# Best installed capacity at 12% interest

Hydro Power · Chapter 3: Planning of Hydropower Projects

- Asked in: 2082 Kartik, 10 marks
- Video: [Determine the best Installed capacity  for Nepalese river || Hydropower Engineering](https://www.youtube.com/watch?v=KZzhkqzBaHA) — OPengineer
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/hydro_power/best-installed-capacity-12pct
- Whole chapter: https://www.bctengineer.com/md/semester_6/hydro_power/chapter-3

## Question

Determine the best-installed capacity of a hydropower plant based on the given power duration data. Interest rate = 12%, Energy price = US$ 36/MWh, Variable cost = US$ 750/KW, Economic life of the project = 50 years.

| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Power (KW) | 700 | 590 | 535 | 300 | 255 | 180 | 150 | 105 | 80 | 70 | 60 | 50 |

## Short answer

Best installed capacity is 300 kW with net annual benefit of $29,408. Firm energy 438,000 kWh, total energy 1,569,500 kWh, secondary energy 1,131,500 kWh, plant factor 59.7%. Found by evaluating net benefit at each power duration level using capital recovery factor at 12% over 50 years.

## Answer

The **best installed capacity** is the one that gives the **largest net annual benefit** (revenue from energy minus annualised cost of capacity). It is found by trying each power level of the power duration data as the plant capacity.

#### Annual cost of capacity
No O&M cost is given, so only capital recovery is used.

$$
\begin{aligned}
CRF &= \frac{0.12(1.12)^{50}}{(1.12)^{50}-1} = 0.12042 \\
C_a &= 750 \times 0.12042 = 90.31\ \text{\$/kW/yr}
\end{aligned}
$$

Energy price = 36 \$/MWh = 0.036 \$/kWh. Each month = 730 h.

#### Power duration (descending order)
700, 590, 535, 300, 255, 180, 150, 105, 80, 70, 60, 50 kW.

For capacity $P_c$: $E = 730\sum \min(P_i,P_c)$, Benefit $= 0.036E$, Cost $= 90.31P_c$.

| Capacity (kW) | Energy (kWh/yr) | Benefit (\$) | Cost (\$) | Net (\$) |
|---|---|---|---|---|
| 50 | 438,000 | 15,768 | 4,516 | 11,252 |
| 105 | 803,000 | 28,908 | 9,483 | 19,425 |
| 150 | 1,032,950 | 37,186 | 13,547 | 23,639 |
| 180 | 1,164,350 | 41,917 | 16,256 | 25,660 |
| 255 | 1,438,100 | 51,772 | 23,030 | 28,742 |
| **300** | **1,569,500** | **56,502** | **27,094** | **29,408** |
| 535 | 2,084,150 | 75,029 | 48,317 | 26,712 |
| 590 | 2,164,450 | 77,920 | 53,284 | 24,636 |
| 700 | 2,244,750 | 80,811 | 63,219 | 17,592 |

#### Incremental check
- 255 → 300 kW: +45 kW costs \$4,064; extra energy 131,400 kWh (4 months) earns \$4,730. Worth adding.
- 300 → 535 kW: +235 kW costs \$21,223; extra energy 514,650 kWh (3 months) earns \$18,527. Not worth adding.

Break-even running time = $90.31/(8760\times0.036) = 28.6\%$ of the year (3.4 months). The band above 300 kW runs only 3 months, so it does not pay.

#### Results at 300 kW
- Firm energy $= 50 \times 8760 = 438{,}000$ kWh
- Total energy = 1,569,500 kWh; secondary energy = 1,131,500 kWh
- Plant factor $= 1{,}569{,}500/(300\times8760) = 59.7\%$

**Answer: Best installed capacity = 300 kW (net benefit ≈ \$29,408 per year).**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Since no O&M is given, what is the annual cost per kW?
   A. Variable cost x CRF = 750 x 0.12042 = 90.31 $/kW/yr
   B. Variable cost = 750 $/kW/yr
   C. Variable cost / 50
   D. Variable cost x 0.12
   Answer: A. Only capital recovery with CRF (12%, 50 yr) is used. (Key point: Annual cost without O&M)

2. For capacity Pc, how is annual energy found from the monthly powers?
   A. Pc x 8760
   B. Sum of all monthly powers x 730
   C. 730 x sum of min(Pi, Pc)
   D. Maximum power x 730
   Answer: C. Each month yields the smaller of the available power and the installed capacity, over 730 h. (Key point: Energy at a capacity)

3. Which capacity gives the maximum net benefit?
   A. 535 kW
   B. 300 kW
   C. 700 kW
   D. 180 kW
   Answer: B. 300 kW gives about $29,408/yr, higher than the other capacities tried. (Key point: Best capacity)

4. Why is capacity above 300 kW not worth adding?
   A. The interest rate is below 10%
   B. Firm energy would be lost
   C. Power in that band is available only about 3 months, below the 28.6% break-even
   D. Annual cost is zero
   Answer: C. Break-even is 90.31/(8760 x 0.036) = 28.6% of the year (3.4 months), but the band runs only 3 months. (Key point: Break-even running time)

## Related in Hydro Power

- [Best installed capacity at 10% interest](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Abest-installed-capacity-10pct) — Hydro Power, chapter 3
- [Power duration curve and primary/secondary energy](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apower-duration-curve-energy) — Hydro Power, chapter 3

## Related in other subjects

- [RoR best installed capacity (NRs, 45 years)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-nrs-10-percent) — Hydropower Engineering, chapter 3
- [RoR best installed capacity (USD 1200 million)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-usd-1200) — Hydropower Engineering, chapter 3
- [RoR best installed capacity (USD 2795 million)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-usd-2795) — Hydropower Engineering, chapter 3
- [Installed capacity, energy and daily peaking reservoir (2079)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-capacity-plant-factor-18cumec-peaking-79) — Hydropower Engineering, chapter 3, asked 2×