# Cross drainage: canal 300, drainage 500

Irrigation and Drainage Engineering · Chapter 8: Cross-Drainage structures

- Asked in: 2076 Baisakh, 12 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/irrigation_and_drainage_engineering/cd-q300-canal-n0016-drain500
- Whole chapter: https://www.bctengineer.com/md/semester_6/irrigation_and_drainage_engineering/chapter-8

## Question

Design a suitable cross drainage structure for the following data. Canal Data: Discharge = 300 m³/s; Bed width = 30 m; FSL = 209 m; Bed level = 202.50 m; Side slope = ½:1 (H:V); Rugosity Coefficient (N) = 0.016. Drainage data: Discharge = 500 m³/s; Bed level = 198 m; HFL = 207.70 m; Silt factor (f) = 1.0.

## Short answer

Siphon aqueduct chosen since drainage HFL (207.7 m) is 5.2 m above canal bed (202.5 m). Drainage waterway: 11 spans of 10 m (clear 110 m). Canal flumed to 26 m wide trough, depth 6.5 m. Inlet transition 10.5 m (2:1), outlet 15.8 m (3:1). Trough bed levels: start 202.419 m, end 202.391 m. Total head loss 0.064 m.

## Answer

The canal ($Q$ = 300 m³/s) crosses a drainage of $Q$ = 500 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.

**Assumptions:** Canal depth = FSL − bed = 209 − 202.5 = 6.5 m; side slope ½H:1V; ground level taken equal to canal bed; Lacey's $f$ = 1 and $n$ = 0.016 (as given) used for the trough; slab 0.6 m.

#### 1. Type of structure
HFL of the drainage (207.70 m) is above the canal bed (202.50 m) by 5.20 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A **siphon aqueduct** is suitable. Drainage depth at HFL = 207.70 − 198.00 = 9.70 m.

#### 2. Drainage waterway
Lacey's regime perimeter (for a natural stream):

$$
P = 4.75\sqrt{Q} = 4.75\sqrt{500} = 106.2\ \text{m}
$$

Provide **11 spans of 10 m** with piers 1.5 m thick: clear waterway = 11 × 10 = **110 m** (> 106.2 m). Overall length = 110 + 10 × 1.5 = **125.0 m**.

Check: velocity through the barrels (clear height 3.80 m, see section 4) = 500/(110 × 3.80) = 1.20 m/s, which is acceptable. Lacey's regime depth $R = 0.47(Q/f)^{1/3}$ = 3.73 m (with $f$ = 1), so the scour level 1.5R = 5.6 m below HFL is at RL 202.1 m, which is above the drainage bed (198.00 m). Scour does not govern, so the foundations of piers and abutments are taken to a nominal depth of about 2 m below the drainage bed (about RL 196.0 m), with cut-offs and aprons.

#### 3. Canal waterway (flumed rectangular trough)
Normal canal: area $A_1=(B+zD)D$ = (30 + 0.5 × 6.5) × 6.5 = 216.12 m², $V_1$ = 300/216.12 = 1.388 m/s, $h_{v1}=V_1^2/2g$ = 0.0982 m. Top width $T=B+2zD$ = 36.50 m.

To save cost, the canal is flumed to a rectangular trough of width $B_t$ = **26 m**, with the same full supply depth 6.5 m (the trough is as long as the drainage waterway, 125.0 m).
- Trough area = 26 × 6.5 = 169.00 m²; $V_t$ = 300/169.00 = 1.775 m/s (acceptable, < 2.5 m/s); $h_{vt}$ = 0.1606 m
- Froude number = 0.22 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius $R=A/P$ = 169.00/39.00 = 4.333 m; friction slope $S=(nV/R^{2/3})^2$ = 0.000114 (Manning's n = 0.016); friction loss in trough $h_f=S\,L$ = 0.000114 × 125.0 = 0.014 m

#### 4. Transitions and levels

```text
  FSL ---.                            .--- FSL
         '--.______________________.--'
  bed ---.                            .--- bed
         '--.______________________.--'
  normal  inlet     flumed trough     outlet  normal
  canal   (2:1)                      (3:1)   canal
```
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 36.50 − 26 = **10.5 m**
- Outlet length = 3 × (T − B_t)/2 = **15.8 m**

Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):

$$
\begin{aligned} W_2 &= W_1 + h_{v1} - h_{vt} - 0.3(h_{vt}-h_{v1}) \\ W_3 &= W_2 - h_f \\ W_4 &= W_3 + h_{vt} - h_{v1} - 0.5(h_{vt}-h_{v1}) \end{aligned}
$$

$W_1$ = 209.000 m, so $W_2$ = 208.919 m, $W_3$ = 208.905 m, $W_4$ = 208.936 m. Trough bed = water level − 6.5 m.

| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 202.500 | 209.000 |
| 2 | End of inlet transition = start of trough | 202.419 | 208.919 |
| 3 | End of trough = start of outlet transition | 202.405 | 208.905 |
| 4 | End of outlet transition = normal canal | 202.436 | 208.936 |

Total loss of head = 209.000 − 208.936 = 0.064 m, so the canal bed downstream of the work is 0.064 m lower than upstream.

Check: with trough slab 0.6 m thick, soffit of the barrels = 201.80 m, i.e. 3.80 m above the drainage bed; HFL stands 5.90 m above the soffit, which gives the siphonic head.

**Answer:** drainage waterway 110 m clear (11 × 10 m, overall 125.0 m); canal flumed to 26 m wide trough; bed/FSL at the four sections = 202.50/209.00, 202.42/208.92, 202.40/208.90, 202.44/208.94 m.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. How is the canal depth obtained from the data given?
   A. Depth = FSL - bed = 209 - 202.5 = 6.5 m
   B. Depth = HFL - drain bed
   C. Depth = bed width / 5
   D. Depth = 1.5 m assumed
   Answer: A. The full supply depth is the difference between FSL and canal bed level. (Key point: Canal depth assumption)

2. HFL (207.70 m) is 5.20 m above the canal bed (202.50 m). Which work is chosen?
   A. Aqueduct
   B. Siphon aqueduct, with the drainage flowing under pressure through barrels
   C. Super passage
   D. Level crossing
   Answer: B. The trough cannot be above HFL economically so barrels under pressure are used. (Key point: Structure type)

3. Which is the correct drainage waterway?
   A. P = 106.2 m; 11 spans of 10 m, 110 m clear, overall 125.0 m
   B. P = 4.75 sqrt(500)=53 m
   C. 10 spans of 10 m with no piers
   D. P = 106.2 m; 106.2 m clear exactly
   Answer: A. Clear waterway of 110 m > 106.2 m with 10 piers of 1.5 m gives 125.0 m. (Key point: Drainage waterway)

4. Trough 26 m wide, depth 6.5 m, Q = 300 m3/s. What is true?
   A. V = 1.78 m/s and Froude number 0.22, so flow is subcritical and no jump forms
   B. V = 1.39 m/s, supercritical
   C. V = 5 m/s, jump forms
   D. Velocity cannot be found without HFL
   Answer: A. V = 300/169 = 1.775 m/s; Fr = 0.22 < 1. (Key point: Flume trough hydraulics)

## Related in Irrigation and Drainage Engineering

- [Cross drainage (flumed): canal 30, drainage 200](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-flumed-q30-drain200) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage: Q 30, HFL 311 m](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q30-canal-bed310-hfl311) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage: Q 50, bed 35 m, FSD 1.6](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q50-bed35-fsd16-hfd400) — Irrigation and Drainage Engineering, chapter 8, asked 2×
- [Cross drainage: canal 125, drainage 64](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-table-q125-drain64) — Irrigation and Drainage Engineering, chapter 8
- [Siphon design: canal 18, drainage 60](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Asiphon-q18-drain60-lacey) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage: Q 50, HFD 550](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q50-bed30-fsd21-hfd550) — Irrigation and Drainage Engineering, chapter 8, asked 2×

## Related in other subjects

- [Phreatic line and discharge (crest 300 masl)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-phreatic-line-2079-baishakh) — Hydropower Engineering, chapter 4, asked 2×