# Seepage expressions: no drain vs toe drain

Hydropower Engineering · Chapter 4: Headworks of Storage Plants

- Asked in: 2073 Shrawan, 2+3 marks
- Video: [Seepage though Earthen Dam || Soil Mechanics | Chapter 7 | Most important theory](https://www.youtube.com/watch?v=wmVYDaAoP7s) — Sudip Dhakal
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/seepage-expressions-without-drain-toe-drain
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-4

## Question

Write with neat sketches the expressions for computing seepage and the phreatic surface in earthen dams for two cases: homogeneous dam without drain and dam with toe drain.

## Short answer

For a homogeneous dam without drain, Casagrande’s method uses a basic parabola with focus at the downstream toe: q = k y₀, y₀ = √(h²+d²) – d, and an exit correction is needed. With a toe drain, the focus is at the drain’s upstream end, giving q = k y₀ with no exit correction and the line entering the drain horizontally.

## Answer

Seepage through a homogeneous earth dam on an impervious base is found by **Casagrande's** method, which treats the phreatic line as a **basic parabola** with its focus $F$ at the d/s toe (or at the start of the drain), based on Dupuit's assumption. Notation: $h$ = reservoir depth above the base, $b$ = horizontal projection of the wetted u/s slope, $B$ = base width, $\alpha$ = angle of the d/s face.

#### Case 1: Homogeneous dam without a drain
```text
       A'  entry corrected 0.3b
   h ~~~~\___  phreatic line (parabola)
        /     \____
       /  dam      \___ a (exit point on d/s face)
   ///////////////////F (toe) \\\
        |<----- d ------>|
```
- Horizontal distance from the corrected entry to the toe: $d=B-0.7b$.
- Basic parabola: $y_0=\sqrt{h^2+d^2}-d$ and $y=\sqrt{y_0^2+2y_0x}$, with $x$ from $F$.
- Seepage (per unit length): $q=k\,y_0$.
- Exit point on the d/s face (distance $a$ along the slope from the toe):
$$
a+\Delta a=\frac{y_0}{1-\cos\alpha},\qquad a=(1-C)(a+\Delta a)
$$
where $C=\Delta a/(a+\Delta a)$ is read from Casagrande's chart (0.36 at $30^\circ$, 0.26 at $90^\circ$, 0.10 at $150^\circ$, 0 at $180^\circ$).
- For $\alpha<30^\circ$, Schaffernak's formula is also used:
$$
q=k\,a\sin\alpha\tan\alpha,\qquad a=\frac{d}{\cos\alpha}-\sqrt{\frac{d^2}{\cos^2\alpha}-\frac{h^2}{\sin^2\alpha}}
$$

#### Case 2: Dam with a toe drain
```text
   h ~~~~\___  phreatic line
        /     \___
       /  dam      \___
   ///////////////[ toe drain ]\\\
        |<--- d --->|F (start of drain)
```
- The parabola is drawn with the focus at the **u/s end of the toe drain**, so $d=B-0.7b-\ell$ ($\ell$ = drain length).
- $y_0=\sqrt{h^2+d^2}-d$, $y=\sqrt{y_0^2+2y_0x}$ and $q=k\,y_0$.
- The line enters the drain nearly horizontally ($\alpha=180^\circ$, $C=0$), so no exit correction is required and the line meets the drain at $a=\dfrac{y_0}{1-\cos180^\circ}=\dfrac{y_0}{2}$ from the focus. The d/s face stays dry above the drain, which improves the stability of the d/s slope.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. In Casagrande's method, the seepage per unit length is
   A. q = k y0
   B. q = k h
   C. q = k d
   D. q = k y0^2
   Answer: A. q = k y0, where y0 is the focal ordinate of the basic parabola. (Key point: Seepage formula)

2. y0 is computed as
   A. sqrt(h^2 - d^2) + d
   B. h - d
   C. sqrt(h^2 + d^2) - d
   D. d^2/h
   Answer: C. y0 = sqrt(h^2 + d^2) - d, with d = B - 0.7b. (Key point: Basic parabola)

3. With a toe drain, the focus of the parabola is at
   A. The d/s toe
   B. The u/s end of the drain, so d = B - 0.7b - l
   C. The crest
   D. The entry point
   Answer: B. The focus moves to the start of the drain, reducing d by the drain length. (Key point: Focus with toe drain)

4. Why does a toe drain improve stability?
   A. It makes the line exit high on the slope
   B. It increases seepage
   C. The line enters the drain and the d/s face stays dry
   D. It removes the need for a core
   Answer: C. No exit correction is needed (C = 0) and the d/s face remains dry. (Key point: Benefit of toe drain)

## Related in Hydropower Engineering

- [Toe-drain earthen dam: discharge and phreatic line](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-toe-drain-2069) — Hydropower Engineering, chapter 4
- [Seepage and phreatic line: horizontal filter at toe](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aseepage-horizontal-filter-derivation) — Hydropower Engineering, chapter 4, asked 3×
- [Earth dam with drain pipe: phreatic coordinates](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-drain-pipe-phreatic) — Hydropower Engineering, chapter 4
- [Seepage line for 22 m high earthen dam](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-seepage-line-22m-45deg) — Hydropower Engineering, chapter 4
- [Seepage discharge through dam body (k = 1×10⁻⁶ m/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-seepage-gradient-figure-2072k) — Hydropower Engineering, chapter 4
- [Seepage through dam with central core (45 m dam)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-impervious-core-seepage-2075c) — Hydropower Engineering, chapter 4

## Related in other subjects

- [Steady 2D model: seepage under a dam](https://www.bctengineer.com/question.md?key=semester_8%2Fcomputational_techniques_in_civil_engineering%3Aseepage-under-dam-2d-model) — Computational Techniques in Civil Engineering, chapter 7, asked 3×
- [Earth dam with filter, seepage quantity](https://www.bctengineer.com/question.md?key=semester_4%2Fsoil_mechanics%3Aearth-dam-horizontal-filter-seepage) — Soil Mechanics, chapter 7
- [Stresses in gravity dam with drain holes](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Agravity-dam-stresses-figure) — Hydro Power, chapter 4