# Proposal for public library

Communication English · Chapter 6: Writing Proposal

- Asked in: 2081 Chaitra (new course), 7 marks
- Video: [Project Proposal Writing: How to Write A Winning Project Proposal](https://www.youtube.com/watch?v=jsGBuu88WE0) — ProjectManager
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/communication_english/proposal-public-library
- Whole chapter: https://www.bctengineer.com/md/semester_5/communication_english/chapter-6

## Question

Prepare a proposal for construction of a public library building in your local town to be submitted to the Mayor of the concerned municipality. Show only the title page, abstract and cost estimate sections of the proposal.

## Answer

#### Title page

```text
                         PROPOSAL

CONSTRUCTION OF A PUBLIC LIBRARY BUILDING IN DHULIKHEL
MUNICIPALITY

Submitted to:
The Mayor
Dhulikhel Municipality, Kavrepalanchok

Submitted by:
Dhulikhel Reading Society
Dhulikhel-3, Kavre

15 November 2026
```

#### Abstract

Dhulikhel has about 30,000 residents, including many students, but it has no public library. Students and readers must travel to Kathmandu or depend on a few small private reading rooms. This proposal requests the support of Dhulikhel Municipality for constructing a two-storey public library building of about 3,500 square feet on the municipal land at Ward 3. The library will have a reading hall for 100 persons, a children's section, a computer and internet corner, and a stack room for 20,000 books. The work will be done in 12 months through a competitive bid, under the supervision of a technical committee of the municipality. The total cost is estimated at Rs. 1,14,45,000. We request the municipality to provide the land and 70 percent of the cost; the Reading Society will raise the rest from local donors. The library will improve literacy, support students and encourage a reading habit in the community.

#### Cost estimate

| S.N. | Item | Amount (Rs.) |
|---|---|---|
| 1 | Site preparation and foundation | 15,00,000 |
| 2 | RCC structure and walls | 45,00,000 |
| 3 | Roofing, doors and windows | 12,00,000 |
| 4 | Electrical, plumbing and internet wiring | 9,00,000 |
| 5 | Furniture, shelves and reading tables | 8,00,000 |
| 6 | Books, journals and computers | 15,00,000 |
| 7 | Design, supervision and administration | 5,00,000 |
| | **Sub-total** | **1,09,00,000** |
| | Contingency (5%) | 5,45,000 |
| | **Grand total** | **1,14,45,000** |

Prices are approximate and based on local rates; the final figures will be fixed after the detailed engineering estimate.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What does the abstract summarise?
   A. Only the author's biography
   B. Only the table of contents
   C. Problem, request, key features, time, cost and benefits in brief
   D. Only the references
   Answer: C. The abstract states the lack of a library, the plan, 12 months, the Rs. 1,14,45,000 cost, and the benefits. (Key point: Abstract content)

2. In the cost estimate, how is the contingency of Rs. 5,45,000 obtained?
   A. 10% of the sub-total
   B. 5% of the sub-total of Rs. 1,09,00,000
   C. 5% of the grand total
   D. A fixed amount
   Answer: B. 5% of 1,09,00,000 is 5,45,000, giving a grand total of 1,14,45,000. (Key point: Contingency calculation)

3. What does the Reading Society request from the municipality?
   A. Land and 70 percent of the cost
   B. All of the cost
   C. Only the land
   D. Only books
   Answer: A. The municipality provides land and 70 percent; the Society raises the rest. (Key point: Funding request)

## Related in Communication English

- [Final project report: title page, abstract, recommendation](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Afinal-report-title-abstract-recommendation) — Communication English, chapter 8
- [Proposal to start a company: title, abstract, objectives](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-company-big-organization) — Communication English, chapter 6
- [Proposal for computer lab: title, technical, cost](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-computer-lab-parts) — Communication English, chapter 6, asked 2×
- [Proposal for engineering college to local authority](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-engineering-college-local-authority) — Communication English, chapter 6
- [Proposal: technical, management, cost sections](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-hydropower-it-company-sections) — Communication English, chapter 6
- [Proposal for communication technology centre](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aproposal-communication-technology-centre) — Communication English, chapter 6

## Related in other subjects

- [Components of complete estimate; abstract cost](https://www.bctengineer.com/question.md?key=semester_7%2Festimating_and_costing%3Acomponents-complete-estimate-abstract) — Estimating and Costing, chapter 2
- [Prepare AOC, BOQ and summary of cost](https://www.bctengineer.com/question.md?key=semester_7%2Festimating_and_costing%3Aaoc-boq-summary-numerical) — Estimating and Costing, chapter 2
- [Quantity sheet and abstract for residential building](https://www.bctengineer.com/question.md?key=semester_7%2Festimating_and_costing%3Aquantity-sheet-abstract-residential) — Estimating and Costing, chapter 2
- [Job layout for 1000 sqm public building](https://www.bctengineer.com/question.md?key=semester_8%2Fconstruction_management%3Ajob-layout-public-building-2079) — Construction Management, chapter 6