# Settling basin 6 m³/s, 0.25 mm, depth 3 m

Hydropower Engineering · Chapter 5: Headworks of Run-of- River (RoR) Plants

- Asked in: 2080 Bhadra, 7 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-6cumec-025mm-depth3m
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-5

## Question

Design a settling basin for a design discharge of 6 cumec. The basin is designed to remove particle size of 0.25 mm. If the depth of the basin is 3 m and settling velocity 2.5 cm/sec, find the dimensions of the basin considering turbulence.

## Short answer

Camp velocity is 44 sqrt(0.25)=0.220 m/s. For Q=6 m3/s and H=3 m total width is 9.09 m; provide two chambers 5 m wide. Turbulence reduces fall velocity to 0.0082 m/s, requiring length 80.2 m, adopt 85 m. Final: two 5 m x 85 m x 3 m chambers.

## Answer

**Given**: design discharge $Q=6.0$ m³/s; particles of size $d\ge 0.25$ mm to be trapped, fall velocity $w=2.50$ cm/s $=0.0250$ m/s (given). The depth of the basin is 3 m, and turbulence is considered.

#### Step 1: Horizontal velocity (Camp)
For $0.1<d<1$ mm, $v=a\sqrt d$ with $a=44$ (v in cm/s, d in mm):
$$
v=44\sqrt{0.25}=22.00\ \text{cm/s}=0.2200\ \text{m/s}
$$
This is within the usual 0.1-0.4 m/s range, so deposited sediment is not re-suspended.

#### Step 2: Cross-section and width
Take the flow depth $H=3.0$ m in the settling zone (given; sediment storage is extra).
$$
B=\frac{Q}{vH}=\frac{6.0}{0.2200\times3.0}=9.09\ \text{m}
$$
Provide $n=2$ chambers so that one can be flushed while the other works: $b=B/n=4.55$ m each, adopt 5.0 m.

#### Step 3: Length without turbulence
$$
L_0=\frac{vH}{w}=\frac{0.2200\times3.0}{0.0250}=26.4\ \text{m}
$$

#### Step 4: Effect of turbulence
Turbulence reduces the effective fall velocity: $w'=w-\alpha$, with $\alpha=0.132\,v/\sqrt{H}$.
$$
\begin{aligned}
\alpha&=\frac{0.132\times0.2200}{\sqrt{3.0}}=0.0168\ \text{m/s}\\
w'&=0.0250-0.0168=0.0082\ \text{m/s}\\
L&=\frac{vH}{w'}=\frac{0.2200\times3.0}{0.0082}=80.2\ \text{m}
\end{aligned}
$$

#### Adopted dimensions
| Item | Value |
|---|---|
| Flow velocity $v$ | 0.220 m/s |
| Settling depth $H$ | 3.0 m (plus about 1.0 m sediment storage in the hopper) |
| Number of chambers | 2 |
| Width of each chamber | 5.0 m |
| Length of settling zone | 85 m |
| Length/width ratio | 17.0 |
| Inlet transition | gradual, with guide vanes (side slope not steeper than about 1:5) |

Total volume of water in the basin $\approx 2550$ m³.

```text
PLAN (flushing gates at the downstream end)
          inlet        settling chambers      outlet
 canal   transition  +=================+   transition
 =====>  \         / |  chamber 1      | \         /===> to
         /  guide  \ +-----------------+ /  weir   \    headrace
 =====>  \  vanes  / |  chamber 2      | \         /
         /         \ +=================+ /         \
  trash-                  |  |  flush gates
  rack                    v  v  --> flushing channel --> river
```

```text
LONGITUDINAL SECTION
 inlet          settling zone (depth H)      outlet
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~  WL
 \    --->   --->   --->   --->   --->   --->  |
  \  ______________________________________   | weir
   \/   sediment storage / hopper slope 1:30 \__|__ to headrace
          flush gate -> flushing channel -> river
```

**Flushing arrangement**: the floor of each chamber slopes at about 1:30-1:50 to a longitudinal flushing channel with a flushing gate at the downstream end. A flushing velocity of at least 3 m/s is maintained in the channel. The chamber to be flushed is closed at the inlet, drained and flushed to the river, while the other chamber continues to supply the plant.

**Answer**: 2 chambers, each about 5.0 m wide x 85 m long x 3.0 m deep (settling zone), with $v=0.220$ m/s.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What horizontal velocity is used for the 0.25 mm particle?
   A. 44 x 0.25 = 11 cm/s
   B. 44 sqrt(0.25) = 22 cm/s = 0.22 m/s
   C. 44 sqrt(0.25) = 22 m/s
   D. 2.5 cm/s, equal to the fall velocity
   Answer: B. v = a sqrt(d) = 44 x 0.5 = 22 cm/s = 0.22 m/s. (Key point: Camp velocity for 0.25 mm)

2. What total width is needed for Q = 6 m^3/s at H = 3 m?
   A. B = Q/(wH) = 80 m
   B. B = Q/(vH) = 6/(0.22 x 3) = 9.09 m, split into 2 chambers of about 5 m
   C. B = vH/w = 26.4 m
   D. B = Q/v = 27.3 m
   Answer: B. Continuity gives B = Q/(vH) = 9.09 m; with two chambers b = 4.55 m, adopted 5.0 m. (Key point: Basin width)

3. How is the turbulence-reduced fall velocity found?
   A. w' = w + 0.132 v/sqrt(H) = 0.0418 m/s
   B. w' = w - 0.132 v/sqrt(H) = 0.025 - 0.0168 = 0.0082 m/s
   C. w' = w/lambda = 0.0167 m/s
   D. w' = w - v = negative, so no settling
   Answer: B. alpha = 0.132 x 0.22 / sqrt(3) = 0.0168 m/s is subtracted from w, leaving w' = 0.0082 m/s. (Key point: Turbulence correction alpha)

4. What are the lengths without and with turbulence?
   A. 26.4 m without, 80.2 m with
   B. 80.2 m without, 26.4 m with
   C. 26.4 m without, 26.4 m with
   D. 9.1 m without, 26.4 m with
   Answer: A. L0 = vH/w = 0.22 x 3/0.025 = 26.4 m; with w' = 0.0082, L = 0.66/0.0082 = 80.2 m, so turbulence about triples the length (85 m adopted). (Key point: Length without and with turbulence)

## Related in Hydropower Engineering

- [Periodic settling basin with and without turbulence](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-periodic-5cumec-with-without-turbulence) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Settling basin 25 m³/s, 0.2 mm](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-25cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Settling basin with Hazen coefficient and sediment depth](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-hazen-sediment-depth-5000ppm) — Hydropower Engineering, chapter 5
- [Settling basin 8 m³/s, 0.3 mm, 90% trap](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-8cumec-03mm-90-percent) — Hydropower Engineering, chapter 5, asked 2×
- [Settling basin 60 m³/s, 0.15 mm, head 300 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-300m-015mm-turbulence) — Hydropower Engineering, chapter 5, asked 2×

## Related in other subjects

- [Settling basin design for 0.25 mm sediment](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-25mm) — Hydro Power, chapter 5
- [Settling basin design for 0.2 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-2mm) — Hydro Power, chapter 5
- [Settling velocity of discrete particle 0.14 mm at 25°C](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ased-j66) — Water Supply Engineering, chapter 6, asked 2×
- [Settling basin design for 0.15 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-15mm) — Hydro Power, chapter 5