---
title: "UH derivation from complex storms"
subject: "Engineering Hydrology"
chapter: 5
key: "semester_5/engineering_hydrology:uh-complex-storms-procedure"
source: https://www.bctengineer.com/q/semester_5/engineering_hydrology/uh-complex-storms-procedure
site: BCT Engineering
---

# UH derivation from complex storms

Engineering Hydrology · Chapter 5: Hydrograph Analysis

- Asked in: 2072 Chaitra, 8 marks
- Video: [4-Hour Unit Hydrograph Derivation | Complex Storm Hydrograph Numerical Explained #civilengineering](https://www.youtube.com/watch?v=mMmzhQtRPmo) — Class 1 to B.Tech(Civil) 
- Answer checked by Claude Sonnet 5.5 on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/engineering_hydrology/uh-complex-storms-procedure
- Whole chapter: https://www.bctengineer.com/md/semester_5/engineering_hydrology/chapter-5

## Question

Describe the procedure of derivation of unit hydrograph from complex storms using appropriate expressions.

## Short answer

Separate baseflow to obtain DRH; compute net rainfall for each period. Solve the convolution equations forward: U₁ = Q₁/P₁, Uₙ = (Qₙ − Σ Pₘ Uₙ₋ₘ₊₁ for m>1) / P₁. Check that the volume equals 1 cm runoff; smooth or use least-squares if oscillations occur.

## Answer

A unit hydrograph (UH) derived from a complex storm uses a direct runoff hydrograph (DRH) that results from several successive periods of rainfall excess of different intensity. Because the UH ordinates cannot be read off directly as in a single burst, the DRH is **deconvoluted** using the convolution (discrete) equation.

#### Basic equation
If the net rain in successive periods of duration $D$ is $P_1, P_2, \dots, P_M$ (cm), the UH of duration $D$ has ordinates $U_1, U_2, \dots, U_N$, and the DRH has ordinates $Q_1, Q_2, \dots, Q_n$, then

$$
Q_n = \sum_{m=1}^{n\le M} P_m\, U_{n-m+1}, \qquad n = M+N-1
$$

Writing it out for each ordinate:

$$
\begin{aligned} Q_1 &= P_1U_1 \\ Q_2 &= P_1U_2 + P_2U_1 \\ Q_3 &= P_1U_3 + P_2U_2 + P_3U_1 \\ &\ \ \vdots \end{aligned}
$$

#### Procedure
1. Select a storm with several periods of rain of uniform duration $D$ over the whole basin, and its stream-flow record.
2. Separate base flow from the storm hydrograph to get the DRH ordinates $Q_n$ at intervals $D$.
3. Compute the rainfall excess $P_m$ of each period by deducting losses (φ-index or a loss model). A period with no excess stays in the sequence as $P_m=0$, because it only shifts the later periods in time.
4. Number of UH ordinates $N = n - M + 1$ (n = number of DRH ordinates, M = number of excess-rain periods).
5. Solve the equations successively (forward substitution):

$$
U_1=\frac{Q_1}{P_1},\quad U_2=\frac{Q_2-P_2U_1}{P_1},\quad U_3=\frac{Q_3-P_2U_2-P_3U_1}{P_1},\ \dots
$$

6. Check: the area of the derived UH must equal 1 cm of runoff over the basin: $\sum U_i \cdot D\cdot 3600 = A\times 0.01$ m. Adjust (smooth) the ordinates if needed.
7. Plot the UH and, if necessary, re-compute the DRH from it to confirm that it reproduces the observed DRH.

#### Remarks
- Forward substitution accumulates errors, so ordinates may oscillate or become negative. In that case the **least-squares** (matrix) form $\mathbf{Q}=[\mathbf{P}]\mathbf{U}$, with $\mathbf{U}=(\mathbf{P}^T\mathbf{P})^{-1}\mathbf{P}^T\mathbf{Q}$, or a trial-and-error / optimisation approach with a non-negative constraint is used (Collins' method: assume a UH, compute the DRH, correct the UH, and repeat).
- The UH obtained from the average of several storms is more reliable.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. With M excess-rain periods and DRH ordinates n, the number of UH ordinates N is:
   A. n - M + 1
   B. n + M - 1
   C. n x M
   D. n - M
   Answer: A. n = M + N - 1, so N = n - M + 1. (Key point: Equation)

2. U3 is computed as:
   A. (Q3 - P2 U2 - P3 U1)/P1
   B. Q3/P3
   C. (Q3 - P1 U2)/P2
   D. Q3/P1
   Answer: A. Q3 = P1U3 + P2U2 + P3U1. (Key point: Forward substitution)

3. If forward substitution gives oscillating or negative ordinates, one should:
   A. Use least-squares or Collins' trial-and-error method
   B. Ignore
   C. Increase P
   D. Remove baseflow again
   Answer: A. Least-squares with U = (P^T P)^-1 P^T Q reduces error accumulation. (Key point: Error accumulation)

4. The derived UH is verified by checking that:
   A. Its area equals 1 cm over the basin
   B. Peak equals Q1
   C. Sum equals P
   D. Base equals 0
   Answer: A. Sum U x D x 3600 = A x 0.01 m. (Key point: Check)

## Related in Engineering Hydrology

- [Unit hydrograph and UH for multiple storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-define-multiple-storm) — Engineering Hydrology, chapter 5, asked 2×
- [Flood hydrograph from 6-h UH, three storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-6h-three-storms-30cumec) — Engineering Hydrology, chapter 5
- [Flood hydrograph from 6-hr UH, two storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aflood-hydrograph-3-3-5-5cm) — Engineering Hydrology, chapter 5
- [Derive UH from storm, peak flow from two storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-from-storm-then-peak-two) — Engineering Hydrology, chapter 5
- [6-h UH and flood from two storms, 700 km2](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-6h-700km2-two-storms) — Engineering Hydrology, chapter 5
- [2-hr UH from figure: area, flood, Tc, two storms](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Auh-2hr-figure-four-parts) — Engineering Hydrology, chapter 5

## Related in other subjects

- [Derivation and phasor diagram of complex power](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Acomplex-power-derivation-phasor) — Power System Analysis I, chapter 3
