# Settling basin design principle and components

Hydro Power · Chapter 5: Components of Hydropower System

- Asked in: 2072 Asoj, 7 marks
- Video: [Design Of Settling Basin(Tank) Part I | Hydropower Engineering | IOE, Pu,  PoU](https://www.youtube.com/watch?v=NAE_aVTGJRw) — Parash Joshi - Civil Construction and Tutor
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/hydro_power/settling-basin-principle-components
- Whole chapter: https://www.bctengineer.com/md/semester_6/hydro_power/chapter-5

## Question

Explain the design principle and criteria of settling basin with neat sketches of basin and discuss the different component of the basin.

## Short answer

A settling basin reduces velocity to settle out sediment; length is L ≥ h v / w. Design criteria target particle size (0.2 mm), horizontal velocity (0.2–0.4 m/s), and at least two chambers. Components: inlet transition, settling and storage zones, flushing system, outlet weir, and spillway.

## Answer

A **settling basin (desander)** is an enlarged chamber in the water conductor system where the flow velocity is reduced so that suspended sediment particles larger than a chosen size settle out before the water reaches the turbines. In Nepalese Himalayan rivers the silt load is very high and quartz-rich, so desanders are essential to prevent turbine abrasion.

#### Design principle
The basin works on the **settling theory**: a particle entering at the water surface at depth $h$ moves forward with the flow velocity $v$ and falls with its fall (settling) velocity $w$. It is trapped if it reaches the bed before the end of the basin.

$$
\begin{aligned}
\text{Time to settle } t &= \frac{h}{w}, \quad \text{time to pass } = \frac{L}{v} \\
\text{Condition: } \frac{L}{v} &\ge \frac{h}{w} \;\Rightarrow\; L \ge \frac{h\,v}{w}
\end{aligned}
$$

Width $B = \dfrac{Q}{v\,h}$. In practice turbulence reduces the effective fall velocity, so the length is increased using Velikanov's or Sakhmin's methods, e.g. Velikanov:

$$
L = \frac{\lambda^2 v^2 (\sqrt{h} - 0.2)^2}{7.51\,w^2}
$$

where $\lambda$ depends on the required trap efficiency.

#### Design criteria
1. **Particle size to be removed:** usually 0.2–0.3 mm for medium heads; 0.1–0.15 mm for high-head Pelton plants (Nepal practice: 0.2 mm, or 0.15 mm for heads above about 250 m).
2. **Trap efficiency:** generally 90% or more for the design particle size.
3. **Horizontal velocity:** low enough to avoid resuspension; by Camp, $v = a\sqrt{d}$ cm/s ($a = 44$ for $0.1 < d < 1$ mm), usually 0.2–0.4 m/s.
4. **Uniform flow distribution:** gradual inlet transition (expansion about 1:5 to 1:8) and baffles/guide walls.
5. **Depth:** usually 3–6 m plus extra depth for sediment storage.
6. **Flushing:** sediment must be removed periodically or continuously (hydraulic flushing, Bieri system, Serpent system); flushing discharge must be available.
7. **Number of chambers:** at least two chambers so that one can be flushed while the other runs.
8. **L/B ratio:** generally 8–10 for good flow; a large width is split into several chambers.

#### Components of a settling basin
```text
 PLAN
        inlet        settling zone        outlet
 from  ________   ___________________   ________
 intake  \     | |                   | |     /  to
 ------>  > ---| |   (two chambers)  | |--- <   headrace
 ______  /_____| |___________________| |_____\
        transition                  weir/transition

 L-SECTION
  ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ WL
   \  inlet  |   settling zone        |outlet
    \________|________________________|
     sediment storage  ->  flushing canal/gate
```

1. **Inlet zone (transition):** gradually expanding section with guide walls or baffles that slows the water and spreads it uniformly over the basin width.
2. **Settling zone:** the main chamber of required length, width and depth where particles settle.
3. **Sediment storage zone:** extra depth below the settling zone, with sloping or hopper-shaped bed, where deposits collect.
4. **Flushing system:** flushing gates, conduits or channels with sufficient slope to return deposits to the river.
5. **Outlet zone:** converging transition and overflow weir that collect clear surface water into the headrace without disturbing the settled sediment.
6. **Spillway/escape:** a side spillway to release excess water and protect the basin.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. A particle is trapped if:
   A. L/v >= h/w, i.e. L >= h v / w
   B. L/v <= h/w
   C. w >= v
   D. h = 0
   Answer: A. Time to pass the basin must be at least the time to fall through depth h. (Key point: Settling condition)

2. The basin width follows from:
   A. B = w h
   B. B = L/10 only
   C. B = Q/(v h)
   D. B = hv/w
   Answer: C. Continuity: Q = B h v. (Key point: Width)

3. Why is length increased using Velikanov or Sakhmin methods?
   A. Turbulence reduces effective fall velocity
   B. Depth is zero
   C. Water is denser
   D. Particles float
   Answer: A. Eddies keep particles suspended, so a longer basin is needed. (Key point: Turbulence correction)

4. The outlet zone consists of:
   A. A sediment hopper
   B. A flushing gate
   C. A converging transition and overflow weir that collect clear surface water
   D. An inlet baffle
   Answer: C. Surface clear water passes without disturbing deposits. (Key point: Outlet zone)

5. The flushing system is to:
   A. Return deposited sediment to the river
   B. Store water
   C. Increase velocity
   D. Add sediment
   Answer: A. Gates and channels with enough slope remove deposits. (Key point: Flushing)

## Related in Hydro Power

- [Settling basin design for 0.2 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-2mm) — Hydro Power, chapter 5
- [Settling basin design for 0.15 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-15mm) — Hydro Power, chapter 5
- [Settling basin design for 0.25 mm sediment](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-25mm) — Hydro Power, chapter 5
- [Why settling basins are essential in Nepal](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-necessity-nepal) — Hydro Power, chapter 5, asked 4×
- [Desander and its design criteria](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Adesander-design-criteria) — Hydro Power, chapter 5, asked 4×
- [Surge tank functions and design criteria](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asurge-tank-functions-design) — Hydro Power, chapter 5, asked 2×

## Related in other subjects

- [Single chamber settling basin design (15 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-single-chamber-15cumec) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.15 mm, head 300 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-300m-015mm-turbulence) — Hydropower Engineering, chapter 5, asked 2×
- [Continuous settling basin (10 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-continuous-10cumec-015mm) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×