# Vertical curve +0.5% and -0.7%, IP RL 350.750

Surveying II · Chapter 6: Curves

- Asked in: 2069 Bhadra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_4/surveying_ii/vertical-curve-pos05-neg07-ip-500
- Whole chapter: https://www.bctengineer.com/md/semester_4/surveying_ii/chapter-6

## Question

Calculate the RLs of pegs on a vertical curve connecting two grades of +0.5% and -0.7% at the point of intersection. The chainage and RL of intersection point are 500 m and 350.750 m respectively. The rate of change of grade is 0.1% per 30 m.

## Short answer

Length L = 360 m from 1.2% grade change at 0.1% per 30 m. BVC at chainage 320 m, RL 349.850 m; EVC at 680 m, RL 349.490 m. Highest point at chainage 470 m, RL 350.225 m. Curve levels are obtained by adding tangent grade elevation and parabolic offset from BVC.

## Answer

A parabolic vertical curve with a constant rate of change of grade is set out using the tangent-offset method.

#### Step 1: Length of the curve
Rate of change of grade $r = 0.1\%$ per 30 m, algebraic change in grade $= -0.7 - (0.5) = -1.2\%$.

$$
L = \frac{|g_2-g_1|}{r}\times 30 = \frac{1.2}{0.1}\times 30 = 360\ \text{m}
$$

#### Step 2: BVC, EVC and their levels
The curve is a summit (crest) curve with equal tangent lengths $L/2 = 180$ m.

$$
\begin{aligned}
\text{Ch. of BVC} &= 500 - 180 = 320\ \text{m}\\
\text{Ch. of EVC} &= 500 + 180 = 680\ \text{m}\\
\text{RL of BVC} &= 350.75 - \frac{(0.5)}{100}\times 180 = 349.85\ \text{m}\\
\text{RL of EVC} &= 350.75 + \frac{(-0.7)}{100}\times 180 = 349.49\ \text{m}
\end{aligned}
$$

#### Step 3: RL of curve points
Using the tangent-offset form of the parabola ($x$ measured from BVC, grades in %):

$$
y_x = \text{RL}_{BVC} + \frac{g_1 x}{100} + \frac{(g_2-g_1)x^2}{200L}
$$

with $g_1 = 0.5\%$, $g_2 = -0.7\%$, $L = 360$ m, so the offset is $y = \frac{(-1.2)x^2}{200\times 360}$ and pegs are taken at multiples of 30 m.

| Chainage (m) | x from BVC (m) | Tangent RL (m) | Offset y (m) | Curve RL (m) |
|---|---|---|---|---|
| 320 | 0 | 349.850 | 0.000 | 349.850 |
| 330 | 10 | 349.900 | -0.002 | 349.898 |
| 360 | 40 | 350.050 | -0.027 | 350.023 |
| 390 | 70 | 350.200 | -0.082 | 350.118 |
| 420 | 100 | 350.350 | -0.167 | 350.183 |
| 450 | 130 | 350.500 | -0.282 | 350.218 |
| 480 | 160 | 350.650 | -0.427 | 350.223 |
| 510 | 190 | 350.800 | -0.602 | 350.198 |
| 540 | 220 | 350.950 | -0.807 | 350.143 |
| 570 | 250 | 351.100 | -1.042 | 350.058 |
| 600 | 280 | 351.250 | -1.307 | 349.943 |
| 630 | 310 | 351.400 | -1.602 | 349.798 |
| 660 | 340 | 351.550 | -1.927 | 349.623 |
| 680 | 360 | 351.650 | -2.160 | 349.490 |

Check: the last curve RL (349.49 m) equals the RL of EVC (349.49 m), and the curve at the IP chainage lies 0.54 m below the IP, at RL 350.21 m.

#### Step 4: Highest point
At the highest point the grade is zero, so $x = \dfrac{-g_1 L}{g_2-g_1} = \dfrac{-0.5\times 360}{-1.2} = 150$ m from BVC.

- Chainage = 320 + 150 = 470 m
- RL = 349.85 + (0.5/100)(150) + (-1.2)(150)²/(200 × 360) = 350.225 m

Peg interval is not stated, so it is taken as 30 m (equal to the length over which the rate of change of grade is specified). The BVC and EVC are included.

**Answer:** $L = 360$ m, BVC at 320 m (RL 349.85 m), EVC at 680 m (RL 349.49 m); curve levels as tabulated.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. A +0.5% grade followed by -0.7% gives which curve?
   A. Sag curve, offsets added
   B. Reverse curve
   C. Summit curve, offsets subtracted
   D. Transition curve
   Answer: C. Rising then falling makes a crest, so offsets are negative and the curve lies below the tangent. (Key point: Curve type)

2. What is L for 1.2% change at 0.1% per 30 m?
   A. 360 m
   B. 180 m
   C. 72 m
   D. 36 m
   Answer: A. L = (1.2/0.1) x 30 = 360 m. (Key point: Length)

3. Where is the highest point of the curve?
   A. At the IP chainage 500 m
   B. Where grade is zero, x = 150 m from BVC (chainage 470 m)
   C. At the BVC
   D. At the EVC
   Answer: B. x = -g1 L/(g2 - g1) = 0.5 x 360/1.2 = 150 m. (Key point: Highest point)

4. Where does the curve lie at the IP chainage?
   A. 0.54 m below the IP, at 350.21 m
   B. At the IP
   C. 2.16 m below the IP
   D. 0.54 m above the IP
   Answer: A. Mid-ordinate e = 360 x 1.2/800 = 0.54 m, subtracted for a summit curve. (Key point: Curve at the IP)

## Related in Surveying II

- [Vertical curve -0.5% and +0.7%, IP RL 500](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-neg05-pos07-ip-1000) — Surveying II, chapter 6
- [Vertical curve -2% and +3%, IP 2600, 0.5% per 20 m](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-2down-3up-ip-2600) — Surveying II, chapter 6
- [Vertical curve -1% and +0.5%, IP 500 m](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-falling-1-rising-05) — Surveying II, chapter 6, asked 2×
- [Vertical curve -0.7% and +0.5%, IP RL 650](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-neg07-pos05-rl-ip) — Surveying II, chapter 6
- [Vertical curve 180 m, -3.5% then +4.5%, IP 2450](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-35down-45up-ip-2450) — Surveying II, chapter 6, asked 2×
- [Vertical curve +3.5% and -2.75%, 30 m pegs](https://www.bctengineer.com/question.md?key=semester_4%2Fsurveying_ii%3Avertical-curve-35-down-275-through) — Surveying II, chapter 6, asked 7×

## Related in other subjects

- [Vertical curve chainage and elevations, R 8000 m](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3An-69bh-vc-chainage) — Transportation Engineering I, chapter 3
- [Vertical curve, -3% and 1.5% at chainage 2000](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3An-79a-vc-2000) — Transportation Engineering I, chapter 3
- [Vertical curve with 300 m grade sections](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3An-65k-vc-300) — Transportation Engineering I, chapter 3
- [Summit curve limited to 750 m](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3An-75bh-vc-summit-750) — Transportation Engineering I, chapter 3, asked 3×