponding to 5.77 µF per phase in star connection.

## Answer

Short line: $Z = 8 + j22\ \Omega$/phase, $V_R$ = 220 kV, load 100 MW at 0.9 pf lag ($Q_L = 100\tan25.84^\circ = 48.43$ MVAr). Without compensation the regulation is 3.92 %.

#### Condition for zero regulation
With line kV and three-phase MW/MVAr, the net receiving-end $P + jQ$ must satisfy $|V_S| = |V_R|$:
$$
\begin{aligned}
V_S &= V_R + \frac{(R + jX)(P - jQ)}{V_R} \\
|V_R|^4 &= (V_R^2 + RP + XQ)^2 + (XP - RQ)^2
\end{aligned}
$$
Substituting $V_R = 220$, $P = 100$, $R = 8$, $X = 22$:
$$
48\,400^2 = (48\,400 + 800 + 22Q)^2 + (2200 - 8Q)^2
$$
$$
548Q^2 + 2\,129\,600Q + 82\,920\,000 = 0
$$
Taking the root nearer zero:
$$
Q = -39.34\ \text{MVAr}\quad(\text{net pf} = 0.931\ \text{leading})
$$

#### Capacitor rating
$$
Q_C = Q_L - Q = 48.43 + 39.34 = 87.77\ \text{MVAr (3-phase)}
$$

#### Capacitance per phase (star connected)
$$
C = \frac{Q_C}{\omega V_L^2} = \frac{87.77\times10^6}{314.16\times(220\times10^3)^2} = 5.77\ \mu\text{F}
$$
(For a delta-connected bank, $C_\Delta = C/3 = 1.92\ \mu$F.)

Using the approximate rule $\tan\phi = R/X$ leading gives $Q_C = 48.43 + 100(8/22) = 84.80$ MVAr and $C$ ≈ 5.58 µF, close to the exact value.

**Answer: About 87.8 MVAr of shunt capacitors, i.e. C ≈ 5.77 µF per phase (star).**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What condition defines zero voltage regulation?
   A. |V_S| = |V_R| at full load
   B. V_S = 0
   C. Load current is zero
   D. The pf is exactly unity
   Answer: A. Regulation is zero when the sending and receiving voltage magnitudes are equal with the load connected. (Key point: Zero regulation condition)

2. Net required Q is -39.34 MVAr and the load Q is +48.43 MVAr (lagging). What is the capacitor rating?
   A. 48.43 - 39.34 = 9.09 MVAr
   B. 39.34 MVAr
   C. 48.43 + 39.34 = 87.77 MVAr
   D. 100 MVAr
   Answer: C. The capacitor must cancel the lagging 48.43 MVAr and then supply a further 39.34 MVAr leading: Q_C = Q_L - Q = 87.77 MVAr. (Key point: Capacitor rating)

3. For a star-connected bank, how is C per phase found?
   A. C = Q_C / (omega V_L^2)
   B. C = Q_C / (omega V_ph)
   C. C = Q_C x omega / V_L^2
   D. C = Q_C / (3 omega V_L^2)
   Answer: A. Q_C = omega C V_L^2 for a star bank (3 x omega C V_ph^2), giving 5.77 microfarad. (Key point: Capacitance per phase)

4. How does the delta-connected capacitance per phase compare with the star value?
   A. Three times larger
   B. Equal
   C. One-third, 1.92 microfarad
   D. Square root of 3 times larger
   Answer: C. For the same MVAr, a delta bank sees line voltage across each unit, so C_delta = C_star/3. (Key point: Delta versus star bank)

## Related in Power System Analysis I

- [70 km, 40 MW line: regulation and zero-regulation pf](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3A70km-40mw-regulation) — Power System Analysis I, chapter 6
- [33 kV, 12 MW leading load: efficiency, zero regulation](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3A33kv-12mw-leading-efficiency) — Power System Analysis I, chapter 6, asked 2×
- [12 km 33 kV line: losses, zero-regulation capacitor](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3A12km-33kv-losses-zero-regulation) — Power System Analysis I, chapter 6
- [15 km line: regulation and zero-regulation capacitor](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3A15km-line-zero-regulation) — Power System Analysis I, chapter 6
- [Regulation and efficiency of 100 km, 110 kV line](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Aregulation-efficiency-100km-110kv) — Power System Analysis I, chapter 6, asked 2×
- [450 km 400 kV line, 420 MW, 0.9 pf](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3A450km-400kv-420mw-090) — Power System Analysis I, chapter 5

## Related in other subjects

- [Conductor selection, 100 MW 70 km 132 kV](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aconductor-selection-100mw-70km-132kv) — Transmission and Distribution System Design, chapter 4
- [220 kV double circuit efficiency and regulation](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Adouble-circuit-220kv-efficiency-regulation) — Transmission and Distribution System Design, chapter 4
- [Conductor selection, 220 kV line for 200 MW](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aconductor-selection-220kv-200mw-120km) — Transmission and Distribution System Design, chapter 4
- [Surge impedance and velocity of 220 kV line](https://www.bctengineer.com/question.md?key=semester_8%2Fhigh_voltage_engineering%3Asurge-impedance-220kv-200km) — High Voltage Engineering, chapter 3, asked 2×