# Report on communication in remote Nepal

Communication English · Chapter 9: Formal Reports

- Asked in: 2073 Shrawan, 10 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/communication_english/report-communication-system-remote-nepal
- Whole chapter: https://www.bctengineer.com/md/semester_5/communication_english/chapter-9

## Question

Write a report on "Development of communication system" in remote areas of Nepal. Invent necessary details.

## Answer

#### Title page

```text
                          REPORT

DEVELOPMENT OF COMMUNICATION SYSTEM IN REMOTE AREAS OF
NEPAL

Submitted to:
The Secretary
Ministry of Communication and Information Technology
Singha Durbar, Kathmandu

Submitted by:
Er. Bishal Thapa
Telecommunications Engineer

15 December 2026
```

#### Abstract

Communication is a basic need for development, but many remote areas of Nepal, particularly in the hills and mountains of Karnali and Sudurpashchim, still lack reliable telephone and internet services. This report reviews the present state of communication in five remote districts (Humla, Mugu, Jumla, Dolpa and Bajhang) and suggests a plan for development. A field survey of 20 villages shows that only 35 percent of households have a working mobile signal and fewer than 10 percent have internet. The main problems are difficult geography, lack of electricity, high cost and low population density. The report recommends solar-powered towers, community Wi-Fi, satellite links, fibre along new roads, and support from the Rural Telecommunication Development Fund.

#### Introduction

Good communication helps health services, schools, markets and emergency response. In remote areas, a message sometimes takes days to arrive on foot. During the COVID-19 pandemic, the lack of connectivity prevented students from taking online classes. The government has policies to bring telecom services to everyone, but progress in difficult areas is slow. This report aims to identify the present situation and the barriers, and to propose workable solutions. It is limited to five districts and to the last five years.

#### Findings

1. **Mobile coverage:** only 35 percent of households have a signal, and calls are often interrupted.
2. **Internet:** speeds are mostly at 2G level, and fewer than 10 percent of homes use data.
3. **Power:** many towers stop working when the electricity is cut off, and diesel supply is costly.
4. **Maintenance:** technicians have to walk for 2-3 days to reach some towers.
5. **Cost:** devices and data are expensive compared with incomes.
6. **Skills:** few people can use smartphones or online services.

#### Proposed development plan

1. Install 40 solar-powered mobile towers in uncovered villages using the Rural Telecommunication Development Fund.
2. Lay optical fibre along new roads and connect the district headquarters.
3. Set up a community information centre with Wi-Fi, computers and a trained local operator in each ward.
4. Use VSAT or low-earth-orbit satellite internet for the most remote villages.
5. Start community radio stations for local information and disaster warnings.
6. Train local technicians for repair and maintenance.
7. Provide low-cost phones and data packages to the poor.

#### Time and cost

The plan can be carried out in three years at an estimated cost of Rs. 85 crore, mainly from public funds, with contributions from the service providers.

#### Conclusion and recommendations

Communication is a right and a driver of development. If the plan is carried out, 90 percent of households can have basic connectivity within three years. We recommend that the Ministry approve the plan, issue licences with incentives, and ask the service providers to share infrastructure.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which are identified as main problems of communication in remote areas?
   A. Difficult geography, lack of electricity, high cost and low population
   B. Too many towers and cheap data
   C. Excess bandwidth
   D. Strong competition among providers
   Answer: A. The abstract lists geography, electricity, cost and low population. (Key point: Main problems)

2. Why do many towers stop working according to the findings?
   A. Electricity is cut off and diesel supply is costly
   B. Too many users
   C. Lack of antennas
   D. Tourists damage them
   Answer: A. Towers depend on power; when it fails, costly diesel is the only alternative. (Key point: Power and towers)

3. What is proposed for the most remote villages?
   A. Postal letters only
   B. VSAT or low-earth-orbit satellite internet
   C. Fibre along existing highways
   D. Nothing, as they are too small
   Answer: B. Satellite links reach places where towers and fibre are impractical. (Key point: Solutions for most remote villages)

4. What does the report state about time and cost of the plan?
   A. One year, Rs. 5 crore
   B. Three years, about Rs. 85 crore, mainly public funds with service providers
   C. Ten years, funded only by villagers
   D. Cost is not estimated
   Answer: B. The plan is estimated at three years and Rs. 85 crore. (Key point: Time and cost)

## Related in Communication English

- [Report on road construction in remote Nepal](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Areport-road-construction-remote-nepal) — Communication English, chapter 9
- [Report on development of IT in Nepal](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Areport-it-development-nepal-ministry) — Communication English, chapter 9
- [Letter report on mountain airports](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aletter-report-airports-mountainous-nepal) — Communication English, chapter 7
- [Monthly progress report on micro-hydro project](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Amonthly-progress-report-micro-hydro) — Communication English, chapter 7, asked 3×
- [Second quarterly progress report in memo format](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Aquarterly-progress-report-housing-memo) — Communication English, chapter 7
- [Report on micro hydro project (abstract to findings)](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Areport-micro-hydro-project-manager) — Communication English, chapter 8

## Related in other subjects

- [Areas of utilization of electrical energy in Nepal](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Autilization-areas-nepal-improve-consumption) — Utilization of Electrical Energy, chapter 1
- [Clean Development Mechanism in Nepal](https://www.bctengineer.com/question.md?key=semester_7%2Fenergy_environment_and_society%3Acdm-nepal-potential) — Energy Environment and Society, chapter 2
- [Status of irrigation development in Nepal](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Airrigation-status-nepal) — Irrigation and Drainage Engineering, chapter 1, asked 4×
- [Historical development of roads in Nepal](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3Ahistorical-development-roads) — Transportation Engineering I, chapter 1, asked 2×