# Best project for 4-year and 8-year service periods

Engineering Economics · Chapter 4: Comparative Analysis of Alternatives

- Asked in: 2069 Bhadra, 4+8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/engineering_economics/select-best-project-fw-4yr-irr
- Whole chapter: https://www.bctengineer.com/md/semester_6/engineering_economics/chapter-4

## Question

From the following information select the best project.
|  | Project A | Project B |
|---|---|---|
| Initial Investment | 35,000 | 50,000 |
| Annual Revenue | 16,450 | 25,000 |
| Annual costs | 3,000 | 13,830 |
| Useful life | 4 years | 8 years |
| Salvage value at the end of useful life | 0 | 0 |
MARR = 10%
When service period required is:
i) 4 years by FW method
ii) 8 years by IRR method with PW formulation

## Short answer

For 4-year service, FW method: Project A has FW Rs. 11,178 while B has FW Rs. -21,365, so choose A. For 8-year service, incremental IRR of B over A is 3.17% below 10% MARR, so A is best.

## Answer

Net annual revenue: A = 16,450 - 3,000 = Rs. 13,450; B = 25,000 - 13,830 = Rs. 11,170. MARR = 10%.

#### (i) Service period 4 years, FW method
Project A completes its 4-year life; B is used for only 4 of its 8 years.
Assumption: the only market value given for B is zero at the end of its life, so the market value of B at the end of year 4 is taken as zero (nothing recovered).

FW(A) = -35,000(F/P, 10%, 4) + 13,450(F/A, 10%, 4)
(F/P, 10%, 4) = 1.4641, (F/A, 10%, 4) = 4.6410
FW(A) = -51,244 + 62,421 = **Rs. 11,178**

FW(B) = -50,000(1.4641) + 11,170(4.6410) = -73,205 + 51,840 = **Rs. -21,365**

**Answer (i): Select A** (positive FW; B is negative if its assets have no resale value at year 4).

#### (ii) Service period 8 years, IRR with PW formulation
A is repeated once (second machine bought at year 4 for the same cost); B runs its full 8 years.

```text
Year   0        1-3     4        5-8
A     -35,000   13,450  -21,550  13,450      (-35,000 + 13,450 at yr 4)
B     -50,000   11,170   11,170  11,170
B - A -15,000   -2,280  +32,720  -2,280
```
IRR of each project on its own (8-year flows):
- A: PW(i) = -35,000 + 13,450(P/A,i,8) - 35,000(P/F,i,4) = 0 → IRR = 19.73%
- B: PW(i) = -50,000 + 11,170(P/A,i,8) = 0 → IRR = 15.08%
Both exceed 10%.

Incremental (B - A): PW(i) = -15,000 - 2,280(P/A,i,8) + 35,000(P/F,i,4) = 0
At i = 0%: +1,760; at 4%: -433; so IRR(B - A) ≈ **3.17%**, which is less than MARR = 10%.
(PW at 10% = -3,258, negative.)

**Answer (ii): Select A.** The extra Rs. 15,000 in B earns only 3.2% < 10%. (Also PW(A) = 12,849 > PW(B) = 9,591.)

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. For a 4-year service period, how is B treated?
   A. Repeated
   B. Used 4 of 8 years, market value taken as zero
   C. Full life
   D. Salvage 50,000
   Answer: B. With no market value given, nothing is recovered at year 4. (Key point: 4-year FW)

2. Which FWs?
   A. Both positive
   B. Both zero
   C. A +11,178; B -21,365
   D. A -21,365; B +11,178
   Answer: C. A is selected in part (i). (Key point: FW result)

3. For 8 years, how is A handled?
   A. Salvage added
   B. Repeated once, second machine at year 4
   C. Used 4 years only
   D. Ignored
   Answer: B. A is bought again at year 4. (Key point: 8-year repeat)

4. Why is A selected?
   A. A has negative PW
   B. B has higher IRR
   C. MARR is zero
   D. Incremental IRR of B-A is 3.17% < 10%
   Answer: D. The extra Rs 15,000 in B earns less than MARR. (Key point: Part ii decision)

## Related in Engineering Economics

- [IRR to select best of A, B, C (15 years)](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Airr-select-abc-15yr) — Engineering Economics, chapter 4
- [Sensitivity to investment, revenue and life](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Asensitivity-30-investment-revenue-life-500000) — Engineering Economics, chapter 6
- [Sensitivity on investment, revenue and life; interpret](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Asensitivity-30-initial-100000-useful-10) — Engineering Economics, chapter 6
- [Best of P and Q for 5-year study period](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Abest-project-pq-study-5yr) — Engineering Economics, chapter 4
- [Incremental IRR to select best of A to D](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Aincremental-irr-abcd-salvage-25) — Engineering Economics, chapter 4
- [AW sensitivity to investment and net annual cash flow](https://www.bctengineer.com/question.md?key=semester_6%2Fengineering_economics%3Asensitivity-aw-500000-75000) — Engineering Economics, chapter 6

## Related in other subjects

- [Gumbel flood at given risk, 50-year project life](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Agumbel-risk-63-58-4200) — Engineering Hydrology, chapter 6
- [Gumbel design flood, 21 years data, 40-year life](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Agumbel-21yr-life40-rel85-b) — Engineering Hydrology, chapter 6, asked 3×
- [RoR best installed capacity (NRs, 45 years)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-nrs-10-percent) — Hydropower Engineering, chapter 3
- [Best financing option; EBIT Rs 350,000](https://www.bctengineer.com/question.md?key=semester_7%2Fproject_engineering%3Abest-option-two-options-ebit-350000) — Project Engineering, chapter 6