title: "10 m cut in cohesive soil, bedrock 15 m"
subject: "Soil Mechanics"
chapter: 11
key: "semester_4/soil_mechanics:cut-10m-cohesive-phi-zero-bedrock"
source: https://www.bctengineer.com/q/semester_4/soil_mechanics/cut-10m-cohesive-phi-zero-bedrock
site: BCT Engineering
---

# 10 m cut in cohesive soil, bedrock 15 m

Soil Mechanics · Chapter 11: Stability of Slopes

- Asked in: 2078 Baisakh
- Page: https://www.bctengineer.com/q/semester_4/soil_mechanics/cut-10m-cohesive-phi-zero-bedrock
- Whole chapter: https://www.bctengineer.com/md/semester_4/soil_mechanics/chapter-11

## Question

A cut 10 m deep is to be made in a stratum of cohesive soil (c = 35 kN/m², $\gamma$ = 18.5 kN/m³ and $\phi$ = 0). The bed rock is located 15 m below the original ground surface. [The remainder of the question is cut off in the scan, presumably asking for the factor of safety or stability.]

## Short answer

Assuming a vertical cut in cohesive soil (φ=0, c=35 kN/m², γ=18.5 kN/m³, H=10 m, depth factor 1.5), Taylor's stability number N_s ≈ 0.261 yields F = c/(N_s γ H) = 0.72. The cut is unsafe; critical height is about 7.25 m.

## Answer

**Note:** the rest of the question and the cut slope are missing. The usual form asks for the factor of safety (or safe height) of the cut. The solution below assumes a **vertical cut** (slope angle $\beta = 90^\circ$) and uses Taylor's stability number method; the same steps apply for any given slope angle.

**Data:** $H = 10$ m, $c = c_u = 35$ kN/m², $\gamma = 18.5$ kN/m³, $\phi = 0$. Bedrock at 15 m below the original ground, so the depth factor is

$$
n_d = \frac{D}{H} = \frac{15}{10} = 1.5
$$

**Taylor's stability number (for $\phi = 0$)**

$$
N_s = \frac{c_m}{\gamma H}
$$

For steep slopes ($\beta > 53^\circ$) the critical circle is a toe circle regardless of the depth factor, and Taylor's chart gives, for $\beta = 90^\circ$, $N_s \approx 0.261$.

**Critical height**

$$
H_c = \frac{c}{\gamma N_s} = \frac{35}{18.5\times0.261} = 7.25\ \text{m}
$$

**Factor of safety**

$$
F = \frac{H_c}{H} = \frac{7.25}{10} = 0.72 \quad \left(\text{or } F = \frac{c}{N_s\gamma H} = \frac{35}{0.261\times185} = 0.72\right)
$$

**Result:** $F < 1$, so a 10 m vertical cut in this soil is **unsafe** and would fail. The maximum safe height of a vertical cut is about 7.25 m (with $F = 1$). For $F = 1.5$, the cut must be flattened (read $N_s$ for a smaller $\beta$ from Taylor's chart) or supported by a retaining system.

**Answer: $F \approx 0.72$ for a vertical cut (unsafe).** The depth factor $n_d = 1.5$ matters only for flatter slopes ($\beta<53^\circ$).

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. With bedrock 15 m below the original ground and a 10 m cut, what is the depth factor nd?
   A. 0.67
   B. 1.0
   C. 1.5
   D. 2.5
   Answer: C. nd = D/H = 15/10 = 1.5. (Key point: Depth factor)

2. What is Taylor's stability number for a φ = 0 soil?
   A. Ns = γH/cm
   B. Ns = cm/(γH)
   C. Ns = cm tanφ/(γH)
   D. Ns = H/c
   Answer: B. Ns = cm/(γH), so Hc = c/(γ Ns). (Key point: Stability number)

3. For a vertical cut (Ns ≈ 0.261), c = 35 kN/m2 and γ = 18.5 kN/m3, what is Hc?
   A. About 7.25 m
   B. About 10 m
   C. About 13.8 m
   D. About 2.4 m
   Answer: A. Hc = 35/(18.5 x 0.261) = 7.25 m. (Key point: Critical height)

4. What is the result for the 10 m vertical cut?
   A. F = 1.38, safe
   B. F = 0.72, unsafe
   C. F = 1.5, safe
   D. F = 0.26, unsafe
   Answer: B. F = Hc/H = 7.25/10 = 0.72 < 1, so the cut would fail unless flattened or supported. (Key point: Conclusion on safety)

5. For which slopes does the depth factor matter in Taylor's φ = 0 analysis?
   A. Only steep slopes
   B. Only slopes flatter than about 53°
   C. All slopes equally
   D. Only vertical cuts
   Answer: B. For β > 53° the critical circle is a toe circle regardless of depth factor, so nd matters only for flatter slopes. (Key point: Role of depth factor)

## Related in Soil Mechanics

- [Compacted soil 18 kN/m³, porosity and ZAV](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Amax-dry-weight-18-porosity-zav) — Soil Mechanics, chapter 5, asked 2×
- [Compacted soil 18 kN/m³, saturation](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Amax-dry-weight-18-saturation) — Soil Mechanics, chapter 5
- [Infinite slope FoS, dry cohesive soil](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Ainfinite-slope-dry-cohesive-derive) — Soil Mechanics, chapter 11
- [Water tower foundation on weak stratum](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Awater-tower-weak-stratum-stress) — Soil Mechanics, chapter 8, asked 2×
- [Embankment excavation quantity (18 kN/m³)](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Aembankment-excavated-quantity-2079) — Soil Mechanics, chapter 2
- [Surcharge 15 kPa, stresses at clay centre](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Asurcharge-15kpa-stresses-clay-center) — Soil Mechanics, chapter 9

## Related in other subjects

- [3-bus load flow with Q limits (cut off)](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Aload-flow-reference-load-generator-bus) — Power System Analysis II, chapter 2
- [Lateral load elements; stepwise [cut off]](https://www.bctengineer.com/question.md?key=semester_5%2Fconcrete_technology_and_masonry_structure%3Alateral-elements-stepwise-74c) — Concrete Technology and Masonry Structure, chapter 9
- [Rural area 22000 L/day river supply (question text cut)](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ares-a76) — Water Supply Engineering, chapter 7
- [Bresenham: endpoints (10,18),(15,8)](https://www.bctengineer.com/question.md?key=semester_5%2Fcomputer_graphics%3Adigitize-point-10-18-15-8) — Computer Graphics, chapter 2