# Bell's guide bund plan, sections, design steps

Irrigation and Drainage Engineering · Chapter 6: River Training Works

- Asked in: 2079 Asoj, 3+5 marks
- Video: [Design  Steps Of Guide Bank|Bell Bund|Design Criteria|Vertical Type Fall|Drop Fall |Design Canal](https://www.youtube.com/watch?v=SYP5-ccYG6E) — DIPAK  MANDAL
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/irrigation_and_drainage_engineering/bells-bund-plan-design-steps
- Whole chapter: https://www.bctengineer.com/md/semester_6/irrigation_and_drainage_engineering/chapter-6

## Question

Draw a neat plan and sections of a Bell's Bund and give salient steps of its design procedure.

## Short answer

Bell’s bund is a guide embankment with curved heads to give axial flow. Design steps: compute waterway W=4.75 sqrt(Q), silt factor f=1.76 sqrt(d); upstream shank 1–1.5W, tail 0.2–0.5W; curved head radius 0.5W, sweep 120–145°; top level HFL+1.5 m, width 6 m; pitching t=0.06 Q^(1/3); scour R=0.47(Q/f)^(1/3); apron width 1.5D', launched thickness 1.5t.

## Answer

A **Bell's bund** is a guide bund (guide bank) on the pattern recommended by Bell, in which a pair of embankments, with curved heads upstream and short tails downstream, is laid symmetrically about the axis of a bridge or barrage so that the river approaches the waterway axially. The waterway is based on Lacey's regime width.

#### Plan and sections (3 marks)
```text
 U/S                                       D/S
   ______________________________   |   ____
  /   upstream shank 1.0-1.5 W   \  |  /    \ tail
 (  curved head, R = 0.5W,        )=|=(      ) 0.25 W
  \ sweep 120 deg                 /  |  \____/
   \_____________________________/   |
         waterway W (Lacey)        axis of bridge
```
```text
 Section at shank              Section at nose
     __6 m__                      __6 m__
    /       \  HFL+1.5           /        \
 HFL/_________\ 2:1          HFL/__________\ 3:1
  / pitching t \                / pitching t \
 /___ apron ____\ (1.5R)    /____ apron (2R) ___\
```

#### Design steps (5 marks)
1. Design discharge $Q$, HFL, bed level and median grain size $d$.
2. Silt factor $f = 1.76\sqrt{d_{mm}}$, and waterway $W = 4.75\sqrt{Q}$.
3. Length of upstream shank $1.0$ to $1.5W$, downstream tail $0.2$ to $0.5W$.
4. Radius of upstream curved head about $0.5W$ with sweep $120$ to $145^\circ$; tail with a smaller radius, sweep about $45^\circ$.
5. Top level $=$ HFL $+ 1.5$ m, top width 6 m, side slopes 2:1.
6. Pitching thickness $t = 0.06Q^{1/3}$.
7. Scour depth $R = 0.47(Q/f)^{1/3}$; max scour below HFL: $2R$ at nose, $1.5R$ at shank.
8. Launching apron: depth below bed $D' = $ scour depth $-$ flood depth, width $1.5D'$, launched thickness $1.5t$.
9. Draw plan and sections.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. A Bell's bund is:
   A. A spur
   B. A guide bund with curved upstream heads and short downstream tail laid symmetrically about the bridge axis
   C. A levee far from the river
   D. A type of weir
   Answer: B. It makes the river approach the waterway axially; the waterway is based on Lacey's regime width. (Key point: What is Bell's bund)

2. Which proportions suit the Bell's bund plan?
   A. Tail longer than shank
   B. Sweep 10 degrees both ends
   C. Upstream shank 1-1.5W, head radius about 0.5W with sweep 120-145 degrees, tail 0.2-0.5W with about 45 degrees sweep
   D. Shank 0.1W
   Answer: C. The upstream curved head is large, the downstream tail short with smaller radius. (Key point: Head and tail)

3. Top level, width and slopes?
   A. HFL + 10 m, 30 m
   B. Bed level
   C. HFL + 1.5 m, 6 m, 2:1
   D. HFL, 1 m, 1:1
   Answer: C. Free-board of 1.5 m protects against overtopping. (Key point: Top level)

4. Maximum scour below HFL and apron design?
   A. R everywhere
   B. 2R at nose, 1.5R at shank; D' = scour - flood depth, width 1.5D', launched thickness 1.5t
   C. Apron width D'/2
   D. 3R at shank
   Answer: B. R = 0.47 (Q/f)^(1/3), and the apron is designed to launch on a 2:1 slope. (Key point: Scour and apron)

## Related in Irrigation and Drainage Engineering

- [Design steps of a guide bund](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aguide-bund-design-steps) — Irrigation and Drainage Engineering, chapter 6, asked 2×
- [Bell's waterway and guide bund, 7500 m3/s](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Abarrage-waterway-bells-guide-bund) — Irrigation and Drainage Engineering, chapter 6
- [Guide bund with plan, section, nose; 2500 m3/s](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aguide-bund-q2500-bed755) — Irrigation and Drainage Engineering, chapter 6
- [Guide bund design, 4000 m3/s, f 1.1](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aguide-bund-q4000-f11-depth5) — Irrigation and Drainage Engineering, chapter 6, asked 3×
- [Guide bund design, 4000 m3/s, d 0.1 mm](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aguide-bund-q4000-hfl205-bed200) — Irrigation and Drainage Engineering, chapter 6
- [Guide bund design, 7000 m3/s](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aguide-bund-q7000-depth5-f11) — Irrigation and Drainage Engineering, chapter 6

## Related in other subjects

- [Design steps of flanged beam sections](https://www.bctengineer.com/question.md?key=semester_7%2Fdesign_of_rcc_structure%3Adesign-steps-of-flanged-beam-sections) — Design of RCC Structure, chapter 4, asked 2×
- [Powerhouse plan and sections (Francis, 10 MW)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Apowerhouse-plan-section-francis-10mw) — Hydropower Engineering, chapter 8
- [Design steps and criteria of distribution system](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Adistribution-design-steps) — Water Supply Engineering, chapter 7, asked 3×
- [Column slab base: sketch and design steps](https://www.bctengineer.com/question.md?key=semester_6%2Fdesign_of_steel_and_timber_structure%3Aslab-base-procedure-sketch) — Design of Steel and Timber Structure, chapter 6, asked 3×