# Equal area criterion for transient stability

Power System Analysis II · Chapter 6: Power System Stability

- Asked in: 2073 Shrawan, 6 marks; 2073 Chaitra, 8 marks; 2072 Kartik, 8 marks; 2071 Shrawan, 6 marks (asked 4 times)
- Video: [Equal Area Criterion - Power System Stability - Power System 3](https://www.youtube.com/watch?v=G6_VtQq0J2c) — Ekeeda
- Answer checked by Claude Sonnet 5.5 on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/power_system_analysis_ii/equal-area-criterion-concept
- Whole chapter: https://www.bctengineer.com/md/semester_5/power_system_analysis_ii/chapter-6

## Question

Explain the Equal area criterion (concept) to study (evaluate) the transient stability of a single machine system connected to infinite bus with proper mathematical aids and diagram.

## Short answer

Equal area criterion states a single machine-infinite bus system is transiently stable if the accelerating area (where Pm > Pe) equals the decelerating area (where Pe > Pm) on the power-angle curve. Derived by integrating the swing equation: ∫(Pm-Pe)dδ = 0 from δ0 to δmax. Stability requires fault clearing before critical clearing angle where areas just balance.

## Answer

The **equal area criterion (EAC)** is a graphical method to check the transient stability of a single machine connected to an infinite bus (or of two machines) without solving the swing equation step by step. It states that the system is stable if, after a disturbance, the area of accelerating energy under the power-angle curve can be balanced by an equal area of decelerating energy.

#### Basis
For a machine connected to an infinite bus, the swing equation (in pu, resistance and damping neglected) is
$$
\frac{2H}{\omega_s}\frac{d^2\delta}{dt^2} = P_m - P_e = P_a, \qquad P_e = P_{max}\sin\delta = \frac{EV}{X}\sin\delta
$$
Multiplying both sides by $2\dfrac{d\delta}{dt}$:
$$
\frac{2H}{\omega_s}\cdot 2\frac{d\delta}{dt}\frac{d^2\delta}{dt^2} = 2(P_m - P_e)\frac{d\delta}{dt}
\;\Rightarrow\;
\frac{d}{dt}\left(\frac{d\delta}{dt}\right)^2 = \frac{\omega_s}{H}(P_m - P_e)\frac{d\delta}{dt}
$$
Integrating from the initial angle $\delta_0$ (where $d\delta/dt = 0$, the rotor runs at synchronous speed):
$$
\left(\frac{d\delta}{dt}\right)^2 = \frac{\omega_s}{H}\int_{\delta_0}^{\delta}(P_m - P_e)\,d\delta
$$
For the machine to be stable, the rotor angle must stop increasing at some maximum angle, i.e. $d\delta/dt = 0$ at $\delta_{max}$:
$$
\int_{\delta_0}^{\delta_{max}}(P_m - P_e)\,d\delta = 0
$$
This means the **area under the $P_a$–$\delta$ curve must be zero**: the accelerating area $A_1$ (where $P_m > P_e$) must be equal to the decelerating area $A_2$ (where $P_e > P_m$):
$$
A_1 = \int_{\delta_0}^{\delta_c}(P_m - P_e)\,d\delta = A_2 = \int_{\delta_c}^{\delta_{max}}(P_e - P_m)\,d\delta
$$

#### Power-angle diagram
```text
 Pe
  ^          Pmax1 sin d (pre-fault)
  |           .-''-.
  |         .' .--. '.    Pmax3 sin d
  |        / .' A2 '. \   (post-fault)
 Pm-------+-+-------+--\------
  |      /|A1|        \ \
  |     / |..|.....     \ \  Pmax2 sin d
  +----+--+--+--------+--+--> d
       0  d0 dc     dmax 180
 A1: accelerating area, A2: decelerating area
```

#### Applying it to a fault (sudden disturbance)
1. **Before the fault:** the machine runs at $\delta_0$, where $P_m = P_{max1}\sin\delta_0$.
2. **During the fault:** the transfer reactance rises, the power curve drops to $P_{max2}\sin\delta$ ($P_{max2} = 0$ for a fault at the generator bus). Since $P_m > P_e$, the rotor accelerates and $\delta$ increases. The energy gained is area $A_1$.
3. **Fault cleared at $\delta_c$:** the post-fault curve $P_{max3}\sin\delta$ applies. Now $P_e > P_m$, so the rotor decelerates, but $\delta$ keeps increasing until the kinetic energy is given back. This is area $A_2$.
4. **Stability test:** the system is stable if $A_2$ can become equal to $A_1$ before $\delta$ reaches $\delta_{max} = 180^\circ - \sin^{-1}(P_m/P_{max3})$. The rotor then swings back and oscillates about the new operating point. If the available $A_2 < A_1$, the machine loses synchronism.

#### Critical clearing angle
The largest clearing angle for which $A_1 = A_2$ just holds (with $\delta$ reaching exactly $\delta_{max}$) is the critical clearing angle:
$$
\cos\delta_{cr} = \frac{P_m(\delta_{max} - \delta_0) + P_{max3}\cos\delta_{max} - P_{max2}\cos\delta_0}{P_{max3} - P_{max2}}
$$
For a fault at the generator terminals with no change in network ($P_{max2} = 0$, $P_{max3} = P_{max}$, $\delta_{max} = \pi - \delta_0$):
$$
\delta_{cr} = \cos^{-1}\left[(\pi - 2\delta_0)\sin\delta_0 - \cos\delta_0\right]
$$
and, since $P_e = 0$ during the fault, the critical clearing time is
$$
t_{cr} = \sqrt{\frac{4H(\delta_{cr} - \delta_0)}{\omega_s P_m}}
$$

#### Assumptions and limitation
- Mechanical input $P_m$ constant during the transient; damping and resistance neglected.
- Machine represented by a constant voltage behind transient reactance.
- Valid only for one machine against an infinite bus (or two machines); for multi-machine systems, numerical solution of swing equations is needed.

**Example:** with $P_m = 1$ pu and $P_{max} = 2$ pu, $\delta_0 = 30^\circ$; for a terminal fault $\delta_{cr} = \cos^{-1}[(\pi - 1.047)(0.5) - 0.866] = \cos^{-1}(0.181) = 79.6^\circ$.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What does the equal area criterion require for stability?
   A. Accelerating area A1 is greater than A2
   B. Pm = Pmax
   C. Pe is zero throughout
   D. Accelerating area A1 equals decelerating area A2 before delta reaches delta_max
   Answer: D. The integral of (Pm - Pe) must vanish at the angle where speed returns to synchronous. (Key point: Stability condition)

2. The criterion comes from integrating the swing equation, giving (d delta/dt)^2 proportional to:
   A. The integral of (Pm - Pe) d delta
   B. Pm x delta
   C. Pmax sin delta
   D. H only
   Answer: A. Multiplying by 2 d delta/dt and integrating gives speed deviation squared proportional to the area under Pa. (Key point: Origin of area rule)

3. The critical clearing angle is the clearing angle for which:
   A. A1 = 0
   B. The fault lasts 1 s
   C. Pm = Pe during fault
   D. A2 just equals A1 with delta reaching delta_max
   Answer: D. Beyond it, available A2 is smaller than A1 and the machine loses synchronism. (Key point: Critical clearing angle)

4. For a terminal fault, what is true during the fault and for tcr?
   A. Pe = Pmax, tcr infinite
   B. Pe = 0, so the rotor accelerates under Pm and tcr = sqrt(4H(dcr - d0)/(ws Pm))
   C. Pe = Pm
   D. Pm = 0
   Answer: B. Pmax2 = 0 so Pe = 0, constant acceleration gives that tcr formula. (Key point: Fault at generator terminals)

## Related in Power System Analysis II

- [Voltage stability; transient study assumptions](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Avoltage-stability-transient-assumptions) — Power System Analysis II, chapter 6
- [EAC for a two machine system](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Aeac-two-machine-system) — Power System Analysis II, chapter 6
- [Critical clearing angle/time, fault at infinite bus](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Acritical-clearing-infinite-bus-h5) — Power System Analysis II, chapter 6
- [Rotor angle and swing equation, infinite bus](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Arotor-angle-swing-equation) — Power System Analysis II, chapter 6
- [Critical clearing, fault at infinite bus, H = 6](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Acritical-clearing-fault-infinite-bus-h6) — Power System Analysis II, chapter 6
- [Methods of improving transient stability](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Atransient-stability-improvement-methods) — Power System Analysis II, chapter 6, asked 3×

## Related in other subjects

- [Proper vs improper handoff; cellular concept N = 7](https://www.bctengineer.com/question.md?key=semester_7%2Fwireless_communication%3Ahandoff-situation-cellular-n7) — Wireless Communication, chapter 2
- [Power transfer and pf of motor on infinite bus](https://www.bctengineer.com/question.md?key=semester_5%2Felectric_machines_ii%3Amotor-infinite-bus-power-transfer) — Electric Machines II, chapter 2
- [Infinite bus and advantages of HVDC](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Ainfinite-bus-hvdc-advantages) — Power System Analysis I, chapter 1
- [Limitations of single bus system](https://www.bctengineer.com/question.md?key=semester_5%2Fcomputer_organization_and_architecture%3Asingle-bus-limit) — Computer Organization and Architecture, chapter 1, asked 2×