title: "Settling basin with Hazen coefficient and sediment depth"
subject: "Hydropower Engineering"
chapter: 5
key: "semester_7/hydropower_engineering:settling-basin-hazen-sediment-depth-5000ppm"
source: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-hazen-sediment-depth-5000ppm
site: BCT Engineering
---

# Settling basin with Hazen coefficient and sediment depth

Hydropower Engineering · Chapter 5: Headworks of Run-of- River (RoR) Plants

- Asked in: 2081 Baishakh, 8+2 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-hazen-sediment-depth-5000ppm
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-5

## Question

Design a settling basin for particle size = 6 mm, sp. gravity = 2.65, absolute viscosity = 1.34 gm/cm-s, temperature of water = 20°C, discharge = 12 m³/s. Calculate the depth of sediment assuming concentration is 5000 ppm. Assume 15% flushing discharge and performance coefficient of Hazen = 0.16. Draw a neat sketch of plan and section.

## Short answer

Stokes fall velocity is 0.2416 m/s; with 15% flushing flow Q'=13.8 m³/s, Hazen minimum area is 159 m². Adopt 8 m wide by 32 m long by 6 m deep plus a 1.0 m hopper, giving v=0.29 m/s and trap efficiency 96.6%; sediment depth is about 0.71 m per hour.

## Answer

**Given**: particle diameter $d=6$ mm $=0.6$ cm, $s=2.65$, $\mu=1.34$ g/cm·s, $T=20^\circ$C, $Q=12$ m³/s, concentration 5000 ppm (5 kg/m³), flushing discharge 15%, Hazen's performance coefficient $n=0.16$.

Assumptions: required trap efficiency $\eta=90\%$; sediment bulk density 1325 kg/m³ (packing factor 0.5 of 2650 kg/m³); the basin is flushed every 1 hour; horizontal velocity not more than 0.3 m/s; $L/B=4$.

#### Step 1: Fall velocity (Stokes, with the data given)
$$
w=\frac{g\,d^2(\rho_s-\rho)}{18\mu}=\frac{981\times0.6^2\times(2.65-1)}{18\times1.34}=24.16\ \text{cm/s}=0.2416\ \text{m/s}
$$

#### Step 2: Design flow with flushing
$$
Q'=1.15\times12=13.8\ \text{m}^3/\text{s}
$$

#### Step 3: Surface area (Hazen)
Hazen's relation for the fraction removed is $\;1-\eta=\left[1+n\dfrac{w\,A}{Q'}\right]^{-1/n}$, so
$$
A=\frac{Q'}{n\,w}\left[(1-\eta)^{-n}-1\right]=\frac{13.8}{0.16\times0.2416}\left[(0.1)^{-0.16}-1\right]=159.0\ \text{m}^2
$$
This is the minimum surface area.

#### Step 4: Cross-section and plan size
To stop the settled sediment from being scoured, the horizontal velocity is limited to 0.3 m/s:
$$
A_c=\frac{Q'}{v}=\frac{13.8}{0.3}=46\ \text{m}^2
$$
With $L/B=4$, adopt $B=8$ m, flow depth $H=6$ m and $L=32$ m:
$$
v=\frac{13.8}{8\times6}=0.29\ \text{m/s}\ (\text{OK}),\qquad A=8\times32=256\ \text{m}^2>159\ \text{m}^2\ (\text{OK})
$$
(A shallow 2 m deep basin of the Hazen area alone would give $v\approx1$ m/s, which is far too fast.)

Trap efficiency of the adopted basin:
$$
\eta=1-\left[1+0.16\times\frac{0.2416\times256}{13.8}\right]^{-1/0.16}=1-(1.717)^{-6.25}=96.6\%
$$

#### Step 5: Depth of sediment
Concentration $5000$ ppm $=5$ kg/m³. Sediment trapped per hour:
$$
M=\eta\,C\,Q'\,t=0.966\times5\times13.8\times3600=239930\ \text{kg}
$$
$$
V_s=\frac{M}{1325}=181.1\ \text{m}^3,\qquad h_s=\frac{V_s}{A}=\frac{181.1}{256}=0.71\ \text{m}
$$
So the sediment builds up to about 0.71 m depth in one hour. A hopper depth of about 1.0 m is therefore provided, and the basin must be flushed at least once every hour (or continuously, using the 15% flushing discharge).

```text
PLAN (flushing gate at the downstream end)
          inlet           settling basin            outlet
 canal   transition  +========================+   transition
 =====>  \  guide  / |                        | \  weir   /===> to
         /  vanes  \ |   8 m wide x 32 m long | /         \    headrace
                     +========================+
  trash-                          |  flush gate
  rack                            v  --> flushing channel --> river
```

```text
LONGITUDINAL SECTION
 inlet          settling zone (H = 6 m)       outlet
 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~  WL
 \    --->   --->   --->   --->   --->   --->  |
  \  ______________________________________   | weir
   \/   sediment hopper (about 1.0 m)        \__|__ to headrace
          flush gate -> flushing channel -> river
```

**Answer**: basin about 8 m wide x 32 m long x 6 m flow depth (plus a 1.0 m hopper), $v=0.29$ m/s, trap efficiency about 96.6%; the sediment depth is about 0.71 m per hour of operation.

Note: the 6 mm size and the viscosity of 1.34 g/cm·s are used exactly as given (water at 20°C actually has $\mu\approx0.01$ g/cm·s). Stokes' law is not strictly valid for such large particles, so the fall velocity is only indicative.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which expression gives the fall velocity of the particle?
   A. w = g d^2 (rho_s - rho) / (18 mu), giving about 24.2 cm/s
   B. w = 18 mu / (g d^2), giving 0.04 cm/s
   C. w = d sqrt(g), giving 4.3 cm/s
   D. w = Q/A
   Answer: A. Stokes' law with the given data gives w = 981 x 0.36 x 1.65 / (18 x 1.34) = 24.16 cm/s. (Key point: Stokes fall velocity)

2. What discharge is used in the Hazen area calculation?
   A. 12 m^3/s
   B. 13.8 m^3/s (12 + 15%)
   C. 10.2 m^3/s (12 - 15%)
   D. 15 m^3/s
   Answer: B. 15% flushing discharge is added: Q' = 1.15 x 12 = 13.8 m^3/s. (Key point: Design flow with flushing)

3. What does Hazen's performance coefficient n do in A = Q'/(n w) [(1 - eta)^(-n) - 1]?
   A. It accounts for non-ideal (turbulent, short-circuiting) settling, giving a larger area than the ideal Q/w
   B. It is the Manning roughness of the basin
   C. It is the fraction of flow used for flushing
   D. It is the sediment porosity
   Answer: A. n = 0.16 represents basin performance (poor flow conditions); as n goes to 0 the formula tends to the ideal result, and with n = 0.16 and eta = 90% A = 159 m^2. (Key point: Hazen relation)

4. How is the sediment depth in one hour found?
   A. Mass = eta C Q' t, volume = mass / bulk density, depth = volume / area = 1.06 m
   B. Depth = C x t / H
   C. Depth = Q' t / A = 312 m
   D. Depth = eta C / w = 0.19 m
   Answer: A. M = 0.9 x 5 x 13.8 x 3600 = 223,560 kg; V = M/1325 = 168.7 m^3; h = 168.7/159 = 1.06 m. (Key point: Depth of sediment)

## Related in Hydropower Engineering

- [Settling basin 6 m³/s, 0.25 mm, depth 3 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-6cumec-025mm-depth3m) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Single chamber settling basin design (15 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-single-chamber-15cumec) — Hydropower Engineering, chapter 5
- [Settling basin 8 m³/s, 0.3 mm, 90% trap](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-8cumec-03mm-90-percent) — Hydropower Engineering, chapter 5, asked 2×
- [Settling basin 60 m³/s, 0.15 mm, head 300 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-300m-015mm-turbulence) — Hydropower Engineering, chapter 5, asked 2×
- [Settling basin 60 m³/s, 0.15 mm, head 100 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-head-100m-015mm) — Hydropower Engineering, chapter 5

## Related in other subjects

- [Settling basin design for 0.25 mm sediment](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-25mm) — Hydro Power, chapter 5
- [Settling velocity of silica particle 0.02 cm at 20°C](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ased-c69) — Water Supply Engineering, chapter 6
- [Settling basin design for 0.2 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-2mm) — Hydro Power, chapter 5
- [Settling basin design for 0.15 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-15mm) — Hydro Power, chapter 5