# Conventional ASP design, population 126000

Sanitary Engineering · Chapter 7: Wastewater Treatment

- Asked in: 2079 Chaitra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/sanitary_engineering/asp-126000-checks
- Whole chapter: https://www.bctengineer.com/md/semester_6/sanitary_engineering/chapter-7

## Question

Design a conventional activated sludge treatment plant in your Municipality to treat the domestic sewage with diffused air aeration with the following data. Population = 1,26,000; Per capita sewage flow = 160 lpcd; Settled sewage BOD5 = 200 mg/L; Effluent BOD5 required = 15 mg/L; Take F/M: 0.2 and MLSS = 3000 mg/L. Also check HRT, Volumetric Loading, Return Sludge ratio, Horizontal Velocity.

## Short answer

Design flow 20160 m³/d, aeration tank volume 6720 m³ (detention 8.0 h). Provide three tanks each 47 m × 12.0 m × 4.5 m. Checks: HRT 8.0 h, volumetric loading 0.60 kg BOD/m³/d, return sludge ratio 43%, horizontal velocity 0.10 m/min.

## Answer

#### Data and design basis

Conventional ASP (plug flow, diffused air). The aeration tank volume follows from the food-to-micro-organism ratio:

$$
\frac{F}{M}=\frac{Q\,S_0}{V\,X}\ \Rightarrow\ V=\frac{Q\,S_0}{(F/M)\,X}
$$

Data: settled-sewage $BOD_5=S_0=200$ mg/l; effluent $BOD_5=15$ mg/l (efficiency $\dfrac{200-15}{200}=92.5\%$); $F/M=0.2$/day; MLSS $=3000$ mg/l. Assumed: SVI $=100$ ml/g for the return sludge ratio.

#### Step 1: Design flow

$$
Q = 126000\times160/1000 = 20160.0\ \text{m}^3/\text{day}
$$

#### Step 2: Volume of aeration tank

$$
V = \frac{20160.0\times 200}{0.2\times 3000} = 6720.0\ \text{m}^3
$$

(units: $Q$ in m³/day and $S_0$, $X$ in mg/l = g/m³.)

#### Step 3: Dimensions

$$
\begin{aligned}
\text{Adopt liquid depth } &= 4.0\ \text{m (usual range 3-4.5 m)}\\
\text{Plan area } A &= \frac{V}{4.0} = 1680.0\ \text{m}^2
\end{aligned}
$$

Provide 3 tanks (so one can be taken out of service), each with area $560.0$ m² and L : B about 4 : 1:

$$
B=\sqrt{\frac{560.0}{4}} = 11.83\ \text{m (adopt 12.0 m)},\qquad L=\frac{560.0}{12.0} = 46.7\ \text{m (adopt 47 m)}
$$

Adding 0.5 m free board, the tank depth is 4.5 m. The size of each tank is $47\ \text{m}\times 12.0\ \text{m}\times 4.5\ \text{m}$.

#### Step 4: Checks

$$
\begin{aligned}
\text{Hydraulic retention time} &= \frac{V}{Q} = \frac{6720.0}{20160.0}\times 24 = 8.0\ \text{h}\ (\text{usual 4-8 h; accepted})\\
\text{Volumetric loading} &= \frac{Q\,S_0}{V\times 1000} = 0.60\ \text{kg BOD/m}^3\text{/day}\ (\text{usual 0.3-0.6})
\end{aligned}
$$

$$
\begin{aligned}
\text{Return sludge ratio: } X_R &= \frac{10^6}{SVI} = \frac{10^6}{100} = 10000\ \text{mg/l}\ (SVI\ \text{assumed } 100\ \text{ml/g})\\
\frac{Q_R}{Q} &= \frac{X}{X_R-X} = \frac{3000}{10000-3000} = 0.429\ \ (\approx 43\%)\\
\text{Horizontal velocity} &= \frac{Q/N}{B\times H} = \frac{20160/(86400\times 3)}{12.0\times 4.0} = 0.0016\ \text{m/s}\ (= 0.10\ \text{m/min})
\end{aligned}
$$

**Answer: aeration tank volume $\approx 6720$ m³ (detention 8.0 h, depth 4.0 m); provide 3 tanks, each $47\ \text{m}\times 12.0\ \text{m}$ in plan with liquid depth 4.0 m (tank depth 4.5 m).**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. For 126 000 people at 160 lpcd, what is Q?
   A. 126 000 m3/day
   B. 20 160 m3/day
   C. 2016 m3/day
   D. 201 600 m3/day
   Answer: B. 126000 x 160 / 1000 = 20 160 m3/day. (Key point: Design flow)

2. What volume results with F/M = 0.2, MLSS = 3000 mg/l and S0 = 200 mg/l?
   A. 13 440 m3
   B. 3360 m3
   C. 6720 m3
   D. 1008 m3
   Answer: C. V = 20160 x 200 / (0.2 x 3000) = 6720 m3. (Key point: Aeration volume)

3. What are the HRT and volumetric loading?
   A. HRT = V/Q x 24 = 8.0 h; loading = Q S0/(V x 1000) = 0.60 kg BOD/m3/day
   B. HRT = 4.0 h; loading = 1.2 kg/m3/day
   C. HRT = 8.0 h; loading = 0.20 kg/m3/day
   D. HRT = 24 h; loading = 0.60 kg/m3/day
   Answer: A. 6720/20160 = 0.333 day = 8 h; 20160 x 200 / (6720 x 1000) = 0.60. (Key point: HRT and volumetric loading)

4. How is the return sludge ratio and horizontal velocity found?
   A. Qr/Q = Xr/X = 3.3; velocity = Q/(B x H) for the whole flow
   B. Qr/Q = X/Xr = 0.3; velocity = V/Q
   C. Qr/Q = SVI/100 = 1; velocity = Q/V
   D. Qr/Q = X/(Xr - X) with Xr = 10^6/SVI = 10 000 mg/l gives 0.43; velocity = (Q/N)/(B x H) for one tank
   Answer: D. Sludge balance gives 3000/(10000-3000) = 0.429; with 3 tanks, v = (20160/(86400 x 3))/(12 x 4) = 0.0016 m/s. (Key point: Return sludge ratio and velocity)

## Related in Sanitary Engineering

- [Conventional ASP design, population 50,000](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Aasp-50000-80lpcd) — Sanitary Engineering, chapter 7, asked 2×
- [Conventional ASP design, population 1,00,000](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Aasp-100000-150lpcd) — Sanitary Engineering, chapter 7
- [Conventional ASP design, 96 lpcd](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Aasp-100000-96lpcd) — Sanitary Engineering, chapter 7, asked 2×
- [Conventional ASP design, 0.104 m³/s](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Aasp-0p104-conventional) — Sanitary Engineering, chapter 7
- [Activated sludge and ASP treatment process](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Aasp-sketch-treatment-process) — Sanitary Engineering, chapter 7
- [Degree of treatment, domestic + industrial](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Adegree-treatment-town-40000) — Sanitary Engineering, chapter 6

## Related in other subjects

- [Design pipes AB, BC; 160 lpcd, peak factor 3](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Apd-c71) — Water Supply Engineering, chapter 7