title: "Zones and backup for breaker 7 failure"
subject: "Switchgear and Protection"
chapter: 1
key: "semester_6/switchgear_and_protection:zones-backup-breaker-7"
source: https://www.bctengineer.com/q/semester_6/switchgear_and_protection/zones-backup-breaker-7
site: BCT Engineering
---

# Zones and backup for breaker 7 failure

Switchgear and Protection · Chapter 1: Principle of Power System Protection

- Asked in: 2074 Bhadra, 6 marks
- Video: [Lec (5) Part (7): Principles of Breaker Failure](https://www.youtube.com/watch?v=pPV2p6XNS74) — Prof. Eng. Courses
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_6/switchgear_and_protection/zones-backup-breaker-7
- Whole chapter: https://www.bctengineer.com/md/semester_6/switchgear_and_protection/chapter-1

## Question

Consider the system portion shown in figure below. (i) Sketch the zone of protection. (ii) Describe a possible backup scheme for failure of breaker 7 for a fault on line BC; is load 1 interrupted? (iii) Describe a means of clearing a fault on line BC without a momentary interruption of load 1.
[Figure: Bus A is fed through breaker 1. Two parallel lines run from bus A to bus B: the upper line has breaker 2 at A and breaker 4 at B, the lower line has breaker 3 at A and breaker 5 at B. Load 1 is supplied from bus B through breaker 6. Line BC leaves bus B through breaker 7 and reaches bus C, from which Load 2 is supplied through breaker 8.]

## Short answer

Zones: bus A (1,2,3), line AB1 (2,4), line AB2 (3,5), bus B (4,5,6,7), line BC (7,8), load 1 (6), load 2 (8). If breaker 7 fails, breaker-failure relay trips 4,5,6; load 1 is interrupted. To avoid interruption, use double-bus with bus coupler or two series breakers on BC, so bus B remains healthy and load 1 stays fed.

## Answer

Assumption: breakers 1–8 are as described; each line has a breaker at both ends and bus B connects breakers 4, 5, 6 and 7.

#### (i) Zones of protection
```text
       [1]
  ┌─────┼──────── Bus A zone ──────┐
  │  ───┴──┬──────────────┬───     │
  └────────┼──────────────┼────────┘
          [2]            [3]
  ┌ Line AB1 ┐      ┌ Line AB2 ┐
  │    │     │      │    │     │
  └───[4]────┘      └───[5]────┘
  ┌────────┼──────────────┼────────┐
  │  ──────┴───┬──────┬───┴──      │ Bus B zone
  └───────────[6]────[7]───────────┘
           Load 1 ┌──┼────────┐ Line BC
                  │  │        │ zone
                  └─[8]───────┘
                     │ Bus C / Load 2
 Each zone overlaps its neighbours at
 every breaker (1,2,3,4,5,6,7,8).
```
Zones: bus A (1, 2, 3); line AB-1 (2, 4); line AB-2 (3, 5); bus B (4, 5, 6, 7); line BC (7, 8); load 1 feeder (6); load 2 / bus C (8).

#### (ii) Back-up for failure of breaker 7 (fault on line BC)
- Normally relays of line BC trip breakers 7 and 8.
- If breaker 7 fails to open, the fault is still fed from bus B.
- **Local back-up (breaker failure protection):** after about 150–200 ms, the breaker-failure relay of 7 trips all other breakers connected to bus B: **4, 5 and 6**.
- **Remote back-up (alternative):** zone-2/zone-3 distance relays or time-graded overcurrent relays at bus A trip **2 and 3**.
- In both cases bus B is de-energised, so **load 1 is interrupted** (in the local scheme breaker 6 is tripped; in the remote scheme bus B loses supply).

#### (iii) Clearing BC fault without momentary interruption of load 1
The fault current from bus B must be interrupted by a breaker other than the one that isolates load 1. Possible means:
- Provide **two breakers in series** on the BC line at B (or a breaker-and-a-half / ring bus arrangement), so that if breaker 7 fails the second breaker clears the fault and bus B remains healthy.
- Use a **double-bus with bus coupler** arrangement: line BC and load 1 on different buses; the breaker-failure relay of 7 trips only the bus coupler and the breakers of BC's bus.

With these arrangements a fault on BC, even with a stuck breaker, is removed without de-energising the bus that supplies load 1.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. If breaker 7 fails for a BC fault, which breakers does breaker-failure protection trip?
   A. 4, 5 and 6
   B. 1, 2 and 3
   C. 8 and 9 only
   D. Only 7 again
   Answer: A. It trips all other breakers on bus B after about 150-200 ms. (Key point: Local back-up)

2. Is load 1 interrupted in this back-up scheme?
   A. No, it stays fed through breaker 6
   B. No, because breaker 8 supplies it
   C. Yes, because bus B is de-energised
   D. Only if line AB fails
   Answer: C. Tripping bus B breakers (including 6) interrupts load 1. (Key point: Load 1)

3. What is the remote back-up alternative?
   A. Relays at bus C trip breaker 9
   B. Distance zone-2/3 or time-graded overcurrent relays at bus A trip 2 and 3
   C. Breaker 6 trips alone
   D. Nothing trips
   Answer: B. Upstream relays at A act as delayed back-up. (Key point: Remote back-up)

4. How can a BC fault be cleared without interrupting load 1?
   A. Using a single bus with one breaker
   B. Increasing relay delay
   C. Removing breaker 8
   D. Two breakers in series on BC at B (or breaker-and-a-half/ring), or double bus with coupler
   Answer: D. A second breaker clears the fault so bus B stays healthy. (Key point: No interruption)

## Related in Switchgear and Protection

- [Ring bus rearrangement and zones](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Aring-bus-comparison) — Switchgear and Protection, chapter 1
- [Protection requirements; protective system vs scheme](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Aprotective-system-vs-scheme) — Switchgear and Protection, chapter 1
- [Requirements, coordination and protection zone](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Arequirements-coordination-zone) — Switchgear and Protection, chapter 1
- [Methods of providing backup protection](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Amethods-backup-protection) — Switchgear and Protection, chapter 1
- [Fault clearing process with trip circuit](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Afault-clearing-trip-circuit) — Switchgear and Protection, chapter 1
- [Zones of protection and their rules](https://www.bctengineer.com/question.md?key=semester_6%2Fswitchgear_and_protection%3Azones-of-protection) — Switchgear and Protection, chapter 1, asked 2×

## Related in other subjects

- [Critical clearing time and angle, fault at P](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Acritical-clearing-time-point-p-h5) — Power System Analysis II, chapter 6
- [Critical clearing angle/time, fault at infinite bus](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Acritical-clearing-infinite-bus-h5) — Power System Analysis II, chapter 6
- [Fault at load end of overhead line](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Afault-load-end-33kv-line) — Power System Analysis II, chapter 3
- [Critical clearing, fault at infinite bus, H = 6](https://www.bctengineer.com/question.md?key=semester_5%2Fpower_system_analysis_ii%3Acritical-clearing-fault-infinite-bus-h6) — Power System Analysis II, chapter 6