title: "Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s"
subject: "Hydropower Engineering"
chapter: 5
key: "semester_7/hydropower_engineering:settling-basin-60cumec-02mm-w15"
source: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-60cumec-02mm-w15
site: BCT Engineering
---

# Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s

Hydropower Engineering · Chapter 5: Headworks of Run-of- River (RoR) Plants

- Asked in: 2076 Chaitra, 4+4 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-60cumec-02mm-w15
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-5

## Question

Find out the dimension of a settling basin with turbulence flow for a high head hydropower plant, which utilizes a discharge of 60 m³/sec. The sediment particles coarser than 0.2 mm (fall velocity w = 1.5 cm/sec) have to be trapped in the basin. Draw plan and section showing major components and flushing arrangement, neat and proportionately.

## Short answer

Three chambers, each 17.0 m wide, 270 m long, and 6.0 m deep. Design velocity is 0.197 m/s; length accounts for turbulence using effective fall velocity w’ = 0.0044 m/s to trap particles coarser than 0.2 mm with given fall velocity 1.5 cm/s.

## Answer

**Given**: design discharge $Q=60.0$ m³/s; particles of size $d\ge 0.20$ mm to be trapped, fall velocity $w=1.50$ cm/s $=0.0150$ m/s (given). Turbulence is considered. (A fall velocity of 1.5 cm/s is lower than the usual value for 0.2 mm sand, so the basin comes out long; the given value is used.)

#### Step 1: Horizontal velocity (Camp)
For $0.1<d<1$ mm, $v=a\sqrt d$ with $a=44$ (v in cm/s, d in mm):
$$
v=44\sqrt{0.20}=19.68\ \text{cm/s}=0.1968\ \text{m/s}
$$
This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.

#### Step 2: Cross-section and width
Assume a flow depth $H=6.0$ m in the settling zone (sediment storage is extra).
$$
B=\frac{Q}{vH}=\frac{60.0}{0.1968\times6.0}=50.82\ \text{m}
$$
Provide $n=3$ chambers so that one can be flushed while the others work: $b=B/n=16.94$ m each, adopt 17.0 m.

#### Step 3: Length without turbulence
$$
L_0=\frac{vH}{w}=\frac{0.1968\times6.0}{0.0150}=78.7\ \text{m}
$$

#### Step 4: Effect of turbulence
Turbulence reduces the effective fall velocity: $w'=w-\alpha$, with $\alpha=0.132\,v/\sqrt{H}$.
$$
\begin{aligned}
\alpha&=\frac{0.132\times0.1968}{\sqrt{6.0}}=0.0106\ \text{m/s}\\
w'&=0.0150-0.0106=0.0044\ \text{m/s}\\
L&=\frac{vH}{w'}=\frac{0.1968\times6.0}{0.0044}=268.6\ \text{m}
\end{aligned}
$$

#### Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity $v$ | 0.197 m/s |
| Settling depth $H$ | 6.0 m (plus about 1.0 m sediment storage in the hopper) |
| Number of chambers | 3 |
| Width of each chamber | 17.0 m |
| Length of settling zone | 270 m |
| Length/width ratio | 15.9 |
| Inlet transition | gradual, with guide vanes (side slope not steeper than about 1:5) |

Total volume of water in the basin $\approx 3\times17\times270\times6=82620$ m³.

```text
PLAN (flushing gates at the downstream end)
          inlet        settling chambers      outlet
 canal   transition  +=================+   transition
 =====>  \         / |  chamber 1      | \         /===> to
         /  guide  \ +-----------------+ /  weir   \    headrace
 =====>  \  vanes  / |  chamber 2      | \         /
         /         \ +-----------------+ /         \
                     |  chamber 3      |
                     +=================+
  trash-                  |  |  flush gates
  rack                    v  v  --> flushing channel --> river
```

```text
LONGITUDINAL SECTION
 inlet          settling zone (depth H)      outlet
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~  WL
 \    --->   --->   --->   --->   --->   --->  |
  \  ______________________________________   | weir
   \/   sediment storage / hopper slope 1:30 \__|__ to headrace
          flush gate -> flushing channel -> river
```

**Flushing arrangement**: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is kept in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chambers continue to supply the plant.

**Answer**: 3 chambers, each about 17.0 m wide x 270 m long x 6.0 m deep (settling zone), with $v=0.197$ m/s.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What horizontal velocity is used for d = 0.20 mm (Camp: v = a sqrt(d), a = 44, v in cm/s, d in mm)?
   A. v = 44 sqrt(0.20) = 19.68 cm/s = 0.1968 m/s
   B. v = 44 x 0.20 = 8.8 cm/s = 0.088 m/s
   C. v = 44 sqrt(0.20) = 19.68 m/s
   D. v = 44/sqrt(0.20) = 98 cm/s = 0.98 m/s
   Answer: A. For 0.1 < d < 1 mm Camp gives v = a sqrt(d); the result must be converted from cm/s to m/s and lies in the 0.1-0.4 m/s range so deposits are not resuspended. (Key point: Camp horizontal velocity)

2. With H = 6.0 m and flow 60.0 m^3/s, what is the total width B and why are chambers provided?
   A. B = Q/v = 305 m; chambers are provided to reduce the length
   B. B = Q/(vH) = 50.82 m; 3 chambers so that one can be flushed while the others work
   C. B = Q/(wH) = 667 m; chambers are provided to increase velocity
   D. B = Q/(vH) = 50.82 m; chambers are provided only to reduce construction cost
   Answer: B. Continuity Q = vBH gives the width, and splitting the basin into chambers allows flushing one chamber without stopping the plant. (Key point: Width of basin)

3. How does turbulence change the settling length?
   A. It increases the effective fall velocity, so the length decreases below 78.7 m
   B. It does not change the length; only the width is increased
   C. It reduces the effective fall velocity (w' = w - 0.132 v/sqrt(H)), so the length increases from 78.7 m to about 268 m
   D. It adds to the horizontal velocity, so the width is reduced to B/2
   Answer: C. Turbulent eddies keep particles up, so effective fall velocity is w - alpha; since L = vH/w', a smaller w' gives a longer basin. (Key point: Effect of turbulence)

4. What are alpha, w' and the length L when turbulence is considered?
   A. alpha = 0.0106 m/s, w' = 0.0256 m/s, L = vH/w' = 46.1 m
   B. alpha = 0.0106 m/s, L = vH/alpha = 111 m
   C. No correction needed, L = vH/w = 78.7 m
   D. alpha = 0.0106 m/s, w' = 0.0044 m/s, L = vH/w' = 268.3 m (adopt about 270 m)
   Answer: D. alpha = 0.132 v/sqrt(H) is subtracted from w, giving w' and the longer length L = vH/w'. (Key point: Length with turbulence)

## Close variants set in other exams

- [Settling basin 50 m³/s, 0.2 mm](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-50cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Settling basin 25 m³/s, 0.2 mm](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-25cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Settling basin 40 m³/s, 0.15 mm](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-40cumec-015mm-w15) — Hydropower Engineering, chapter 5, asked 4×

## Related in Hydropower Engineering

- [Settling basin 60 m³/s, 0.15 mm, head 300 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-300m-015mm-turbulence) — Hydropower Engineering, chapter 5, asked 2×
- [Settling basin 60 m³/s, 0.15 mm, head 100 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-head-100m-015mm) — Hydropower Engineering, chapter 5
- [Continuous flushing settling basin, 95% efficiency](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-continuous-60cumec-velikanov) — Hydropower Engineering, chapter 5
- [Periodic settling basin with and without turbulence](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-periodic-5cumec-with-without-turbulence) — Hydropower Engineering, chapter 5
- [Settling basin 30 m³/s with Velikanov check](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-30cumec-02mm-velikanov) — Hydropower Engineering, chapter 5
- [Settling basin 6 m³/s, 0.25 mm, depth 3 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-6cumec-025mm-depth3m) — Hydropower Engineering, chapter 5

## Related in other subjects

- [Settling basin design for 0.2 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-2mm) — Hydro Power, chapter 5
- [Settling basin design for 0.15 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-15mm) — Hydro Power, chapter 5
- [Settling basin design for 0.25 mm sediment](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-25mm) — Hydro Power, chapter 5
- [Components of a medium head high discharge plant](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Amedium-head-high-discharge-components) — Power Plant Design, chapter 3, asked 2×