title: "Toe-drain earthen dam: discharge and phreatic line"
subject: "Hydropower Engineering"
chapter: 4
key: "semester_7/hydropower_engineering:earthen-dam-toe-drain-2069"
source: https://www.bctengineer.com/q/semester_7/hydropower_engineering/earthen-dam-toe-drain-2069
site: BCT Engineering
---

# Toe-drain earthen dam: discharge and phreatic line

Hydropower Engineering · Chapter 4: Headworks of Storage Plants

- Asked in: 2069 Chaitra, 10 marks
- Video: [Design of Phreatic line in earthen dam with filter](https://www.youtube.com/watch?v=V5pnA13B3r0) — MSR Geo Spatial Solutions
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/earthen-dam-toe-drain-2069
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-4

## Question

The u/s and d/s slopes of a homogeneous earthen dam with 12 m toe drain are 2:1 and 3:1 (H:V) respectively. The water depth at u/s of the dam is 50 m. The dam has a crest width of 20 m and free board of 5 m. The coefficient of permeability of the dam material is 2.5 cm/hr. Calculate (i) the specific discharge through the body of the dam, (ii) the co-ordinates of the phreatic line.

## Short answer

With focus at the upstream end of the toe drain, y0 = 5.79 m, phreatic line y = sqrt(33.52+11.58x). Specific discharge q = k·y0 = 4.021×10⁻⁵ m³/s per m.

## Answer

**Given**: u/s slope 2:1, d/s slope 3:1 (H:V), water depth $h=50$ m, free board 5 m so dam height $=55$ m, crest width 20 m, toe drain 12 m long, $k=2.5$ cm/hr $=\dfrac{2.5}{100\times3600}=6.944 \times 10^{-6}$ m/s.

```text
   55 m   20 m
        ________
  2:1  /        \ 3:1
 50m  /  dam     \        toe drain 12 m
 ~~~ /            \_____[#######]
 ////////////////////////////////
```

#### Step 1: Geometry
$$
\begin{aligned}
B &= 2(55)+20+3(55)=295\ \text{m}\\
b &= 2\times50=100\ \text{m},\quad 0.3b=30\ \text{m}\\
d &= B-0.7b-12 = 295-70-12 = 213\ \text{m}
\end{aligned}
$$
($d$ is measured from the corrected entry point to the u/s end of the toe drain, which is the focus of the parabola.)

#### Step 2: (i) Specific discharge
$$
y_0=\sqrt{h^2+d^2}-d=\sqrt{50^2+213^2}-213=5.790\ \text{m}
$$
$$
q=k\,y_0=6.944 \times 10^{-6}\times5.790=4.021 \times 10^{-5}\ \text{m}^3/\text{s per m}\quad(\approx3.47\ \text{m}^3/\text{day per m})
$$

#### Step 3: (ii) Co-ordinates of the phreatic line
$$
y=\sqrt{y_0^2+2y_0x}=\sqrt{33.52+11.58\,x}
$$
with $x$ from the focus (u/s end of the toe drain) towards the u/s side:

| x from focus (m) | y (m) |
|---|---|
| 0.0 | 5.79 |
| 10.0 | 12.22 |
| 25.0 | 17.97 |
| 50.0 | 24.75 |
| 75.0 | 30.03 |
| 100.0 | 34.52 |
| 125.0 | 38.48 |
| 150.0 | 42.08 |
| 175.0 | 45.39 |
| 200.0 | 48.47 |
| 213.0 | 50.00 |

At $x=213$ m the ordinate is $50$ m (corrected entry). The line is joined to the u/s face at right angles at the entry, and since the line enters the toe drain ($\alpha=180^\circ$) no exit correction is needed ($\Delta a=0$); it meets the drain at about $a=y_0/2=2.89$ m beyond the focus.

**Answer**: (i) $q=4.021 \times 10^{-5}$ m³/s per m; (ii) $y=\sqrt{33.52+11.58\,x}$ with $y_0=5.790$ m, as tabulated.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. With water depth 50 m and free board 5 m, how are B and b taken?
   A. Dam height 55 m: B = 2(55)+20+3(55) = 295 m; b = 2 x 50 = 100 m
   B. Dam height 50 m: B = 2(50)+20+3(50) = 270 m
   C. Dam height 55 m: b = 2 x 55 = 110 m
   D. Dam height 45 m: B = 245 m
   Answer: A. Slopes act over the full dam height (55 m), while b is the wetted u/s horizontal length using the water depth. (Key point: Dam height and geometry)

2. For a 12 m toe drain, d is measured to which point?
   A. From the corrected entry point to the u/s end of the toe drain, d = 295 - 70 - 12 = 213 m
   B. From the u/s toe to the d/s toe, 295 m
   C. From the crest to the drain, 20 m
   D. From the corrected entry to the d/s toe, 225 m
   Answer: A. The u/s end of the toe drain is the focus, so the drain length is subtracted: d = B - 0.7b - 12. (Key point: Distance d with toe drain)

3. What is the correct approach for specific discharge?
   A. Convert k = 2.5 cm/hr to 6.944 x 10^-6 m/s and use q = k y0 with y0 = 5.79 m
   B. Use k = 2.5 m/s directly
   C. Use q = k h with h = 50 m
   D. Use q = k d with d = 213 m
   Answer: A. k must be in m/s: 2.5/(100 x 3600). Then q = k y0 = 4.02 x 10^-5 m3/s per m. (Key point: Unit conversion and discharge)

## Related in Hydropower Engineering

- [Phreatic line and discharge (crest 300 masl)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-phreatic-line-2079-baishakh) — Hydropower Engineering, chapter 4, asked 2×
- [Earth dam with drain pipe: phreatic coordinates](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-drain-pipe-phreatic) — Hydropower Engineering, chapter 4
- [Phreatic line and discharge (k = 5.1×10⁻⁴ cm/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-phreatic-line-2082) — Hydropower Engineering, chapter 4, asked 2×
- [Seepage line for 22 m high earthen dam](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-seepage-line-22m-45deg) — Hydropower Engineering, chapter 4
- [Seepage and phreatic line: horizontal filter at toe](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aseepage-horizontal-filter-derivation) — Hydropower Engineering, chapter 4, asked 3×
- [Seepage discharge through dam body (k = 1×10⁻⁶ m/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-seepage-gradient-figure-2072k) — Hydropower Engineering, chapter 4

## Related in other subjects

- [Stresses in gravity dam with drain holes](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Agravity-dam-stresses-figure) — Hydro Power, chapter 4
- [Balancing depth with service bank and free board](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Abalancing-depth-bed8-service-bank) — Irrigation and Drainage Engineering, chapter 3
- [Earth dam flow net and discharge](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Aearth-dam-flow-net-compare-discharge) — Soil Mechanics, chapter 7
- [Impervious dam seepage discharge](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Aimpervious-dam-seepage-discharge-numerical) — Soil Mechanics, chapter 7