title: "Proposal for an auditorium hall"
subject: "Communication English"
chapter: 6
key: "semester_5/communication_english:proposal-auditorium-hall-college"
source: https://www.bctengineer.com/q/semester_5/communication_english/proposal-auditorium-hall-college
site: BCT Engineering
---

# Proposal for an auditorium hall

Communication English · Chapter 6: Writing Proposal

- Asked in: 2078 Kartik, 10 marks
- Video: [Project Proposal Writing: How to Write A Winning Project Proposal](https://www.youtube.com/watch?v=jsGBuu88WE0) — ProjectManager
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/communication_english/proposal-auditorium-hall-college
- Whole chapter: https://www.bctengineer.com/md/semester_5/communication_english/chapter-6

## Question

Write a proposal on construction of auditorium hall in your college, prepare rationale, estimated budget and conclusion only.

## Short answer

The college lacks a hall, forcing events to be held in corridors or rented spaces, which disrupts classes and increases costs. A 500-seat auditorium costing Rs. 2,62,50,000 (funded by college fund, alumni, students, and rent) will meet this need and generate revenue. Approval is requested to form a building committee.

## Answer

#### Rationale

Our college has more than 1,500 students and 100 staff, but no hall to hold them. At present, seminars, orientation, cultural programmes, and graduation ceremonies are held in the corridor or in rented halls outside, which costs money, takes time and affects classes. A hall of its own would let us hold events for the whole college, give students a place for performances and presentations, and also earn income by renting it out. It is also a safe place for students to gather, and it will improve the college's image and attract students.

#### Estimated budget

The construction of a 500-seat auditorium, about 6,500 sq. ft., is estimated as follows.

| S.N. | Item | Amount (Rs.) |
|---|---|---|
| 1 | Site preparation and foundation | 38,00,000 |
| 2 | RCC frame, walls and roof | 95,00,000 |
| 3 | Auditorium seats (500) and stage | 28,00,000 |
| 4 | Sound, light and projection system | 22,00,000 |
| 5 | Air-conditioning and ventilation | 20,00,000 |
| 6 | Electrical, fire safety and plumbing | 17,00,000 |
| 7 | Interior, doors and windows | 18,00,000 |
| 8 | Design and supervision | 12,00,000 |
| | **Sub-total** | **2,50,00,000** |
| | Contingency (5%) | 12,50,000 |
| | **Grand total** | **2,62,50,000** |

**Sources of funds:** college development fund (40%), alumni and donors (35%), student fees (10%), and hall rent and loan (15%).

#### Conclusion

The auditorium is a long-felt need of the college. It will also host inter-college contests, workshops and training, bringing in income and reputation. It is technically feasible, and the cost can be raised from the sources above. We request the Campus Management Committee to approve this proposal and to form a building committee so that construction can start before the next academic session.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What is the main reasoning in the rationale?
   A. The college wants to close classes
   B. The college has more than 1,500 students and 100 staff but no hall; events use corridors or costly rented halls
   C. Auditoriums are fashionable
   D. Students dislike seminars
   Answer: B. The rationale justifies the project by present need, costs and benefits like income and image. (Key point: Rationale)

2. How is the grand total of Rs. 2,62,50,000 reached?
   A. Sub-total Rs. 2,50,00,000 plus 5 percent contingency of Rs. 12,50,000
   B. Sub-total plus 10 percent
   C. Sub-total minus design cost
   D. Only construction items summed
   Answer: A. 5 percent of 2.5 crore is 12.5 lakh; the sum is 2,62,50,000. (Key point: Budget total)

3. Which funding source supplies the largest share?
   A. Alumni and donors (35%)
   B. Student fees (10%)
   C. Rent and loan (15%)
   D. College development fund (40%)
   Answer: D. The college development fund provides 40 percent, the highest share. (Key point: Sources of funds)

4. What does the conclusion ask the Campus Management Committee to do?
   A. Reduce the fees
   B. Delay the project for five years
   C. Rent a hall outside
   D. Approve the proposal and form a building committee so construction can start before the next academic session
   Answer: D. A conclusion summarises feasibility and makes a specific request. (Key point: Conclusion)

## Related in Communication English

- [Proposal for engineering college to local authority](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-engineering-college-local-authority) — Communication English, chapter 6
- [Proposal: auditorium or student project club](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-auditorium-or-project-club) — Communication English, chapter 6
- [Proposal for an engineering college](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-engineering-college-kathmandu) — Communication English, chapter 6
- [Proposal for public library](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-public-library) — Communication English, chapter 6
- [Proposal for communication technology centre](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-communication-technology-centre) — Communication English, chapter 6
- [Proposal to reduce plastic bag use](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-reduce-plastic-bags) — Communication English, chapter 6

## Related in other subjects

- [Valuation of a cinema hall (land Rs 15 lakh)](https://www.bctengineer.com/question.md?key=semester_8%2Fconstruction_management%3Avalue-cinema-hall-2077) — Construction Management, chapter 13, asked 2×
- [Valuation of a cinema hall (land Rs 5 crore)](https://www.bctengineer.com/question.md?key=semester_8%2Fconstruction_management%3Avalue-cinema-hall-2070-magh) — Construction Management, chapter 13
- [EVA; 60 days, 25% work, 50% budget spent](https://www.bctengineer.com/question.md?key=semester_7%2Fproject_engineering%3Aeva-numerical-60-days-half-budget) — Project Engineering, chapter 4
- [Prepare tender notice for commercial complex](https://www.bctengineer.com/question.md?key=semester_8%2Fconstruction_management%3Aprepare-tender-notice-100mln) — Construction Management, chapter 5