title: "Proposal to start a company: title, abstract, objectives"
subject: "Communication English"
chapter: 6
key: "semester_5/communication_english:proposal-company-big-organization"
source: https://www.bctengineer.com/q/semester_5/communication_english/proposal-company-big-organization
site: BCT Engineering
---

# Proposal to start a company: title, abstract, objectives

Communication English · Chapter 6: Writing Proposal

- Asked in: year not given, 10 marks
- Video: [Project Proposal Writing: How to Write A Winning Project Proposal](https://www.youtube.com/watch?v=jsGBuu88WE0) — ProjectManager
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/communication_english/proposal-company-big-organization
- Whole chapter: https://www.bctengineer.com/md/semester_5/communication_english/chapter-6

## Question

Suppose that you are invited to submit a proposal on establishing a company in the field of your engineering interest from a big organization in Nepal. Show the title page, abstract, objectives and conclusion parts of the proposal you have prepared.

## Short answer

Proposal to establish Himal IoT Solutions Pvt. Ltd. for IoT-based smart monitoring systems. First-year investment of Rs. 1.8 crore, seeking Rs. 1.2 crore as advance from the corporation. The company will deploy a pilot within six months, providing real-time data and employing 20 engineers. It is technically and financially viable.

## Answer

#### Title page

```text
                         PROPOSAL

ESTABLISHMENT OF HIMAL IOT SOLUTIONS PVT. LTD., A COMPANY
FOR SMART MONITORING SYSTEMS

Submitted to:
The Chief Executive Officer
Nepal Infrastructure Development Corporation
Kathmandu

Submitted by:
Er. Suresh Karki
Computer Engineer, Promoter
Himal IoT Solutions (proposed)

12 December 2026
```

#### Abstract

Large organizations in Nepal, such as power utilities, water boards and municipalities, still use manual readings and paper records to monitor their assets. This causes losses, delays and errors. As a computer engineer, I propose to establish Himal IoT Solutions Pvt. Ltd. in Kathmandu to design and install Internet of Things (IoT) monitoring systems for smart metering, water-level and water-quality sensing, and equipment tracking, with cloud dashboards and mobile apps. The proposed first-year investment is Rs. 1.8 crore, of which Rs. 1.2 crore is requested from the Corporation as a service contract advance and partnership. The company will start with a pilot project for the Corporation within six months. It will give the Corporation real-time data, lower losses and better service, and it will employ 20 engineers.

#### Objectives

1. To establish a registered engineering company that develops IoT-based monitoring systems.
2. To provide the Corporation with a pilot system for remote monitoring of its assets within six months.
3. To reduce manual work and revenue loss through automation and accurate data.
4. To develop local skills and create jobs for at least 20 engineers and technicians.
5. To develop products that can later be sold to other organizations.

#### Conclusion

The company will bring modern technology to meet a real need of large organizations in Nepal. The idea is technically feasible, uses local talent and is financially sound, with a payback period of about three years. I request the Corporation to review this proposal and to give me an opportunity to present it in person, so that the pilot work can start soon.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What problem of large organizations does the abstract address?
   A. They have too much data
   B. Manual readings and paper records cause losses, delay and errors
   C. They have no offices
   D. They have too many engineers
   Answer: B. The company offers IoT monitoring to replace manual methods. (Key point: Problem in abstract)

2. What does the proposer request from the Corporation?
   A. Rs. 1.2 crore as a service contract advance and partnership
   B. The entire Rs. 1.8 crore as a gift
   C. Nothing
   D. Land only
   Answer: A. Of Rs. 1.8 crore investment, Rs. 1.2 crore is requested. (Key point: Request)

3. What does the second objective promise the Corporation?
   A. A building in one year
   B. A full national network in a month
   C. A free product forever
   D. A pilot remote-monitoring system within six months
   Answer: D. The pilot within six months demonstrates the value. (Key point: Pilot objective)

4. What does the conclusion request?
   A. To cancel the project
   B. To pay immediately without review
   C. To review the proposal and allow an in-person presentation
   D. To ignore the proposal
   Answer: C. A conclusion ends with a polite request for action. (Key point: Conclusion)

## Related in Communication English

- [Proposal to start a software company](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-software-company-ministry) — Communication English, chapter 6
- [Final project report: title page, abstract, recommendation](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Afinal-report-title-abstract-recommendation) — Communication English, chapter 8
- [Proposal for a paper factory](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-paper-factory-nepal) — Communication English, chapter 6
- [Proposal for a paper factory in Gorkha](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-paper-factory-gorkha) — Communication English, chapter 6
- [Proposal for computer lab: title, technical, cost](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-computer-lab-parts) — Communication English, chapter 6, asked 2×
- [Proposal for engineering college to local authority](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-engineering-college-local-authority) — Communication English, chapter 6

## Related in other subjects

- [Proposal objectives, limitations, questions answered](https://www.bctengineer.com/question.md?key=semester_7%2Fproject_engineering%3Aproposal-objectives-limitations-questions) — Project Engineering, chapter 2
- [IPR and company registration in Nepal](https://www.bctengineer.com/question.md?key=semester_8%2Fengineering_professional_practice%3Aipr-company-registration-nepal) — Engineering Professional Practice, chapter 5
- [Fault, parts, recognition, engineering problems](https://www.bctengineer.com/question.md?key=semester_3%2Fengineering_geology_i%3Afault-parts-recognition-engineering-problems) — Engineering Geology I, chapter 5
- [Legal provisions for starting a company in Nepal](https://www.bctengineer.com/question.md?key=semester_7%2Fentrepreneurship_development%3Acompany-registration-legal-provisions-nepal) — Entrepreneurship Development, chapter 8