- Asked in: 2074 Bhadra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/sanitary_engineering/combined-sewer-85ha
- Whole chapter: https://www.bctengineer.com/md/semester_6/sanitary_engineering/chapter-3

## Question

What would be your preferable combined sewer section for an 85-hectare residential area having average runoff coefficient of 0.45 for serving altogether 1500 population? Average rainfall duration is 26 min. Self-cleansing velocity is 0.98 m/sec. Residential area have average elevation difference of 22 m in horizontal 5 km longitudinal distance. Assume any other appropriate data if required.

## Short answer

Total flow 2.249 m³/s. With n=0.013, slope 22/5000=1/227, Manning's gives D=1.139 m; adopt 1.2 m circular section, full-flow velocity 2.29 m/s (above self-cleansing 0.98 m/s, below scouring limit). A low-flow channel is advisable.

## Answer

#### Assumptions
Sewage 135 lpcd, of which 80% reaches the sewer; peak factor 3; $n=0.013$ for concrete; circular section running full at peak flow; intensity from the assumed formula $i=\dfrac{760}{t+10}$ mm/hr with storm duration 26 min.

#### Step 1: Discharge
$$
\begin{aligned}
Q_{sew}&=\frac{1500\times135\times0.8\times3}{86400\times1000}=0.0056\ \text{m}^3/\text{s}\\
i&=\frac{760}{26+10}=21.11\ \text{mm/hr}\\
Q_{storm}&=\frac{0.45\times21.11\times85}{360}=2.243\ \text{m}^3/\text{s}\\
Q&=Q_{sew}+Q_{storm}=2.249\ \text{m}^3/\text{s}
\end{aligned}
$$

#### Step 2: Slope
$$
S=\frac{\text{fall}}{\text{length}}=\frac{22}{5000}=0.00440\approx\frac{1}{227}
$$

#### Step 3: Size
$$
D=\left(\frac{Q\,n}{0.3117\,S^{1/2}}\right)^{3/8}=\left(\frac{2.249\times0.013}{0.3117\times0.0663}\right)^{3/8}=1.139\ \text{m}
$$

Adopt $D=1.200$ m. Then $v_f=\dfrac{0.3969}{0.013}(1.200)^{2/3}S^{1/2}=2.29$ m/s and $Q_f=2.586$ m³/s.

#### Step 4: Check
The full-flow velocity of 2.29 m/s is greater than the required self-cleansing velocity of 0.98 m/s and below the maximum of 3 m/s, so the section is satisfactory. At the very small dry weather flow (about 0.0056 m³/s) the velocity in this big pipe will be lower, so a small low-flow channel (cunette) in the invert or an egg-shaped section is advisable.

**Answer: A circular combined sewer of about 1200 mm (1.2 m) diameter at a slope of 22/5000 (1 in 227), carrying 2.249 m³/s at a velocity of 2.29 m/s.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which flow dominates the design of this combined sewer?
   A. Storm water flow (2.243 m3/s) far exceeds sewage flow (0.0056 m3/s)
   B. Sewage flow, since it is dry weather flow
   C. Both equally
   D. Neither; infiltration controls
   Answer: A. Q_storm = CiA/360 with A = 85 ha dwarfs the sewage from 1500 people. (Key point: Dominant flow)

2. How is the slope obtained from the data?
   A. S = length / fall = 5000/22
   B. S = fall / length = 22/5000 = 1 in 227
   C. S = 22 x 5
   D. Slope from Manning with v = 0.98 m/s only
   Answer: B. The ground elevation difference over the length gives the gradient. (Key point: Slope of the sewer)

3. With sewer running full, what gives D?
   A. D from the sewage flow only
   B. D = Q / v with v = 0.98
   C. D = (Q n / (0.3117 S^(1/2)))^(3/8) = 1.139 m, adopt 1.2 m
   D. D = (Q n / S)^(3/8) with no constant
   Answer: C. Full-pipe Manning with Q = 2.249 m3/s gives 1.139 m. (Key point: Size from Manning)

4. Why may a cunette or egg-shaped section be advisable?
   A. Because storm flow is too small
   B. Because slope is too steep
   C. Because velocity at full flow is above 3 m/s
   D. At very small dry weather flow the velocity in a large circular pipe falls below self-cleansing
   Answer: D. A narrow low-flow channel keeps depth and velocity adequate for the small sewage flow. (Key point: Low-flow problem)

## Related in Sanitary Engineering

- [Circular combined sewer, 60 ha](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Acombined-sewer-60ha) — Sanitary Engineering, chapter 3
- [Combined circular sewer, 35 ha](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Acombined-sewer-35ha) — Sanitary Engineering, chapter 3
- [Sewer diameter for a 12 sq km area](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Asewer-diameter-12-sqkm) — Sanitary Engineering, chapter 3
- [Design discharge of rural combined sewer](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Adesign-discharge-combined-rural) — Sanitary Engineering, chapter 2
- [Runoff from a 20 ha built-up area](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Arunoff-builtup-area-20ha) — Sanitary Engineering, chapter 2
- [Sewer diameter for a 2.5 sq km area](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Asewer-diameter-2p5-sqkm) — Sanitary Engineering, chapter 3

## Related in other subjects

- [Phi-index and rainfall excess duration, 0.340 Mm3 runoff](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aphi-index-500ha-0-340mm3) — Engineering Hydrology, chapter 3, asked 2×
- [Total rainfall, net runoff, W-index of 140-min storm](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aphi-w-index-140min-storm) — Engineering Hydrology, chapter 3, asked 2×
- [Total rainfall, net runoff, W-index of 120-min storm](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aphi-w-index-120min-storm) — Engineering Hydrology, chapter 3, asked 2×
- [Total rainfall, runoff and peak discharge with phi-index](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Aphi-index-50ha-2-5) — Engineering Hydrology, chapter 3