# Slow sand filter, 15000 present population

Water Supply Engineering · Chapter 6: Water Treatment

- Asked in: 2076 Chaitra, 5+3 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_5/water_supply_engineering/ssf-c76
- Whole chapter: https://www.bctengineer.com/md/semester_5/water_supply_engineering/chapter-6

## Question

Determine the size of slow sand filter for a present population of 15000 nos, design period = 20 yrs, annual population growth rate = 2.5%, water consumption = 45 lpcd, and also draw the section of slow sand filter.

## Short answer

Design population 24,579, flow 1106 m³/d at 0.2 m³/m²/h. Use 3 working plus 1 standby beds, each 6.2 m × 12.4 m (76.9 m²), total depth 2.7 m (free board 0.3 m, water 1.0 m, sand 0.9 m, gravel 0.3 m, underdrain 0.2 m).

## Answer

The design population is found for the end of the 20-year design period. A filtration rate of 0.2 m³/m²/h is assumed.

#### Step 1: Design flow
- Population forecast (geometric increase): $P_n = P_0(1+r)^n = 15,000\times(1+0.025)^{20} = 24,579$ 
- Daily demand $Q = 24,579 \times 45/1000 = 1,106.1$ m³/day = 46.09 m³/h

#### Step 2: Area and number of units
- Filtration rate = 0.2 m³/m²/h (range for slow sand filters 0.1–0.4)
- Total area $A = Q/(\text{rate}) = 46.09/0.2 = 230.4$ m²
- Keep each unit below about 100 m² and use at least 2 working units: working units **n = 3**, plus **1 standby** unit for cleaning, so 4 units in all
- Area of one unit $= 230.4/3 = 76.8$ m²
- Take $L = 2B$: $B = \sqrt{76.8/2} = 6.20$ m. Adopt **B = 6.2 m, L = 12.4 m** (area 76.9 m² each)
- Check: rate with 3 working units = 0.200 m/h (OK)

#### Step 3: Depth of unit
| Component | Depth |
|---|---|
| Free board | 0.3 m |
| Supernatant water | 1.0 m |
| Filter sand (effective size 0.2–0.3 mm, UC 3–5) | 0.9 m |
| Gravel in 3 layers (3–6, 6–12, 12–40 mm) | 0.3 m |
| Under-drain space (central drain and laterals) | 0.2 m |
| **Total** | **2.7 m** |

Sand is scraped 15–25 mm every 1–2 months; when its depth falls to 0.5 m it is topped up to 0.9 m. Inlet and outlet chambers, a filtered-water weir, a drain valve and a filter-to-waste connection complete each unit.

#### Step 4: Section

```text
 inlet -> |  free board 0.3 m             |
          |~~~~ supernatant water 1.0 m ~~|
          |-------------------------------|
          |  filter sand 0.9 m            |
          |-------------------------------|
          |  gravel 0.3 m (3 layers)      |
          |==o==o== under-drain 0.2 m ==o=|
                       |
          outlet weir -> filtered water tank
```

**Answer: 3 working + 1 standby slow sand filters, each 6.2 m × 12.4 m (76.9 m²), total depth about 2.7 m.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which population is used for the filter?
   A. The forecast at the end of the 20-year design period, 24 579
   B. The present 15 000
   C. The population after 5 years
   D. The population after 40 years
   Answer: A. The design is for P0(1+r)^20. (Key point: Design population)

2. Slow sand filters work at what range of rate?
   A. 3 to 6 m^3/m^2/h
   B. 0.1 to 0.4 m^3/m^2/h
   C. 10 to 15 m^3/m^2/h
   D. 0.001 m^3/m^2/h
   Answer: B. They are slow filters, with 0.2 m/h adopted here. (Key point: Filtration rate)

3. Why is one standby unit provided?
   A. To increase rate
   B. To reduce sand depth
   C. So a unit can be out for cleaning while working units continue
   D. To serve as sedimentation
   Answer: C. Slow sand filters need scraping, so a spare unit keeps supply continuous. (Key point: Standby unit)

4. How is clogged slow sand cleaned?
   A. Backwash at 0.6 m/min
   B. Add alum
   C. Replace all sand weekly
   D. Scrape 15 to 25 mm of top sand and top up when depth falls to 0.5 m
   Answer: D. Slow sand filters are cleaned by scraping the surface layer, not backwashing. (Key point: Sand cleaning)

## Related in Water Supply Engineering

- [Slow sand filter, 10000 pop, 1.5% growth](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-a74) — Water Supply Engineering, chapter 6
- [Rapid sand filter, 45,000 population in 2021](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Arsf-a76) — Water Supply Engineering, chapter 6
- [Slow sand filter, 10000 population, base year 2068](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-bk68) — Water Supply Engineering, chapter 6
- [Slow sand filter for 3500 population](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-c70o) — Water Supply Engineering, chapter 6
- [Slow sand filter, 35,000 in 2019 for 2039](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-c75) — Water Supply Engineering, chapter 6
- [Slow sand filter, 15,000 population, 150 L/h/m2](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Assf-a75) — Water Supply Engineering, chapter 6

## Related in other subjects

- [5th year peak load with population growth](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Afifth-year-peak-load-population-growth) — Transmission and Distribution System Design, chapter 6, asked 7×
- [5th year peak load, incremental growth rate](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Afifth-year-peak-load-incremental-growth) — Transmission and Distribution System Design, chapter 6, asked 7×
- [Surge and water hammer: 45 m³/s, 20 m surge tank](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asurge-numerical-45cumec-3-penstocks) — Hydropower Engineering, chapter 6, asked 2×
- [Drainage rate: 300 mm in 3 days, growth factor 1.5](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Adrainage-rate-3-day-300mm-growth) — Irrigation and Drainage Engineering, chapter 9, asked 2×