# Installed capacity, energy and daily peaking reservoir (2079)

Hydropower Engineering · Chapter 3: Power and Energy Potential study

- Asked in: 2079 Baishakh, 2+2+2+2+4 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/ror-capacity-plant-factor-18cumec-peaking-79
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-3

## Question

A hydropower plant is planned to be designed in a Nepalese river, where mean monthly flows for a typical year are as follows.

| Month | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Q (m³/s) | 4.4 | 3.9 | 3.4 | 4.2 | 4.2 | 16.5 | 78.1 | 108.9 | 52.8 | 22.0 | 9.9 | 6.4 |

Other data: design discharge = 18 m³/s; full supply level = 2250 masl; turbine centerline = 1650 masl; diameter of 4 km long tunnel = 3 m, f = 0.014; diameter of 1 km long penstock = 2.2 m, f = 0.012; hydraulic efficiency = 95%, turbine efficiency = 93%, generator efficiency = 99%, transformer efficiency = 99%. Considering only the frictional loss,
(i) Compute the installed capacity, primary and secondary energy to be produced from the power plant assuming that 10% of the minimum monthly flow is to be released downstream. What is the plant factor?
(ii) The developer is interested in developing a daily peaking reservoir for 4 hours. What will be the capacity of the reservoir to satisfy the daily peaking requirement?

## Short answer

Installed capacity is 89.8 MW. Total annual energy is 447.7 GWh, with primary energy 136.5 GWh and secondary 311.2 GWh, giving a plant factor of 0.57. For 4-hour daily peaking, the required pondage volume is about 215,136 m³.

## Answer

#### Data and approach
Gross head $= 2250-1650 = 600$ m. Only friction loss is considered. Overall efficiency $\eta = 0.95\times0.93\times0.99\times0.99 = 0.8659$ (hydraulic × turbine × generator × transformer). Energy is computed month by month (730 h per month), with the friction loss recalculated for the flow used.

#### Head loss at design flow $Q_d = 18$ m³/s (Darcy-Weisbach)
Tunnel: $A=\frac{\pi}{4}(3)^2 = 7.069$ m², $V = 2.546$ m/s

$$
h_{f,t} = f\frac{L}{D}\frac{V^2}{2g} = 0.014\times\frac{4000}{3}\times\frac{2.546^2}{2\times9.81} = 6.17\ \text{m}
$$

Penstock: $A=\frac{\pi}{4}(2.2)^2 = 3.801$ m², $V = 4.735$ m/s

$$
h_{f,p} = 0.012\times\frac{1000}{2.2}\times\frac{4.735^2}{2\times9.81} = 6.23\ \text{m}
$$

Net head at $Q_d$: $H_n = 600-6.17-6.23 = 587.60$ m. (Loss varies as $Q^2$ for smaller flows.)

#### (i) Installed capacity, energy and plant factor
Environmental release $=10\%\times$ minimum monthly flow $=0.1\times3.4=0.34$ m³/s, so the flow available for power is $Q-0.34$.

$$
P = 9.81\,\eta\,H_n\,Q_d = 9.81\times0.8659\times587.60\times18 = 89,846\ \text{kW} = 89.85\ \text{MW}
$$

| Month | Q (m³/s) | Q − 0.1Qmin | Q used | Net head (m) | Power (MW) | Energy (GWh) |
|---|---|---|---|---|---|---|
| Jan | 4.4 | 4.06 | 4.06 | 599.4 | 20.67 | 15.09 |
| Feb | 3.9 | 3.56 | 3.56 | 599.5 | 18.13 | 13.23 |
| Mar | 3.4 | 3.06 | 3.06 | 599.6 | 15.59 | 11.38 |
| Apr | 4.2 | 3.86 | 3.86 | 599.4 | 19.65 | 14.35 |
| May | 4.2 | 3.86 | 3.86 | 599.4 | 19.65 | 14.35 |
| Jun | 16.5 | 16.16 | 16.16 | 590.0 | 80.99 | 59.12 |
| Jul | 78.1 | 77.76 | 18.00 | 587.6 | 89.85 | 65.59 |
| Aug | 108.9 | 108.56 | 18.00 | 587.6 | 89.85 | 65.59 |
| Sep | 52.8 | 52.46 | 18.00 | 587.6 | 89.85 | 65.59 |
| Oct | 22 | 21.66 | 18.00 | 587.6 | 89.85 | 65.59 |
| Nov | 9.9 | 9.56 | 9.56 | 596.5 | 48.44 | 35.36 |
| Dec | 6.4 | 6.06 | 6.06 | 598.6 | 30.81 | 22.49 |

- Total annual energy $= 447.73$ GWh
- **Primary (firm) energy**, from the minimum available flow $3.06$ m³/s (available in every month): $136.54$ GWh
- **Secondary energy** $=447.73-136.54 = 311.19$ GWh
- **Plant factor** $=\dfrac{447.73\times10^6}{89.85\times10^3\times8760} = 0.569$ (56.9%)

#### (ii) Reservoir for 4-hour daily peaking
In the driest month the available inflow is $Q_{in} = 3.06$ m³/s. The plant is to run for 4 hours a day at the design flow of 18 m³/s and store water in the other 20 hours. The daily inflow is 264,384 m³ and the peak use is $18\times4\times3600 = 259,200$ m³, which is slightly smaller, so 4-hour peaking at 18 m³/s is possible.

During the 4 peak hours the draw-down from the reservoir is

$$
V = (Q_d - Q_{in})\times t = (18-3.06)\times4\times3600 = 215,136\ \text{m}^3 \approx 2.15\times10^5\ \text{m}^3
$$

The same volume must be stored in the 20 off-peak hours ($3.06\times20\times3600 = 220,320$ m³ available), so it fills in time.

**Answer: P = 89.8 MW; total energy = 447.7 GWh; primary energy = 136.5 GWh; secondary energy = 311.2 GWh; plant factor = 0.57; pondage volume ≈ 215,136 m³ (≈ 2.15 × 10⁵ m³).**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. How is the net head at design flow found when only friction loss is considered?
   A. Gross head 600 m minus tunnel and penstock friction losses (Darcy-Weisbach), giving about 587.6 m
   B. Gross head only, 600 m
   C. Gross head plus friction loss
   D. Half of the gross head
   Answer: A. Net head = 600 - 6.17 - 6.23 = 587.6 m at Qd = 18 m3/s. (Key point: Gross and net head)

2. How is overall efficiency combined from the component efficiencies?
   A. Sum divided by 4
   B. Smallest of the four values
   C. Product: 0.95 x 0.93 x 0.99 x 0.99 = 0.866
   D. Sum minus 3
   Answer: C. Component efficiencies in series multiply. (Key point: Overall efficiency)

3. How does the environmental release change the flow available for power?
   A. Flow for power = Q - 0.1 x minimum monthly flow (0.34 m3/s)
   B. Flow for power = 0.9 Q in every month
   C. No change, the release comes from the spill
   D. Flow for power = Q - 10 m3/s
   Answer: A. Release is 10% of the minimum monthly flow, 0.1 x 3.4 = 0.34 m3/s, and is subtracted from each month. (Key point: Flow available for power)

4. How is the plant factor calculated?
   A. Installed capacity / annual energy
   B. Firm energy / total energy
   C. Annual energy / (installed capacity x 8760 h)
   D. Mean flow / design flow
   Answer: C. Plant factor is actual annual energy over the energy if run at full capacity all year, about 0.57. (Key point: Plant factor)

5. How is the reservoir volume for 4 hours of daily peaking found?
   A. (Qd - Q_in) x 4 x 3600 using the dry-month inflow, about 2.15 x 10^5 m3
   B. Qd x 24 x 3600
   C. Q_in x 20 x 3600 only, ignoring Qd
   D. Qd x 4 x 3600 without subtracting the inflow
   Answer: A. During the peak the plant draws design discharge while the river still supplies Q_in, so the pond supplies the difference. (Key point: Peaking pondage volume)

## Close variants set in other exams

- [Installed capacity, energy and daily peaking reservoir (2072)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-capacity-plant-factor-18cumec-peaking-72) — Hydropower Engineering, chapter 3, asked 2×

## Related in Hydropower Engineering

- [Full regulation: reservoir, capacity, annual energy](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Astorage-full-regulation-monthly-hydrograph) — Hydropower Engineering, chapter 3
- [RoR capacity, peaking capacity and benefit](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-three-sets-peaking-benefit) — Hydropower Engineering, chapter 3
- [RoR best installed capacity (USD 1200 million)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-usd-1200) — Hydropower Engineering, chapter 3
- [RoR best installed capacity (USD 2795 million)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-usd-2795) — Hydropower Engineering, chapter 3
- [RoR best installed capacity (NRs, 45 years)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-best-capacity-nrs-10-percent) — Hydropower Engineering, chapter 3
- [Peaking RoR: max power and wet/dry energy ratio](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Apeaking-ror-reservoir-250m-q25) — Hydropower Engineering, chapter 3

## Related in other subjects

- [Firm and secondary energy from average monthly flows](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Afirm-secondary-energy-2075) — Hydro Power, chapter 3
- [Best installed capacity at 10% interest](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Abest-installed-capacity-10pct) — Hydro Power, chapter 3
- [Best installed capacity at 12% interest](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Abest-installed-capacity-12pct) — Hydro Power, chapter 3