# Critical DO deficit, 300 l/s into river

Sanitary Engineering · Chapter 6: Wastewater Disposal

- Asked in: 2072 Asoj, 8 marks
- Video: [oxygen deficit problem | DO deficit solved problem | oxygen deficit in downstream side of river](https://www.youtube.com/watch?v=4wst5Ot1YIg) — Civil Engineering Exam
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/sanitary_engineering/critical-do-city-300ls-48kmday
- Whole chapter: https://www.bctengineer.com/md/semester_6/sanitary_engineering/chapter-6

## Question

A town is discharging sewage of 300 liters/second in the river having discharge of 1300 liters/second and a velocity of 48 km/day. The BOD5 of sewage and river water are 400 mg/l and 4 mg/l respectively. The DO of sewage sample is nil. D.O. in the river water is 80% of the saturation value. The temperature of both sewage and river water is 20°C. The saturation DO at 20°C is 9.17 mg/l. Assume K1 = 0.1/day and K2 = 0.4/day (both with base 10). Calculate the critical DO deficit.

## Short answer

Critical DO deficit is 18.56 mg/l at 1.88 days (90.2 km downstream). Mixed BOD5=78.25 mg/l, ultimate BOD=114.4 mg/l, initial deficit=3.21 mg/l. Minimum DO negative, stream would become anaerobic without treatment.

## Answer

River DO $=0.8\times 9.17=7.336$ mg/l. Both temperatures are 20°C, so no correction is needed. $K_1=0.1$, $K_2=0.4$ (base 10), $f=4$. Flows are in l/s.
#### Step 1: Conditions just after mixing

$$
\begin{aligned}
Q_{mix} &= Q_s+Q_r = 300 + 1300 = 1600\ l/s\\
BOD_5^{mix} &= \frac{Q_sB_s+Q_rB_r}{Q_s+Q_r} = \frac{300\times 400 + 1300\times 4}{1600} = 78.25\ \text{mg/l}\\
DO_{mix} &= \frac{Q_s DO_s+Q_r DO_r}{Q_s+Q_r} = \frac{300\times 0 + 1300\times 7.336}{1600} = 5.96\ \text{mg/l}\\
D_0 &= DO_{sat}-DO_{mix} = 9.17 - 5.96 = 3.21\ \text{mg/l}
\end{aligned}
$$

#### Step 2: Ultimate BOD and self-purification constant

$$
\begin{aligned}
L_0 &= \frac{BOD_5}{1-10^{-5K}} = \frac{78.25}{1-10^{-5\times 0.1}} = 114.44\ \text{mg/l}\\
f &= \frac{R}{K} = \frac{0.4}{0.1} = 4.00
\end{aligned}
$$

#### Step 3: Critical time and critical deficit

$$
\begin{aligned}
t_c &= \frac{1}{K(f-1)}\log_{10}\left[f\left\{1-(f-1)\frac{D_0}{L_0}\right\}\right]\\
&= \frac{1}{0.1(4.00-1)}\log_{10}\left[4.00\left\{1-(4.00-1)\frac{3.21}{114.44}\right\}\right] = 1.880\ \text{days}\\
D_c &= \frac{L_0}{f}\,10^{-K t_c} = \frac{114.44}{4.00}\times 10^{-0.1\times 1.880} = 18.56\ \text{mg/l}
\end{aligned}
$$
**Answer: critical DO deficit $D_c = 18.56$ mg/l**, reached after $t_c=1.880$ days (about 90.2 km downstream at 48 km/day). Minimum DO $=9.17-18.56=-9.39$ mg/l.

*Note:* the computed deficit is larger than the saturation DO (9.17 mg/l). In reality DO cannot fall below zero, so the stream would go anaerobic near the critical point and the effluent needs treatment before discharge. The negative value is simply what the formula gives for these data.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What is BOD5 of the mixture?
   A. 202 mg/L
   B. (300 x 400 + 1300 x 4)/1600 = 78.25 mg/L
   C. 400 mg/L
   D. 4 mg/L
   Answer: B. BOD is flow-weighted. (Key point: Mixed BOD)

2. What is f?
   A. 0.25
   B. 0.3
   C. 4
   D. 40
   Answer: C. f = K2/K1 = 0.4/0.1 = 4. (Key point: Self-purification factor)

3. What is Dc?
   A. 3.21 mg/L
   B. 9.17 mg/L
   C. 1.88 mg/L
   D. 18.56 mg/L, after tc = 1.880 days
   Answer: D. Dc = (114.44/4) x 10^(-0.188) = 18.56 mg/L. (Key point: Critical deficit)

4. Dc exceeds the saturation DO. What does this imply?
   A. DO would fall to zero; the stream goes anaerobic and treatment is needed
   B. The result is perfectly safe
   C. Reaeration is high
   D. The river is clean
   Answer: A. Oxygen cannot go below zero, so the stream turns anaerobic near the critical point. (Key point: Interpretation)

## Related in Sanitary Engineering

- [Time of critical DO deficit, 50 l/s city](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Acritical-do-time-city-50ls) — Sanitary Engineering, chapter 6, asked 2×
- [Critical DO deficit, city 100 l/s](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Acritical-do-city-100ls) — Sanitary Engineering, chapter 6, asked 2×
- [Critical DO deficit, location, sag curve](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Asag-curve-effluent-1p5-stream-7p5) — Sanitary Engineering, chapter 6
- [Is treatment necessary? Town wastewater 300 l/s](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Atreatment-needed-town-300-ls) — Sanitary Engineering, chapter 6
- [1-day BOD 300 mg/l to 5-day at 30°C](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Abod-1day-300-to-5day-30c) — Sanitary Engineering, chapter 5
- [DO deficit 50 km downstream, 1.9 m³/s stream](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Astream-do-deficit-50km) — Sanitary Engineering, chapter 6, asked 2×

## Related in other subjects

- [Critical DO deficit and location downstream](https://www.bctengineer.com/question.md?key=semester_7%2Fenvironment_and_pollution_control%3Aoxygen-sag-critical-deficit-numerical) — Environment and Pollution Control, chapter 4
- [Ca and Mg concentration, alkalinity (300 mg/l hardness)](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ahardness-ca-mg-equal-300) — Water Supply Engineering, chapter 4, asked 2×
- [Rural area 22000 L/day river supply (question text cut)](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ares-a76) — Water Supply Engineering, chapter 7
- [Impounded reservoir, 400 m3/day demand](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Aimpounded-reservoir-b66) — Water Supply Engineering, chapter 2