# Forebay design (20 m³/s, 300 m penstock)

Hydropower Engineering · Chapter 6: Water Conveyance Structures

- Asked in: 2080 Bhadra, 6 marks
- Video: [Design of Forebay || Hydropower Engineering Numerical](https://www.youtube.com/watch?v=wBR0XxeCHEw) — OPengineer
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/forebay-design-20cumec-300m
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-6

## Question

Design a forebay with the following data: design discharge = 20 m³/s, penstock length = 300 m, detention time = 3 minutes, diameter of penstock = 2.2 m.

## Short answer

Volume 3600 m³, area 100 m², depth 8.4 m. Forebay 36 m × 12 m × 8.4 m.

## Answer

**Given**: $Q=20.0$ m³/s; 1 penstock (only one diameter is given) of diameter 2.2 m and length 300 m; retention (detention) time 3 min; limiting velocity in the forebay 0.20 m/s (assumed, as it is not given).

#### Step 1: Volume of the forebay
The forebay stores the water for the retention time:
$$
V=Q\,t=20.0\times(3\times60)=3600\ \text{m}^3
$$

#### Step 2: Cross-sectional area from the velocity limit
$$
A=\frac{Q}{v}=\frac{20.0}{0.20}=100.0\ \text{m}^2
$$

#### Step 3: Depth of water (submergence of the penstock intake)
Velocity in the penstock: $V_p=\dfrac{Q}{\frac{\pi}{4}D^2}=5.261$ m/s.
Minimum submergence to avoid vortices (Gordon, with $C=0.7245$ for an asymmetrical approach, which is on the safe side):
$$
S=0.7245\,V_p\sqrt{D}=0.7245\times5.261\times\sqrt{2.2}=5.65\ \text{m}
$$
Water depth = $S+D+$ bottom clearance of 0.5 m $=5.65+2.2+0.5=8.35$ m, adopt $H=8.4$ m.

#### Step 4: Width and length
$$
B=\frac{A}{H}=\frac{100.0}{8.4}=11.90\ \text{m},\qquad L=\frac{V}{A}=\frac{3600}{100.0}=36.0\ \text{m}
$$
Adopt $B=12.0$ m and $L=36$ m (the volume is then $B\,L\,H=3629$ m³ $\ge V$).

The penstock length (300 m) is not needed to size the forebay by this method; it matters for the penstock head loss and the water hammer.

```text
PLAN
 headrace        forebay                 penstock
 tunnel/canal  +------------------+
 ====> \       |                  |
        \ trans| trash rack       |==> penstock
 ====> /       |                  |
              +--+-spillway-+-flush+
                   |          |
                   v          v  to river (spillway/flushing)

SECTION
 canal bed ____ WL ~~~~~~~~~~~~~~~~~~~~~~
                  |        S (submergence)
                  |   rack  ____ crown
                  |   ####  \   penstock
 flushing  ______ |___####____\_D__
 bottom clearance 0.5 m
```

| Item | Value |
|---|---|
| Storage volume | 3600 m³ |
| Water depth | 8.4 m (+0.5 m free board) |
| Width | 12.0 m |
| Length | 36 m |
| Submergence of penstock crown | 5.65 m |

**Answer**: forebay about 36 m long x 12.0 m wide x 8.4 m deep (water), with a volume of 3600 m³.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Q = 20 m^3/s with 3 min detention gives what volume?
   A. 6000 m^3
   B. 1200 m^3
   C. 3600 m^3
   D. 360 m^3
   Answer: C. V = 20 x 180 = 3600 m^3. (Key point: Storage volume)

2. With one penstock of D = 2.2 m carrying 20 m^3/s, how is the penstock velocity found?
   A. V = Q/(2 x pi/4 x D^2) = 2.63 m/s
   B. V = Q/(pi/4 x D^2) = 5.26 m/s
   C. V = Q/D = 9.1 m/s
   D. V = Q x D
   Answer: B. One pipe takes the full flow: 20/3.801 = 5.26 m/s; this is used in Gordon's formula. (Key point: Single penstock velocity)

3. The question gives no forebay velocity. What is assumed to find A?
   A. 0.2 m/s limiting velocity, so A = 100 m^2
   B. The penstock velocity
   C. 1 m/s, so A = 20 m^2
   D. 0.5 m/s, so A = 40 m^2
   Answer: A. The usual limit 0.2 m/s gives A = 20/0.2 = 100 m^2. (Key point: Assumed velocity)

4. Why is the depth so large (8.4 m) compared with the earlier 2-penstock cases?
   A. Penstock length is 300 m
   B. Higher penstock velocity gives larger Gordon submergence (5.65 m)
   C. The width is smaller
   D. Retention time is longer
   Answer: B. S = 0.7245 V sqrt(D) grows with velocity, and depth = S + D + 0.5. (Key point: Depth effect)

## Related in Hydropower Engineering

- [Forebay design with spillway length (14 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-14cumec-spillway-length) — Hydropower Engineering, chapter 6
- [Forebay design (15 m³/s, 4 minutes)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-15cumec-4min) — Hydropower Engineering, chapter 6
- [Forebay dimension for 3 minutes storage](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-dimension-3min-storage-2-24m) — Hydropower Engineering, chapter 6
- [Forebay design considerations; design for 12 m³/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-considerations-12cumec) — Hydropower Engineering, chapter 6
- [Forebay design (14.5 m³/s, two penstocks)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-14-5cumec) — Hydropower Engineering, chapter 6
- [Penstock thickness with gate closure time](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Apenstock-thickness-water-hammer-600m) — Hydropower Engineering, chapter 6

## Related in other subjects

- [Design discharge from given data](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Adesign-discharge-sewer-75000) — Sanitary Engineering, chapter 2
- [Economic penstock diameter by empirical formulas](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-economic-diameter-formulas) — Hydro Power, chapter 5
- [Penstock thickness (1.3 m, 20 kg/cm²)](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-thickness-1-3m) — Hydro Power, chapter 5
- [Penstock thickness (1.20 m, 17.5 kg/cm²)](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Apenstock-thickness-1-2m) — Hydro Power, chapter 5