title: "Cross drainage: Q 40, 45 cumec drainage"
subject: "Irrigation and Drainage Engineering"
chapter: 8
key: "semester_6/irrigation_and_drainage_engineering:cd-q40-bed30-fsd16-syphonic"
source: https://www.bctengineer.com/q/semester_6/irrigation_and_drainage_engineering/cd-q40-bed30-fsd16-syphonic
site: BCT Engineering
---

# Cross drainage: Q 40, 45 cumec drainage

Irrigation and Drainage Engineering · Chapter 8: Cross-Drainage structures

- Asked in: 2072 Magh, 6 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/irrigation_and_drainage_engineering/cd-q40-bed30-fsd16-syphonic
- Whole chapter: https://www.bctengineer.com/md/semester_6/irrigation_and_drainage_engineering/chapter-8

## Question

Design a suitable cross drainage (water way, bed levels of different section and design of transitions) works if the following data at the crossing of a canal and drainage are given. Canal: Q = 40 m³/s, Bed width = 30 m, FSD of canal = 1.6 m, Bed level = 206.4 m, Side slope = 1½ H:1V. Drainage: Q = 45 m³/s, HFL = 207 m, Bed level = 204.5 m, General ground level = 206.50 m.

## Short answer

Siphon aqueduct with drainage waterway 36 m clear (6@6 m spans). Canal flumed to 14 m wide trough, depth 1.6 m; inlet 20.8 m (2:1), outlet 31.2 m (3:1). Critical levels: bed/FSL: 206.40/208.00, 206.23/207.83, 206.21/207.81, 206.27/207.87 m.

## Answer

The canal ($Q$ = 40 m³/s) crosses a drainage of $Q$ = 45 m³/s. Design is done in four steps: type of work, drainage waterway, canal waterway (flumed trough) and bed/water levels of the trough.

**Assumptions:** Lacey's $f$ = 1; trough $n$ = 0.015; slab 0.6 m.

#### 1. Type of structure
HFL of the drainage (207.00 m) is above the canal bed (206.40 m) by 0.60 m, so the trough cannot be kept above HFL without a very high, costly structure. The drainage is passed under the trough through barrels flowing under pressure (siphonic action). A **siphon aqueduct** is suitable. Drainage depth at HFL = 207.00 − 204.50 = 2.50 m.

#### 2. Drainage waterway
Lacey's regime perimeter (for a natural stream):

$$
P = 4.75\sqrt{Q} = 4.75\sqrt{45} = 31.9\ \text{m}
$$

Provide **6 spans of 6 m** with piers 1.0 m thick: clear waterway = 6 × 6 = **36 m** (> 31.9 m). Overall length = 36 + 5 × 1.0 = **41.0 m**.

Check: mean velocity = Q/(L·d) = 45/(36 × 2.50) = 0.50 m/s. Lacey's regime depth $R = 0.47(Q/f)^{1/3}$ = 1.67 m (with $f$ = 1); 1.5R = 2.5 m below HFL gives RL 204.5 m, which is only at the natural bed and above the depressed floor under the barrels (204.11 m, see below), so scour does not govern; the foundations of piers and abutments are taken at least 1.5 m below the depressed floor (about RL 202.6 m), with cut-offs and aprons.

#### 3. Canal waterway (flumed rectangular trough)
Normal canal: area $A_1=(B+zD)D$ = (30 + 1.5 × 1.6) × 1.6 = 51.84 m², $V_1$ = 40/51.84 = 0.772 m/s, $h_{v1}=V_1^2/2g$ = 0.0303 m. Top width $T=B+2zD$ = 34.80 m.

To save cost, the canal is flumed to a rectangular trough of width $B_t$ = **14 m**, with the same full supply depth 1.6 m (the trough is as long as the drainage waterway, 41.0 m).
- Trough area = 14 × 1.6 = 22.40 m²; $V_t$ = 40/22.40 = 1.786 m/s (acceptable, < 2.5 m/s); $h_{vt}$ = 0.1625 m
- Froude number = 0.45 < 1, flow is subcritical, so there is no hydraulic jump.
- Hydraulic radius $R=A/P$ = 22.40/17.20 = 1.302 m; friction slope $S=(nV/R^{2/3})^2$ = 0.000504 (Manning's n = 0.015); friction loss in trough $h_f=S\,L$ = 0.000504 × 41.0 = 0.021 m

#### 4. Transitions and levels

```text
  FSL ---.                            .--- FSL
         '--.______________________.--'
  bed ---.                            .--- bed
         '--.______________________.--'
  normal  inlet     flumed trough     outlet  normal
  canal   (2:1)                      (3:1)   canal
```
Wing-wall (straight) transitions: inlet splay 2:1 (contraction) and outlet splay 3:1 (expansion), measured on each side:
- Inlet length = 2 × (T − B_t)/2 = 34.80 − 14 = **20.8 m**
- Outlet length = 3 × (T − B_t)/2 = **31.2 m**

Bernoulli's equation between sections (loss in contraction = 0.3 Δh_v, in expansion = 0.5 Δh_v; Δh_v = difference of velocity heads):

$$
\begin{aligned} W_2 &= W_1 + h_{v1} - h_{vt} - 0.3(h_{vt}-h_{v1}) \\ W_3 &= W_2 - h_f \\ W_4 &= W_3 + h_{vt} - h_{v1} - 0.5(h_{vt}-h_{v1}) \end{aligned}
$$

$W_1$ = 208.000 m, so $W_2$ = 207.828 m, $W_3$ = 207.807 m, $W_4$ = 207.874 m. Trough bed = water level − 1.6 m.

| Section | Location | Bed level (m) | FSL (m) |
|---|---|---|---|
| 1 | Normal canal, start of inlet transition | 206.400 | 208.000 |
| 2 | End of inlet transition = start of trough | 206.228 | 207.828 |
| 3 | End of trough = start of outlet transition | 206.207 | 207.807 |
| 4 | End of outlet transition = normal canal | 206.274 | 207.874 |

Total loss of head = 208.000 − 207.874 = 0.126 m, so the canal bed downstream of the work is 0.126 m lower than upstream.

Check: with trough slab 0.6 m thick, soffit of the barrels = 205.61 m, i.e. 1.11 m above the drainage bed; HFL stands 1.39 m above the soffit, which gives the siphonic head. Since the clear height is less than 1.5 m, the drainage bed is depressed under the barrels to RL 204.11 m (1.5 m clear height) with a 1 in 4 slope at both ends.

**Answer:** drainage waterway 36 m clear (6 × 6 m, overall 41.0 m); canal flumed to 14 m wide trough; bed/FSL at the four sections = 206.40/208.00, 206.23/207.83, 206.21/207.81, 206.27/207.87 m.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Top width T = 34.80 m and trough width 14 m. With a 2:1 inlet splay measured on each side, what is the inlet length?
   A. 20.8 m, since 2 x (34.80 - 14)/2 = 20.8 m
   B. 10.4 m, since it is half of (T - Bt)
   C. 41.6 m, since it is 2 x (T - Bt)
   D. 31.2 m, since this uses the 3:1 splay
   Answer: A. Each side contracts (34.8 - 14)/2 = 10.4 m, and at 2:1 the length is 2 x 10.4 = 20.8 m; the 3:1 outlet gives 31.2 m. (Key point: Transition length)

2. For Q = 45 m3/s, P = 4.75 sqrt(45) = 31.9 m. Which provision satisfies the design?
   A. 5 spans of 6 m = 30 m clear
   B. 6 spans of 6 m = 36 m clear, which is more than 31.9 m
   C. A 14 m wide waterway equal to the trough
   D. 31.9 m as one span with no piers
   Answer: B. Clear waterway must not be less than the Lacey perimeter; 36 m exceeds 31.9 m. (Key point: Drainage waterway size)

3. Flumed to 14 m, the trough has V = 1.786 m/s and Froude number 0.45. Why is this acceptable?
   A. Fr is above 1, so supercritical flow keeps the trough self-cleaning
   B. V is above 2.5 m/s, which prevents silting
   C. V is below 2.5 m/s and Fr is below 1, so flow is subcritical with no hydraulic jump
   D. Because the trough width equals the canal bed width
   Answer: C. Velocity within the permitted limit and subcritical flow mean no jump and a safe flume. (Key point: Velocity and flow regime in the trough)

## Related in Irrigation and Drainage Engineering

- [Cross drainage: Q 50, bed 35 m, FSD 1.6](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q50-bed35-fsd16-hfd400) — Irrigation and Drainage Engineering, chapter 8, asked 2×
- [Cross drainage waterway and transitions, Q 56](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-water-way-q56-bed24) — Irrigation and Drainage Engineering, chapter 8
- [Syphonic aqueduct canal waterway levels, Q 40](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Asyphonic-aqueduct-levels-q40-hfd520) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage: Q 30, HFL 311 m](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q30-canal-bed310-hfl311) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage (flumed): canal 30, drainage 200](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-flumed-q30-drain200) — Irrigation and Drainage Engineering, chapter 8
- [Cross drainage: canal 300, drainage 500](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Acd-q300-canal-n0016-drain500) — Irrigation and Drainage Engineering, chapter 8

## Related in other subjects

- [Canal earthwork, bed 3 m, free board 0.44 m](https://www.bctengineer.com/question.md?key=semester_7%2Festimating_and_costing%3Achannel-q-portion) — Estimating and Costing, chapter 6