title: "Electronic ballast replacement savings with ToD tariff"
subject: "Industrial Power Distribution and Illumination"
chapter: 10
key: "semester_6/industrial_power_distribution_and_illumination:ballast-replacement-tariff"
source: https://www.bctengineer.com/q/semester_6/industrial_power_distribution_and_illumination/ballast-replacement-tariff
site: BCT Engineering
---

# Electronic ballast replacement savings with ToD tariff

Industrial Power Distribution and Illumination · Chapter 10: Electrical Energy Audit in Industry

- Asked in: 2070 Magh, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/industrial_power_distribution_and_illumination/ballast-replacement-tariff
- Whole chapter: https://www.bctengineer.com/md/semester_6/industrial_power_distribution_and_illumination/chapter-10

## Question

In an industry, there are 100 numbers of 1×36 watt fluorescent tubes and 200 numbers of 2x 36 watt fluorescent tubes with copper ballast. The p.f. with copper ballast is very poor and is below 0.5. Also, losses in that ballast are very high. Replacing the electronic ballast can avoid these two problems. By laboratory test conducted on 36W fluorescent tube followings are finding: (a) with cu. Ballast power consumed 44W and p.f. is 0.5 b) with electronic ballast power consumed 37 watt and p.f 0.9. Calculate the energy cost saving and payback period with electronic ballast; if operating hours are 8 hours/day and electronic ballast cost is NRs 300 per piece, energy tariff is:
6 AM - 6 PM, Rs.5.75 paisa
6 PM - 11 PM, Rs.6.55 paisa
11 PM - 6 AM, Rs.4.00 paisa
And kVA charge per month Rs. 210.00 paisa

## Short answer

Replacing 500 tubes with electronic ballasts saves 3.5 kW and 23.44 kVA. Annual energy saving Rs 58,765 (day tariff), demand saving Rs 59,080; total Rs 1.18 lakh. Payback ≈ 1.27 years.

## Answer

**Assumptions:** one ballast per tube (electronic ballast cost Rs 300 per tube), lights run 8 h/day for 365 days, and all 8 h fall in the 6 AM – 6 PM band (day shift, Rs 5.75/kWh). The lights are on during the monthly peak, so the kVA saving reduces the demand charge.

**Number of tubes:**
```text
100 × (1×36 W) = 100 tubes
200 × (2×36 W) = 400 tubes
Total N        = 500 tubes
```

**Power and kVA per tube:**
| Ballast | kW per tube | pf | kVA per tube |
|---|---|---|---|
| Copper | 0.044 | 0.5 | 0.044/0.5 = 0.0880 |
| Electronic | 0.037 | 0.9 | 0.037/0.9 = 0.0411 |

**Total load:**
```text
Copper:     P = 500 × 44 = 22.0 kW,  S = 44.00 kVA
Electronic: P = 500 × 37 = 18.5 kW,  S = 20.56 kVA
Saving:    ΔP = 3.5 kW,             ΔS = 23.44 kVA
```

**Annual energy cost saving:**
```text
ΔE = 3.5 kW × 8 h × 365 = 10 220 kWh/year
Cost saving = 10 220 × 5.75 = Rs 58 765 /year
```

**Annual demand charge saving:**
```text
= 23.44 kVA × 210 × 12 = Rs 59 080 /year
```

**Total saving and payback:**
```text
Total saving = 58 765 + 59 080 = Rs 117 845 /year
Investment   = 500 × 300       = Rs 150 000
Payback      = 150 000 / 117 845 = 1.27 years ≈ 15.3 months
```

If the 8 h were instead in the evening peak (Rs 6.55/kWh), the energy saving would be 10 220 × 6.55 = Rs 66 941 and payback ≈ 1.19 year; the conclusion is the same.

Other benefits: lower line current (less cable and transformer loss), no flicker or hum, and longer tube life with electronic ballasts.

**Answer: Saving ≈ Rs 1.18 lakh per year (Rs 58 765 energy + Rs 59 080 demand); payback ≈ 1.27 years.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. How many tubes (and so ballasts) are counted for 100 x (1x36 W) and 200 x (2x36 W) fittings?
   A. 300
   B. 700
   C. 400
   D. 500
   Answer: D. The 100 single-tube fittings give 100 tubes and the 200 twin-tube fittings give 400, total 500 tubes with one ballast each. (Key point: Number of tubes)

2. How is the kVA saving per tube obtained?
   A. kVA = kW / pf for each ballast type, then difference
   B. kVA = kW x pf
   C. Difference of kW only
   D. kVA = kW / (1 - pf)
   Answer: A. Copper: 0.044/0.5 = 0.088 kVA; electronic: 0.037/0.9 = 0.0411 kVA. For 500 tubes the saving is 23.44 kVA. (Key point: kVA from pf)

3. Which two savings make up the total annual saving?
   A. Energy (kWh) saving only
   B. Energy cost saving from 3.5 kW less power and kVA demand charge saving
   C. Ballast resale and lamp cost
   D. Reduced operating hours and tariff change
   Answer: B. Energy saving: 3.5 kW x 8 x 365 x 5.75 = Rs 58 765; demand saving: 23.44 x 210 x 12 = Rs 59 080. (Key point: Two savings)

4. With investment 500 x Rs 300 = Rs 150 000 and total saving Rs 117 845/year, what is the payback?
   A. About 0.5 year
   B. About 1.27 years
   C. About 2.5 years
   D. About 12 years
   Answer: B. Payback = 150 000 / 117 845 = 1.27 years. (Key point: Payback)

## Related in Industrial Power Distribution and Illumination

- [Drawing hall 40 × 25 × 6 m, 2×36 W fluorescent](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Adrawing-hall-2x36w-fluorescent) — Industrial Power Distribution and Illumination, chapter 7
- [Production room 27 × 45 m twin 36 W tubes](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Aproduction-room-27x45) — Industrial Power Distribution and Illumination, chapter 7, asked 4×
- [Process room 30 × 15 × 5 m fluorescent lighting](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Aprocess-room-30x15-fluorescent) — Industrial Power Distribution and Illumination, chapter 7
- [Optimum pf under two-part tariff (200 kW)](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Atwo-part-tariff-optimum-pf) — Industrial Power Distribution and Illumination, chapter 10
- [Process room 40 × 20 m twin 40 W fluorescent](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Aprocess-room-40x20-fluorescent) — Industrial Power Distribution and Illumination, chapter 7, asked 2×
- [Industry room 30 × 20 m LED lighting and DB](https://www.bctengineer.com/question.md?key=semester_6%2Findustrial_power_distribution_and_illumination%3Aindustry-room-30x20-led) — Industrial Power Distribution and Illumination, chapter 7, asked 2×

## Related in other subjects

- [Tariff types used in industry billing by NEA](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Atariff-types-nea-industry) — Utilization of Electrical Energy, chapter 6
- [Interpret: publishing industry and electronic media](https://www.bctengineer.com/question.md?key=semester_5%2Fcommunication_english%3Ainterpret-publishing-industry-electronic-media) — Communication English, chapter 1
- [Energy saving calculation: lighting and motor](https://www.bctengineer.com/question.md?key=semester_6%2Fenergy_resources%3Alighting-motor-energy-saving-case) — Energy Resources, chapter 9
- [30 kW shunt generator: emf, copper loss, efficiency (100 W)](https://www.bctengineer.com/question.md?key=semester_4%2Felectrical_machines%3Agen-shunt-30kw-loss-100w) — Electrical Machines, chapter 3, asked 2×