# Avoiding load shedding and approach to 2020

Hydropower Engineering · Chapter 1: Introduction

- Asked in: 2070 Chaitra, 2+3 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/load-shedding-approach-2020
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-1

## Question

"Most of the political parties of Nepal are determined to avoid load shedding during 5 years in their manifesto." Do you agree with their commitment during this period? What approach needs to be taken for hydropower development in Nepal to meet the demand up to 2020?

## Short answer

Partly agree: load-shedding was ended by 2018 through imports and better management, but lasting solution requires domestic generation. Approach up to 2020: fast-track ongoing projects, develop storage and peaking run-of-river, build transmission lines, reduce system loss, enable cross-border trade, simplify licensing, offer bankable PPAs, and promote demand-side management.

## Answer

#### Do I agree?
**Yes, partly.** Load shedding could be ended within about 5 years, but only if the parties follow the plan with real action. At the time, Nepal's peak demand was about 1,300-1,400 MW against a dry-season supply of only 400-500 MW. The gap could be closed by (a) completing the projects under construction, (b) importing from India, and (c) reducing losses. In practice, Nepal declared the end of load shedding in 2018 (through imports, better management and new IPP plants), so the commitment was achievable. But a lasting end needs generation inside Nepal, not only imports.

#### Approach to meet the demand up to 2020
1. **Complete ongoing projects quickly:** Upper Tamakoshi, Tanahu, Kulekhani III, Rasuwagadhi, Chameliya and private (IPP) projects, with a target schedule and priority in clearances.
2. **Develop storage and peaking RoR projects** (Budhigandaki, Tanahu, Dudhkoshi, Nalgad) to cover the dry season and the peak.
3. **Transmission and distribution:** Build lines on time (Hetauda-Dhalkebar-Duhabi 400 kV, the Dhalkebar-Muzaffarpur cross-border line) and reduce the system loss (about 25% at the time).
4. **Import and trade:** Import from India in the dry season and export in the wet season.
5. **Policy and finance:** Simplify licensing, offer a bankable PPA, invest through the Investment Board, and attract foreign investment.
6. **Demand-side management:** Efficient lamps, time-of-day tariffs, and a reduced industrial peak.
7. **Local participation:** Promote shares for local people and community projects to reduce delays.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What was the problem behind load shedding?
   A. Peak demand about 1,300-1,400 MW against dry-season supply of 400-500 MW
   B. Excess supply
   C. Only transmission
   D. No demand
   Answer: A. Dry-season supply was far below peak demand. (Key point: Gap)

2. What does a lasting end of load shedding need?
   A. Banning new loads
   B. Only import
   C. Closing industry
   D. Generation inside Nepal, not only imports
   Answer: D. Domestic generation is needed. (Key point: Lasting solution)

3. Why develop storage and peaking RoR projects?
   A. To cover dry season and peak
   B. To spill water
   C. To avoid transmission
   D. To reduce flood only
   Answer: A. They give dry-season energy and peak power. (Key point: Peaking storage)

## Related in Hydropower Engineering

- [Importance of hydropower development in Nepal](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aimportance-hydropower-nepal) — Hydropower Engineering, chapter 1
- [Hydropower Development Policy 2001 (2058 BS)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Ahdp-2001-objectives-features) — Hydropower Engineering, chapter 1, asked 4×
- [Institutions in Nepal's hydropower sector](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Ainstitutional-setup-hydropower) — Hydropower Engineering, chapter 1, asked 2×
- [Stages of hydropower development cycle](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Adev-cycle-stages) — Hydropower Engineering, chapter 2
- [Types of hydropower plants by head, turbine, load](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Ahydropower-plant-types-classification) — Hydropower Engineering, chapter 2
- [Load duration curve; diesel plant; ROR flow duration](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aload-duration-diesel-import-fdc) — Hydropower Engineering, chapter 3

## Related in other subjects

- [Demand of rural municipality, base period 3 years](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ademand-bk79) — Water Supply Engineering, chapter 3
- [Demand of village 2070 BS, base period 5 years](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ademand-c70) — Water Supply Engineering, chapter 3
- [Development of hydropower in Nepal](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Ahydro-development-nepal) — Power Plant Design, chapter 1
- [Average demand, village survey 2013, design 25 years](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ademand-c73) — Water Supply Engineering, chapter 3, asked 2×