# Single chamber settling basin design (15 m³/s)

Hydropower Engineering · Chapter 5: Headworks of Run-of- River (RoR) Plants

- Asked in: 2082 Bhadra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/settling-basin-single-chamber-15cumec
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-5

## Question

Design a single chamber settling basin using the following data: design discharge = 15 m³/sec; particle size to settle ≥ 0.2 mm; particle fall velocity = 0.02 m/sec; factor of safety for basin area = 1.5; length to breadth ratio = 8; sediment concentration = 1 kg/m³; density of sediment particles = 2,500 kg/m³; settling time of sediment particles = 8 hours; sediment packing factor = 0.5; additional discharge for flushing = 10%.

## Short answer

Use design flow 16.5 m3/s. Basin area = 1.5 x 16.5 / 0.02 = 1237.5 m2; with L/B=8 adopt 13 m x 104 m. Depth 4.5 m gives velocity 0.282 m/s. Sediment per 8-h cycle is 380.2 m3, so provide 0.5 m storage.

## Answer

**Given**: $Q=15$ m³/s, particles $\ge0.2$ mm, $w=0.02$ m/s, factor of safety for area $=1.5$, $L/B=8$, sediment concentration $C=1$ kg/m³, particle density 2500 kg/m³, flushing interval 8 h, packing factor 0.5, additional flushing discharge 10%.

#### Step 1: Design flow
$$
Q'=1.10\times15=16.5\ \text{m}^3/\text{s}
$$

#### Step 2: Surface area of the basin
For a particle to settle, the surface area must satisfy $A\ge Q/w$. With the factor of safety:
$$
A=\frac{FS\times Q'}{w}=\frac{1.5\times16.5}{0.02}=1237.5\ \text{m}^2
$$

#### Step 3: Width and length ($L/B=8$)
$$
B=\sqrt{\frac{A}{8}}=\sqrt{\frac{1237.5}{8}}=12.44\ \text{m},\qquad L=8B=99.5\ \text{m}
$$
Adopt $B=13$ m and $L=104$ m ($A=1352$ m²).

#### Step 4: Depth of flow
Limit the horizontal velocity to about 0.3 m/s. Take the flow depth $H=4.5$ m:
$$
v=\frac{Q'}{BH}=\frac{16.5}{13\times4.5}=0.282\ \text{m/s}<0.3\ \text{m/s}\quad\text{(OK)}
$$

#### Step 5: Sediment storage (flushing every 8 h)
$$
\text{Mass of sediment}=C\,Q'\,t=1\times16.5\times(8\times3600)=475200\ \text{kg}
$$
$$
\text{Volume of deposit}=\frac{\text{mass}}{\rho_s\times p}=\frac{475200}{2500\times0.5}=380.2\ \text{m}^3
$$
$$
\text{Depth of deposit}=\frac{380.2}{1352}=0.28\ \text{m}\ \Rightarrow\ \text{provide }0.5\ \text{m storage}
$$
(All the sediment entering is assumed to be trapped, which is conservative.)

#### Step 6: Overall dimensions
| Item | Value |
|---|---|
| Length of settling zone | 104 m |
| Width | 13 m |
| Flow depth | 4.5 m |
| Sediment storage | 0.5 m (hopper with 1:30 slope to the flushing channel) |
| Free board | 0.5 m |
| Total depth at the upstream end | about 5.5 m |

```text
PLAN (single chamber, flushing gate at the downstream end)
          inlet           settling chamber          outlet
 canal   transition  +========================+   transition
 =====>  \  guide  / |                        | \  weir   /===> to
         /  vanes  \ |  13 m wide x 104 m long| /         \    headrace
                     +========================+
  trash-                          |  flush gate
  rack                            v  --> flushing channel --> river
```

**Answer**: a single chamber of about 13 m x 104 m, with a flow depth of 4.5 m ($v=0.282$ m/s) and 0.5 m of sediment storage, flushed every 8 hours (deposit of 380.2 m³ per cycle).

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What design flow is used for the single-chamber basin?
   A. Q' = 15 m^3/s only
   B. Q' = 1.10 x 15 = 16.5 m^3/s (10% extra for flushing)
   C. Q' = 15/1.10 = 13.6 m^3/s
   D. Q' = 15 + 1.5 x 15 = 37.5 m^3/s
   Answer: B. The additional flushing discharge of 10% is added to the plant discharge. (Key point: Design flow with flushing)

2. How is the surface area of the basin found?
   A. A = Q'/w = 825 m^2, ignoring the safety factor
   B. A = FS x Q'/v = 1.5 x 16.5/0.3 = 82.5 m^2
   C. A = FS x Q'/w = 1.5 x 16.5/0.02 = 1237.5 m^2
   D. A = FS x w/Q' = 0.0018 m^2
   Answer: C. A particle settles if surface area is at least Q/w; the factor of safety increases it. (Key point: Surface area)

3. With L/B = 8 and A = 1237.5 m^2, what are B and L?
   A. B = A/8 = 154.7 m and L = 8B
   B. B = sqrt(A) x 8 = 281 m and L = B/8
   C. B = 8L = 99.5 m and L = 12.44 m
   D. B = sqrt(A/8) = 12.44 m and L = 8B = 99.5 m
   Answer: D. Since A = B x L = 8B^2, B = sqrt(A/8) and L = 8B. (Key point: Width and length)

4. How much sediment deposits in the 8 h flushing interval (C = 1 kg/m^3, packing factor 0.5, density 2500 kg/m^3)?
   A. Mass = C Q' t = 475200 kg; volume = mass/(2500 x 0.5) = 380.2 m^3
   B. Volume = 475200/2500 = 190.1 m^3, ignoring the packing factor
   C. Volume = 475200 x 0.5/2500 = 95.0 m^3
   D. Volume = 475200 x 2500 x 0.5 m^3
   Answer: A. Deposited sediment is less dense than solid grains, so the solid volume is divided by the packing factor to get the deposit volume. (Key point: Sediment storage)

## Related in Hydropower Engineering

- [Settling basin 60 m³/s, 0.15 mm, head 300 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-300m-015mm-turbulence) — Hydropower Engineering, chapter 5, asked 2×
- [Settling basin with Hazen coefficient and sediment depth](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-hazen-sediment-depth-5000ppm) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.15 mm, head 100 m](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-head-100m-015mm) — Hydropower Engineering, chapter 5
- [Settling basin 40 m³/s, 0.15 mm](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-40cumec-015mm-w15) — Hydropower Engineering, chapter 5, asked 4×
- [Desander design, two basins (16 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Adesander-16cumec-two-basins) — Hydropower Engineering, chapter 5
- [Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/s](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Asettling-basin-60cumec-02mm-w15) — Hydropower Engineering, chapter 5, asked 4×

## Related in other subjects

- [Settling basin design for 0.25 mm sediment](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-25mm) — Hydro Power, chapter 5
- [Settling velocity of silica particle 0.02 cm at 20°C](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ased-c69) — Water Supply Engineering, chapter 6
- [Settling basin design for 0.15 mm particles](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Asettling-basin-design-0-15mm) — Hydro Power, chapter 5
- [Settling tank 20 m x 2.5 m; velocity for 0.02 mm](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Ased-b66) — Water Supply Engineering, chapter 6, asked 2×