# Khosla: HGL and d/s floor thickness, three piles

Irrigation and Drainage Engineering · Chapter 5: Diversion Headworks

- Asked in: 2064 Kartik (old course), 8 marks
- Video: [Problem on Khosla Theory.](https://www.youtube.com/watch?v=2NEHgwXCa-U) — Civil Giri
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/irrigation_and_drainage_engineering/khosla-corrected-phi-three-piles-hgl
- Whole chapter: https://www.bctengineer.com/md/semester_6/irrigation_and_drainage_engineering/chapter-5

## Question

Following corrected φ values were computed from Khosla's curves in a barrage placed on permeable foundation.
U/S sheet pile: φE1 = 100%, φD1 = 90%, φC1 = 85%
Intermediate pile: φE2 = 80%, φD2 = 70%, φC2 = 65%
D/S sheet pile: φE3 = 55%, φD3 = 45%, φC3 = 0%
Distance between the U/S and intermediate piles is 20 m and that between the intermediate and D/S piles is 40 m. Assuming that the floor is horizontal throughout, draw the HGL for the subsoil flow. If the net head is 10 m, determine the thickness of D/S floor at a distance of 20 m and 30 m away from the intermediate sheet pile. Assume G for the floor material equal to 2.2. The symbols has usual meanings.

## Short answer

Between intermediate and d/s piles, pressure drops linearly from 65% to 55% of total head. With 10 m net head, required floor thickness at 20 m is 5.00 m and at 30 m is 4.79 m.

## Answer

#### Given

Corrected pressures (percent of head): u/s pile $E_1 = 100$, $D_1 = 90$, $C_1 = 85$; intermediate pile $E_2 = 80$, $D_2 = 70$, $C_2 = 65$; d/s pile $E_3 = 55$, $D_3 = 45$, $C_3 = 0$. Net head $H = 10$ m, $G = 2.2$. Piles at 0, 20 m and 60 m (20 m and 40 m apart). The floor is horizontal, with its level taken as the datum (d/s water level).

#### Hydraulic gradient line

The HGL is a vertical drop across each pile and a straight line along the floor between piles:

| Point | Pressure (%) | Head above floor (m) |
|---|---|---|
| $E_1$ | 100 | 10.0 |
| $D_1$ | 90 | 9.0 |
| $C_1$ | 85 | 8.5 |
| $E_2$ | 80 | 8.0 |
| $D_2$ | 70 | 7.0 |
| $C_2$ | 65 | 6.5 |
| $E_3$ | 55 | 5.5 |
| $D_3$ | 45 | 4.5 |
| $C_3$ | 0 | 0 |

```text
 100 E1 |#############################
  90 D1 |##########################
  85 C1 |########################    (floor, 20 m)
  80 E2 |#######################
  70 D2 |####################
  65 C2 |##################          (floor, 40 m)
  55 E3 |################
  45 D3 |#############
   0 C3 |
```

#### Thickness of the d/s floor (between intermediate and d/s piles)

On the 40 m floor the pressure falls linearly from 65% at $C_2$ to 55% at $E_3$:

$$
\phi(x) = 65 - (65-55)\frac{x}{40}
$$

Unbalanced head $h = \phi H/100$ and thickness $t = \dfrac{h}{G-1} = \dfrac{h}{1.2}$:

| Distance from intermediate pile | $\phi$ (%) | $h$ (m) | $t$ (m) |
|---|---|---|---|
| 20 m | 60.0 | 6.00 | 5.00 |
| 30 m | 57.5 | 5.75 | 4.79 |

**Answer:** Required floor thickness $\approx 5.00$ m at 20 m and $\approx 4.79$ m at 30 m from the intermediate sheet pile.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Between the intermediate and d/s piles (40 m), the pressure falls from 65% at C2 to 55% at E3. How is phi at x from the intermediate pile found?
   A. Linear interpolation: phi = 65 - 10 x/40
   B. phi = 55 + 10 x
   C. phi = 65 - 55 x/40
   D. Constant 65%
   Answer: A. The HGL is straight along the floor, so pressure varies linearly between C2 and E3. (Key point: Linear HGL on the floor)

2. What is phi at 20 m from the intermediate pile?
   A. 62.5%
   B. 60%
   C. 55%
   D. 65%
   Answer: B. 65 - 10 x 20/40 = 60%. (Key point: Pressure at 20 m)

3. For h = 6.0 m at 20 m and G = 2.2, the required thickness is
   A. 3.00 m
   B. 5.00 m
   C. 7.20 m
   D. 2.73 m
   Answer: B. t = h/(G-1) = 6.0/1.2 = 5.00 m. (Key point: Thickness formula)

4. Why is the thickness at 30 m smaller than at 20 m?
   A. The net head changes with distance
   B. The floor is thicker there
   C. G increases with distance
   D. Pressure falls along the floor (57.5% against 60%), so the uplift head is smaller
   Answer: D. phi is 57.5% so h = 5.75 m and t = 5.75/1.2 = 4.79 m. (Key point: Thickness at 30 m)

## Related in Irrigation and Drainage Engineering

- [Khosla: barrage HGL and floor thickness](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-barrage-hgl-thickness-pond1135) — Irrigation and Drainage Engineering, chapter 5
- [Khosla: cistern floor thickness from corrected phi](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-corrected-phi-barrage-cistern) — Irrigation and Drainage Engineering, chapter 5
- [Khosla: two piles, floor at A, B, C, exit 0.2](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-two-piles-thickness-abc-02) — Irrigation and Drainage Engineering, chapter 5
- [Khosla's method for barrage floor design](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-barrage-floor-design-method) — Irrigation and Drainage Engineering, chapter 5
- [Khosla: uplift, HGL, thickness, exit gradient 1/5](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-hgl-thickness-gradient-1-in) — Irrigation and Drainage Engineering, chapter 5
- [Khosla (analytical): uplift and d/s floor thickness](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Akhosla-analytical-head-regulator-floor-thickness) — Irrigation and Drainage Engineering, chapter 5

## Related in other subjects

- [Pile spacing for 100% efficiency, 16 piles](https://www.bctengineer.com/question.md?key=semester_5%2Ffoundation_engineering%3Apile-spacing-100-efficiency-square-30cm) — Foundation Engineering, chapter 8, asked 2×