# Gauging site selection and current meter use

Hydro Power · Chapter 2: Introduction to Hydrology

- Asked in: 2071 Bhadra, 3+3 marks
- Video: [#stream gauge station#site selection#Engineering Hydrology#NEA#TU,PU,KU, Pou](https://www.youtube.com/watch?v=_IB7oPDK0AU) — Blissy Being
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/hydro_power/stream-gauging-site-current-meter
- Whole chapter: https://www.bctengineer.com/md/semester_6/hydro_power/chapter-2

## Question

What factors should be considered in selecting a site for a stream gauging station? Describe briefly the procedure of using a current meter for measuring velocity of stream.

## Short answer

Select a straight, stable channel with a well-defined control and no backwater effects. Current meter procedure: divide cross-section, measure depth, lower meter to 0.6d (or 0.2d and 0.8d), count revolutions per second, convert to velocity using V=aN+b, then compute discharge by mid-section method.

## Answer

#### Factors for selecting a stream gauging site
- **Straight reach**: about 5–10 times the river width upstream and downstream, with parallel flow lines.
- **Stable channel**: bed and banks free from scour, deposition and shifting, so the stage–discharge relation stays constant.
- **Well-defined control** (rock bar, rapids or a weir) downstream, giving a unique stage–discharge relation.
- **No backwater** effect from confluences, dams or tides; no eddies or dead water.
- **Flow contained in one channel** at all stages, without overflow at floods.
- Adequate depth and velocity for the current meter in the dry season.
- Easy **access** in all seasons and safe working (bridge, cableway).
- Away from tributaries, so the measured flow represents the site of interest (e.g. near the intake for a hydropower project).

#### Measuring velocity with a current meter
A **current meter** (cup type or propeller type) has a rotor whose speed of rotation $N$ is proportional to water velocity. Its calibration equation is $V = aN + b$.

Procedure:
1. Stretch a tag line across the river and divide the width into 15–25 segments (each carrying ≤ 10% of flow).
2. At each vertical, measure the depth $y$ with a sounding rod or weight.
3. Lower the meter (wading rod for shallow water; cable, weight and cableway or bridge for deep water) to the required depth:
   - Shallow (< 0.6–1 m): one reading at **0.6y** from the surface.
   - Deeper: two readings at **0.2y and 0.8y**; mean $V = (V_{0.2} + V_{0.8})/2$.
4. Allow the meter to settle, then count the revolutions over a fixed time (40–100 s). $N$ = revolutions/time.
5. Convert to velocity with the rating equation, e.g. $V = 0.51N + 0.03$.
6. Compute discharge by the mid-section or mean-section method: $Q = \sum b_i y_i V_i$.

```text
  tag line  0   1   2   3   4   5
  ~~~~~~~~~~|~~~|~~~|~~~|~~~|~~~|~~~~
   \        o   o   o   o   o      /  o = meter at 0.6y
    \_______o___o___o___o_________/      or 0.2y & 0.8y
```

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which is a desirable feature of a stream gauging site?
   A. A bend with eddies for slow flow
   B. A reach just below a confluence
   C. A shifting sandy bed
   D. A straight reach with a stable bed and banks
   Answer: D. A straight, stable reach keeps flow lines parallel and the stage-discharge relation constant. (Key point: Reach and channel stability)

2. Why should the site be free from backwater and have a well-defined control downstream?
   A. To give a unique stage-discharge relation
   B. To make the river deeper
   C. To increase the velocity
   D. To avoid the need for a current meter
   Answer: A. Backwater and poor control make one stage correspond to several discharges. (Key point: Control and backwater)

3. A current meter's rotor speed N is related to velocity by what?
   A. V = N^2
   B. V = aN + b from calibration
   C. V = N/depth
   D. V = depth x N
   Answer: B. Rotor speed is proportional to water velocity, expressed by the calibration equation V = aN + b. (Key point: Current meter calibration)

4. Where is the meter placed in a deep vertical, and how is the mean velocity found?
   A. At 0.6y only; mean velocity is that reading
   B. At the bed; mean is half the reading
   C. At 0.2y and 0.8y; mean is the average of the two
   D. At the surface; mean is twice the reading
   Answer: C. In deeper water, readings at 0.2y and 0.8y are averaged; in shallow water one reading at 0.6y is used. (Key point: Observation depths)

## Related in Hydro Power

- [Stream discharge from current meter revolutions (V = 0.51N + 0.03)](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Astream-gauging-revolutions-0-51) — Hydro Power, chapter 2, asked 2×
- [Stream discharge from current meter revolutions (v = 0.55N + 0.04)](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Astream-gauging-revolutions-0-55) — Hydro Power, chapter 2, asked 2×
- [Stream gauging with calibration equation](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Astream-gauging-calibration-no-data) — Hydro Power, chapter 2
- [Intake site selection for RoR plant](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Aintake-site-selection-ror) — Hydro Power, chapter 5

## Related in other subjects

- [Factors in selecting a gauging station site](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Agauging-site-factors) — Engineering Hydrology, chapter 4, asked 4×
- [Discharge from current meter at 0.6d, stream gauging data](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Acurrent-meter-0-32n-0-032-2) — Engineering Hydrology, chapter 4
- [Reservoir intake and site selection factors](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Areservoir-intake-site-factors) — Water Supply Engineering, chapter 5, asked 2×
- [Distribution substation site selection factors](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Asubstation-site-location-factors) — Industrial Power Distribution and Illumination, chapter 4