title: "S-hydrograph from rectangular 1-hr UH"
subject: "Engineering Hydrology"
chapter: 5
key: "semester_5/engineering_hydrology:scurve-rectangular-1hr-uh"
source: https://www.bctengineer.com/q/semester_5/engineering_hydrology/scurve-rectangular-1hr-uh
site: BCT Engineering
---

# S-hydrograph from rectangular 1-hr UH

Engineering Hydrology · Chapter 5: Hydrograph Analysis

- Asked in: 2070 Chaitra, 6 marks
- Video: [Numerical on 'S' Curve Hydrograph (SSCJE/GATE/ESE/PSU's/DFCCIL/Railways)-Civil Engineering](https://www.youtube.com/watch?v=ChzzFVxNlm0) — Engineering Ace- By Varun Sir
- Answer checked by Claude Sonnet 5.5 on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/engineering_hydrology/scurve-rectangular-1hr-uh
- Whole chapter: https://www.bctengineer.com/md/semester_5/engineering_hydrology/chapter-5

## Question

A 1 hour unit hydrograph is given by a rectangle whose base is 4 hours and height is 0.25/hour. Construct an S-hydrograph using this UH.

## Short answer

Adding successive 1-h rectangular UHs (height0.25/h, base4 h) lagged by1 h: S-curve ordinates rise linearly to0.25,0.50,0.75,1.00 at1-4 h, then remain constant at equilibrium1.00 h⁻¹ for t≥4 h.

## Answer

The S-hydrograph (S-curve) is the hydrograph due to a continuous rain of 1 cm/h indefinitely. It is obtained by adding 1-h UHs, each lagged by 1 h:

$$
S(t) = U(t) + U(t-1) + U(t-2) + \dots
$$

The 1-h UH is a rectangle: height 0.25 per hour, base 4 h (area = 0.25 × 4 = 1 cm ✓). Between 0 and 1 h it has ordinate 0.25, between 1 and 2 h 0.25, and so on up to 4 h.

#### Construction (ordinates over each hour)
| Time interval (h) | Number of UHs active | S-curve ordinate (per h) |
|---|---|---|
| 0 – 1 | 1 | 0.25 |
| 1 – 2 | 2 | 0.50 |
| 2 – 3 | 3 | 0.75 |
| 3 – 4 | 4 | 1.00 |
| 4 – 5 | 4 (the first UH has ended, the fifth starts) | 1.00 |
| > 4 | 4 | 1.00 (equilibrium) |

Since each UH rectangle lasts only 4 h, the maximum number of overlapping UHs is 4, so the S-curve reaches its equilibrium value 1.00 at t = 4 h (= base time of the UH) and stays there.

```text
 S (per h)
 1.00 |           ___________________
      |        /
 0.75 |      /
 0.50 |    /
 0.25 |  /
    0 +--+--+--+--+--+--+--+-- t (h)
      0  1  2  3  4  5  6
```

**Answer: S(t) = 0.25 t for 0 ≤ t ≤ 4 h (0.25, 0.50, 0.75, 1.00 at the ends of hours 1 to 4), then constant at 1.00 per hour.** The equilibrium value equals 1 cm/h, the intensity of the continuous rain, as it should.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. How is the S-curve built from a 1-h UH?
   A. Add 1-h UHs each lagged by 1 h
   B. Subtract successive UHs lagged by 1 h
   C. Multiply the UH by time
   D. Integrate the UH once and halve it
   Answer: A. S(t) = U(t) + U(t-1) + U(t-2) + ... (Key point: S-curve construction)

2. The UH is a rectangle of base 4 h. When does the S-curve reach equilibrium?
   A. At t = 1 h
   B. At t = 4 h, the UH base time, when 4 UHs overlap
   C. At t = 2 h
   D. Never; it keeps rising
   Answer: B. The maximum overlap is 4 rectangles, reached at t = 4 h. (Key point: Equilibrium time)

3. What is the equilibrium ordinate (0.25 x 4)?
   A. 0.25 per hour
   B. 4.00 per hour
   C. 1.00 per hour, equal to the 1 cm/h continuous rain intensity
   D. 0.50 per hour
   Answer: C. 4 x 0.25 = 1.00, matching the unit intensity. (Key point: Equilibrium value)

## Related in Engineering Hydrology

- [Flood hydrograph from 4-h UH, three 2-hr rainfalls](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-4h-uh-3-2) — Engineering Hydrology, chapter 5, asked 2×
- [Construct 3-h UH and flood hydrograph, 524.88 ha](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-3h-triangular-524-88ha) — Engineering Hydrology, chapter 5
- [Flood hydrograph from 4-h UH, 50 m3/s base](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-4h-uh-3-5) — Engineering Hydrology, chapter 5, asked 2×
- [Derive 4-hr UH from triangular direct runoff hydrograph](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Atriangular-dro-4hr-uh) — Engineering Hydrology, chapter 5
- [2-hr UH and flood hydrograph from storm](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-2h-from-4h-three-storms) — Engineering Hydrology, chapter 5
- [S-curve: 2-hr hydrograph from 4-hr UH](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Ascurve-4hr-to-2hr-12-5) — Engineering Hydrology, chapter 5

## Related in other subjects

- [Rectangular sedimentation tank, 0.2 mm/s, 3 hours](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ased-c71) — Water Supply Engineering, chapter 6, asked 2×
- [Per unit circuit of three-generator system, 30 MVA base](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Apu-circuit-30mva-g1-g2-g3) — Power System Analysis I, chapter 3
- [FT of unit impulse and rectangular pulse](https://www.bctengineer.com/question.md?key=semester_4%2Fsignals_and_systems%3Aft-impulse-rectangular-pulse) — Signals and Systems, chapter 3