# Forebay design (15 m³/s, 4 minutes)

Hydropower Engineering · Chapter 6: Water Conveyance Structures

- Asked in: 2071 Chaitra, 4 marks
- Video: [Design of Forebay || Hydropower Engineering Numerical](https://www.youtube.com/watch?v=E9tU-GG_tuM) — OPengineer
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/forebay-design-15cumec-4min
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-6

## Question

Design a forebay using the following data: Q = 15 m³/s; storage requirement = 4 minutes; length of penstock = 500 m; diameter of penstock = 2 m.

## Short answer

With 4 min retention, volume = 15×240 = 3600 m³, area 75 m², depth 7.4 m. Forebay 48 m long × 10.5 m wide × 7.4 m deep.

## Answer

**Given**: $Q=15.0$ m³/s; 1 penstock (assumed) of diameter 2.0 m and length 500 m; storage (retention) time 4 min; limiting velocity in the forebay 0.20 m/s (assumed, the usual limit, as it is not given).

#### Step 1: Volume of the forebay
The forebay stores the water for the retention time:
$$
V=Q\,t=15.0\times(4\times60)=3600\ \text{m}^3
$$

#### Step 2: Cross-sectional area from the velocity limit
$$
A=\frac{Q}{v}=\frac{15.0}{0.20}=75.0\ \text{m}^2
$$

#### Step 3: Depth of water (submergence of the penstock intake)
Velocity in the penstock: $V_p=\dfrac{Q}{\frac{\pi}{4}D^2}=4.775$ m/s.
Minimum submergence to avoid vortices (Gordon, with $C=0.7245$ for an asymmetrical approach, which is on the safe side):
$$
S=0.7245\,V_p\sqrt{D}=0.7245\times4.775\times\sqrt{2.0}=4.89\ \text{m}
$$
Water depth = $S+D+$ bottom clearance of 0.5 m $=4.89+2.0+0.5=7.39$ m, adopt $H=7.4$ m.

#### Step 4: Width and length
$$
B=\frac{A}{H}=\frac{75.0}{7.4}=10.14\ \text{m},\qquad L=\frac{V}{A}=\frac{3600}{75.0}=48.0\ \text{m}
$$
Adopt $B=10.5$ m and $L=48$ m (the volume is then $B\,L\,H=3730$ m³ $\ge V$).

The penstock length (500 m) is not needed to size the forebay by this method; it matters for the penstock head loss and the water hammer.

```text
PLAN
 headrace        forebay                 penstock
 tunnel/canal  +------------------+
 ====> \       |                  |
        \ trans| trash rack       |==> penstock
 ====> /       |                  |
              +--+-spillway-+-flush+
                   |          |
                   v          v  to river (spillway/flushing)

SECTION
 canal bed ____ WL ~~~~~~~~~~~~~~~~~~~~~~
                  |        S (submergence)
                  |   rack  ____ crown
                  |   ####  \   penstock
 flushing  ______ |___####____\_D__
 bottom clearance 0.5 m
```

| Item | Value |
|---|---|
| Storage volume | 3600 m³ |
| Water depth | 7.4 m (+0.5 m free board) |
| Width | 10.5 m |
| Length | 48 m |
| Submergence of penstock crown | 4.89 m |

**Answer**: forebay about 48 m long x 10.5 m wide x 7.4 m deep (water), with a volume of 3600 m³.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Q = 15 m^3/s with 4 min storage requires what volume?
   A. 2700 m^3
   B. 900 m^3
   C. 3600 m^3
   D. 60 m^3
   Answer: C. V = 15 x 240 = 3600 m^3. (Key point: Storage volume)

2. For one penstock D = 2 m carrying 15 m^3/s, the velocity is about?
   A. 4.77 m/s
   B. 7.5 m/s
   C. 1.5 m/s
   D. 2.39 m/s
   Answer: A. 15/(pi/4 x 4) = 4.775 m/s. (Key point: Penstock velocity)

3. Which formula gives the minimum submergence to avoid vortices?
   A. S = 0.7245 V sqrt(D)
   B. S = 0.5 D
   C. S = V^2/2g
   D. S = Q/A
   Answer: A. Gordon's relation for symmetrical approach: S = 0.7245 V sqrt(D) = 4.89 m here. (Key point: Gordon submergence)

4. Which set matches the adopted forebay?
   A. L = 40 m, B = 13 m, H = 5.1 m
   B. L = 48 m, B = 15 m, H = 4.8 m
   C. L = 36 m, B = 12 m, H = 8.4 m
   D. L = 48 m, B = 10.5 m, H = 7.4 m
   Answer: D. L = 3600/75 = 48 m, B = 75/7.4 about 10.5 m, H = 4.89 + 2 + 0.5 = 7.4 m. (Key point: Dimensions)

## Related in Hydropower Engineering

- [Forebay dimension for 3 minutes storage](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-dimension-3min-storage-2-24m) — Hydropower Engineering, chapter 6
- [Forebay design (20 m³/s, 300 m penstock)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-20cumec-300m) — Hydropower Engineering, chapter 6
- [Forebay design with spillway length (14 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-14cumec-spillway-length) — Hydropower Engineering, chapter 6
- [Most economic penstock diameter (cost numerical)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Apenstock-economic-diameter-cost-numerical) — Hydropower Engineering, chapter 6
- [Forebay design considerations; design for 12 m³/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-considerations-12cumec) — Hydropower Engineering, chapter 6
- [Forebay design (14.5 m³/s, two penstocks)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-14-5cumec) — Hydropower Engineering, chapter 6

## Related in other subjects

- [Economic penstock diameter by empirical formulas](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-economic-diameter-formulas) — Hydro Power, chapter 5
- [Economic diameter of penstock](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-economic-diameter) — Hydro Power, chapter 5, asked 5×
- [Surge tank objectives and economic penstock diameter factors](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asurge-tank-objectives-economic-diameter) — Hydro Power, chapter 5
- [Penstock thickness and economic diameter](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-thickness-economic-diameter) — Hydro Power, chapter 5