title: "Rapid sand filter design for 25 MLD"
subject: "Water Supply Engineering"
chapter: 6
key: "semester_5/water_supply_engineering:rsf-b81"
source: https://www.bctengineer.com/q/semester_5/water_supply_engineering/rsf-b81
site: BCT Engineering
---

# Rapid sand filter design for 25 MLD

Water Supply Engineering · Chapter 6: Water Treatment

- Asked in: 2081 Bhadra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/water_supply_engineering/rsf-b81
- Whole chapter: https://www.bctengineer.com/md/semester_5/water_supply_engineering/chapter-6

## Question

Design a rapid sand filter for treating 25 MLD of water. Also draw a proper sketch showing the dimensions of RSF.

## Short answer

6 filters (+1 standby), each 6.7 m × 5.4 m in plan, total area 217 m². Rate 5 m/h. Depth: freeboard 0.5 m, water 1.5 m, sand 0.7 m, gravel 0.45 m, underdrain 0.3 m; overall 3.45 m.

## Answer

#### Design data (assumed)
- Flow $Q=25$ MLD $=25\,000$ m³/day
- Rate of filtration 5 m/h $=120$ m³/m²/day (range 3 to 6 m/h)
- 4 % of the filtered water is used for backwashing
- Operation 24 h/day; $L:B=1.25$ (1.25 to 1.33)

#### Step 1: Design flow and total filter area
$$
Q'=25\,000\times1.04=26000\ \text{m}^3/\text{day}=1083.3\ \text{m}^3/\text{h}
$$
$$
A_{total}=\frac{Q'}{\text{rate}}=\frac{1083.3}{5}=216.7\ \text{m}^2
$$

#### Step 2: Number and size of units
$N=1.22\sqrt{Q}$ (Q in MLD) $=1.22\sqrt{25}=6.1$. Adopt **6 units** (plus 1 standby).
$$
A_{unit}=\frac{216.7}{6}=36.11\ \text{m}^2,\qquad B=\sqrt{\frac{36.11}{1.25}}=5.37\ \text{m},\quad L=1.25B
$$
Adopt $B=5.4$ m, $L=6.7$ m ($A=36.18$ m²).
Check: actual rate $=1083.3/(6\times36.18)=4.99$ m/h; when one unit is being washed, the rate in the other 5 is 5.99 m/h (acceptable, close to 6 m/h).

#### Step 3: Depth of the unit
| Layer | Depth (m) |
|---|---|
| Free board | 0.5 |
| Water above sand | 1.5 |
| Sand (ES 0.45 to 0.7 mm, UC 1.3 to 1.7) | 0.7 |
| Gravel (4 layers, 2 to 50 mm) | 0.45 |
| Under-drain and manifold space | 0.3 |
| **Total** | **3.45** |

#### Step 4: Under-drainage
- Perforated area $=0.3\%$ of bed area $=0.003\times36.18=0.109$ m². With 12 mm orifices (area $1.13\times10^{-4}$ m²): 960 orifices.
- Central manifold along the length, with laterals on both sides at 0.3 m c/c: 44 laterals, about 22 holes each.
- Total lateral area $\approx2\times$ orifice area $=0.217$ m²; manifold area $\approx2\times$ lateral area $=0.434$ m² (diameter about 0.74 m).

#### Step 5: Backwash
Rate 0.6 m/min (36 m/h) for 10 min: flow $=0.6\times36.18/60=0.362$ m³/s; volume per wash $=217$ m³ per unit, which is about 5 % of a unit's daily output ($26\,000/6=4333$ m³/day). Wash-water troughs are provided above the sand.

```text
 SECTION (one unit)
  inlet                           wash-water trough
    |      _____________________________|__
    v     |  FB 0.5 m                       |
    ----> |~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~| water 1.5 m
          |.................................|
          |   sand 0.7 m                    |
          |---------------------------------|
          |   gravel 0.45 m                 |
          |---+----+----+----+----+----+----|
          |   laterals (0.3 m) / manifold   | -> filtered
          |_________________________________|    water out
              wash-water in ^   wash waste out ->
```

**Answer: 6 rapid sand filters (+1 standby), each 6.7 m $\times$ 5.4 m in plan and about 3.45 m deep.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Why is the design flow taken as 1.04 × 25 000 m^3/day?
   A. 4 % of the filtered water is used for backwashing
   B. 4 % is lost to evaporation
   C. It allows for 4 % population growth
   D. It is a safety factor for filter rate
   Answer: A. The filters must produce the supply plus the wash water, so Q' = 1.04Q. (Key point: Design flow)

2. How is the total filter area obtained?
   A. A = Q'/ (wash rate) 
   B. A = Q'/rate of filtration = 1083.3/5 = 216.7 m^2
   C. A = Q' × rate
   D. A = Q/ (L:B)
   Answer: B. Area equals design flow per hour divided by the filtration rate in m/h. (Key point: Total area)

3. How many filter units are adopted and how is it estimated?
   A. 25 units from Q in MLD
   B. 2 units from N = Q/12
   C. 6 units from N = 1.22 sqrt(Q in MLD), plus 1 standby
   D. 4 units from N = L/B
   Answer: C. N = 1.22 sqrt(25) = 6.1, so 6 units are adopted. (Key point: Number of units)

4. Why is the rate checked with one unit out of service?
   A. The rate falls to 4 m/h
   B. The wash water increases the area
   C. The rate must exceed 10 m/h
   D. The remaining 5 units carry the full flow at about 5.99 m/h, near the 6 m/h upper limit
   Answer: D. When one unit is being washed the flow is shared by N-1 units, so the rate rises; it must stay within the allowed range. (Key point: Rate during washing)

## Related in Water Supply Engineering

- [Rapid sand filter design, 50,000 population](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-c72) — Water Supply Engineering, chapter 6
- [Rapid sand filter construction and working](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-construction-working) — Water Supply Engineering, chapter 6, asked 5×
- [Rapid sand filter for 5000 persons](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-k78) — Water Supply Engineering, chapter 6
- [Rapid sand filter, 45,000 population in 2021](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-a76) — Water Supply Engineering, chapter 6
- [Rapid sand filter for 60000 population](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-c69) — Water Supply Engineering, chapter 6
- [Slow sand filter versus rapid sand filter](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-vs-rsf) — Water Supply Engineering, chapter 6

## Related in other subjects

- [HR trickling filter, 2.5 MLD; change if standard](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Atrickling-hr-2p5mld-std-compare) — Sanitary Engineering, chapter 7
- [HR trickling filter, 5 MLD, RR 1.3](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Atrickling-single-stage-5mld-rr1p3) — Sanitary Engineering, chapter 7
- [Grit chamber for 58 MLD at 25°C](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Agrit-58mld-25c) — Sanitary Engineering, chapter 7
- [HR trickling filter, 5 MLD, RR 1.5](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Atrickling-hr-5mld-rr1p5) — Sanitary Engineering, chapter 7, asked 2×