# 2-hr UH and flood hydrograph from storm

Engineering Hydrology · Chapter 5: Hydrograph Analysis

- Asked in: 2075 Asoj, 12 marks
- Video: [Unit Hydrograph to Flood Hydrograph || Derivation of Flood Hydrograph from Unit Hydrograph](https://www.youtube.com/watch?v=8ZXviXtKVdk) — Engineering School
- Answer checked by Claude Sonnet 5.5 on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/engineering_hydrology/uh-2h-from-4h-three-storms
- Whole chapter: https://www.bctengineer.com/md/semester_5/engineering_hydrology/chapter-5

## Question

The ordinates of 4 hr unit hydrograph are given below.

| Time (hr) | 0 | 2 | 4 | 6 | 8 | 10 | 12 | 14 | 16 | 18 | 20 | 22 | 24 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 4-hr UH ordinates (m$^3$/s) | 0 | 9 | 12 | 28 | 40 | 52 | 49 | 36 | 29 | 20 | 13 | 10 | 0 |

The storm has successive 2 hr, 4 hr and 6 hr rainfall of 2.5, 8.0 and 9.0 cm respectively. $\phi$-index is of 0.15 cm/hr and base flow of 40 m$^3$/s. Determine the 2 hr UH and resulting flood hydrograph from above storm.

## Short answer

Using the S-curve method, the 2-h UH ordinates at 0,2,…,24 h are 0, 15, 20, 34, 46, 50.5, 42.5, 32.5, 24.5, 16.5, 11.5, 5, 0 m³/s. The resulting flood hydrograph with 40 m³/s baseflow peaks at about 726 m³/s at 14 h.

## Answer

#### Part 1: 2-h UH from the 4-h UH (S-curve method)
$S(t)=U_4(t)+S(t-4)$, and $U_2(t)=\dfrac{4}{2}\left[S(t)-S(t-2)\right]$ (the S-curve lagged by the new duration, 2 h, and scaled by $4/2$).

The raw S-curve points zig-zag because the ordinates of the given 4-h UH are irregular. A smooth S-curve is drawn through them (3-point smoothing of the ordinates, ending at the mean equilibrium value 149 m$^3$/s). Differences are taken from the smooth curve.

| t (h) | $U_4$ | Raw $S$ | Smoothed $S$ | $U_2=2\,[S(t)-S(t-2)]$ |
|---|---|---|---|---|
| 0 | 0 | 0 | 0 | 0 |
| 2 | 9 | 9 | 7.5 | 15 |
| 4 | 12 | 12 | 17.5 | 20 |
| 6 | 28 | 37 | 34.5 | 34 |
| 8 | 40 | 52 | 57.5 | 46 |
| 10 | 52 | 89 | 82.75 | 50.5 |
| 12 | 49 | 101 | 104 | 42.5 |
| 14 | 36 | 125 | 120.25 | 32.5 |
| 16 | 29 | 130 | 132.5 | 24.5 |
| 18 | 20 | 145 | 140.75 | 16.5 |
| 20 | 13 | 143 | 146.5 | 11.5 |
| 22 | 10 | 155 | 149 | 5 |
| 24 | 0 | 143 | 149 | 0 |

(The sum of the $U_2$ ordinates is 298, equal to the sum of the $U_4$ ordinates, so the volume of 1 cm is conserved.)

#### Part 2: Effective rainfall ($\phi=0.15$ cm/h)
| Storm | Rain (cm) | Loss $\phi t$ (cm) | ER (cm) | ER per 2 h block |
|---|---|---|---|---|
| 0-2 h | 2.5 | 0.30 | 2.2 | 2.2 |
| 2-6 h | 8.0 | 0.60 | 7.4 | 3.7, 3.7 |
| 6-12 h | 9.0 | 0.90 | 8.1 | 2.7, 2.7, 2.7 |

#### Part 3: Flood hydrograph
$Q(t)=40+\sum_j P_j\,U_2(t-2j)$ with $P=(2.2,3.7,3.7,2.7,2.7,2.7)$.

| t (h) | $U_2$ | 2.2 U(t) | 3.7 U(t-2) | 3.7 U(t-4) | 2.7 U(t-6) | 2.7 U(t-8) | 2.7 U(t-10) | Q (m$^3$/s) |
|---|---|---|---|---|---|---|---|---|
| 0 | 0 | 0.0 | 0 | 0 | 0 | 0 | 0 | 40.0 |
| 2 | 15 | 33.0 | 0.0 | 0 | 0 | 0 | 0 | 73.0 |
| 4 | 20 | 44.0 | 55.5 | 0.0 | 0 | 0 | 0 | 139.5 |
| 6 | 34 | 74.8 | 74.0 | 55.5 | 0.0 | 0 | 0 | 244.3 |
| 8 | 46 | 101.2 | 125.8 | 74.0 | 40.5 | 0.0 | 0 | 381.5 |
| 10 | 50.5 | 111.1 | 170.2 | 125.8 | 54.0 | 40.5 | 0.0 | 541.6 |
| 12 | 42.5 | 93.5 | 186.9 | 170.2 | 91.8 | 54.0 | 40.5 | 676.9 |
| 14 | 32.5 | 71.5 | 157.2 | 186.9 | 124.2 | 91.8 | 54.0 | 725.6 |
| 16 | 24.5 | 53.9 | 120.2 | 157.2 | 136.4 | 124.2 | 91.8 | 723.8 |
| 18 | 16.5 | 36.3 | 90.7 | 120.2 | 114.8 | 136.4 | 124.2 | 662.5 |
| 20 | 11.5 | 25.3 | 61.1 | 90.7 | 87.8 | 114.8 | 136.4 | 555.9 |
| 22 | 5 | 11.0 | 42.6 | 61.1 | 66.2 | 87.8 | 114.8 | 423.2 |
| 24 | 0 | 0.0 | 18.5 | 42.6 | 44.6 | 66.2 | 87.8 | 299.5 |
| 26 | 0 | 0 | 0.0 | 18.5 | 31.1 | 44.6 | 66.2 | 200.2 |
| 28 | 0 | 0 | 0 | 0.0 | 13.5 | 31.1 | 44.6 | 129.1 |
| 30 | 0 | 0 | 0 | 0 | 0.0 | 13.5 | 31.1 | 84.5 |
| 32 | 0 | 0 | 0 | 0 | 0 | 0.0 | 13.5 | 53.5 |
| 34 | 0 | 0 | 0 | 0 | 0 | 0 | 0.0 | 40.0 |
| 36 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 40.0 |

**Answer: The 2-h UH ordinates (0, 2, ..., 24 h) are 0, 15, 20, 34, 46, 50.5, 42.5, 32.5, 24.5, 16.5, 11.5, 5, 0 m$^3$/s. The flood hydrograph, including base flow of 40 m$^3$/s, peaks at about 726 m$^3$/s at 14 h.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. The 2-h UH from the 4-h S-curve is:
   A. U2 = 2[S(t) - S(t-2)]
   B. U2 = 0.5[S(t) - S(t-2)]
   C. U2 = 2[S(t) - S(t-4)]
   D. U2 = S(t) - S(t-2)
   Answer: A. Ratio 4/2 = 2 scales the difference. (Key point: 2-h UH formula)

2. For the 6 h storm of 9.0 cm with phi = 0.15 cm/h, ER is:
   A. 8.1 cm
   B. 7.4 cm
   C. 9.0 cm
   D. 8.85 cm
   Answer: A. 9.0 - 0.15 x 6 = 8.1 cm, split as 2.7 cm per 2 h block. (Key point: Effective rain)

3. The 2-6 h storm of 8 cm gives effective 7.4 cm; per 2 h block this is:
   A. 3.7 cm, 3.7 cm
   B. 7.4 cm
   C. 2.5 cm each
   D. 4 cm, 3.4 cm
   Answer: A. Uniform intensity gives equal ER per block. (Key point: Blocks)

4. The sum of U2 ordinates equals the sum of U4 ordinates (298) because:
   A. 1 cm volume is conserved
   B. Both are peaks
   C. Base flow equal
   D. Storm equal
   Answer: A. Both are UHs of 1 cm over the same area. (Key point: Volume check)

## Related in Engineering Hydrology

- [Storm hydrograph from 6-h UH, 3-hr storm](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Astorm-hydrograph-6h-uh-3hr-storm) — Engineering Hydrology, chapter 5, asked 2×
- [Flood hydrograph from 4-h UH, three 2-hr rainfalls](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-4h-uh-3-2) — Engineering Hydrology, chapter 5, asked 2×
- [S-curve: 2-hr hydrograph from 4-hr UH](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Ascurve-4hr-to-2hr-12-5) — Engineering Hydrology, chapter 5
- [Flood hydrograph from 6-hr UH, two storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-3-3-5-5cm) — Engineering Hydrology, chapter 5
- [Flood hydrograph from 4-h UH, 50 m3/s base](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-4h-uh-3-5) — Engineering Hydrology, chapter 5, asked 2×
- [Flood hydrograph from 6-h UH, three storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-6h-three-storms-30cumec) — Engineering Hydrology, chapter 5

## Related in other subjects

- [Subnet 202.70.91.0/24 for 25, 16, 29, 11](https://www.bctengineer.com/question.md?key=semester_7%2Fcomputer_networks_and_security%3Asubnetting-202-70-91) — Computer Networks and Security, chapter 4, asked 2×