# Discharge through chute spillway ogee crest

Hydropower Engineering · Chapter 4: Headworks of Storage Plants

- Asked in: 2079 Baishakh, 4 marks
- Video: [Hydraulic Structures 15CV832 - Problems on Spillways](https://www.youtube.com/watch?v=FsjA3TThoGk) — sumanth Alekkady
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/hydropower_engineering/spillway-chute-discharge-ogee-250m
- Whole chapter: https://www.bctengineer.com/md/semester_7/hydropower_engineering/chapter-4

## Question

Determine the discharge through a chute spillway of 250.00 m long ogee crest, if the height of the spillway crest above the u/s approach channel is 10.50 m, the width of the approach channel is 2500 m, and the head over the crest is 4.50 m. Take $C_d = 0.85$.

## Short answer

Discharge over the ogee crest is computed as Q = (2/3) Cd sqrt(2g) L H^(3/2). With Cd=0.85, L=250 m, H=4.5 m, the discharge is approximately 5990 m³/s.

## Answer

**Given**: crest length $L=250$ m, head $H=4.5$ m, crest height above the approach channel $P=10.5$ m, approach channel width 2500 m, $C_d=0.85$.

#### Discharge over the ogee crest
$$
Q=\frac{2}{3}C_d\sqrt{2g}\,L\,H^{3/2}
$$
$$
\begin{aligned}
Q&=\frac{2}{3}(0.85)(4.429)(250)(4.5)^{3/2}\\
&=627.50\times 9.546 = 5990\ \text{m}^3/\text{s}
\end{aligned}
$$

#### Velocity of approach check
Approach channel depth $=P+H=10.5+4.5=15$ m, so area $=2500\times15=37{,}500$ m².
$$
V_a=\frac{5990}{37500}=0.160\ \text{m/s},\qquad h_a=\frac{V_a^2}{2g}=0.0013\ \text{m}
$$
This is only 0.03% of $H$, so its effect is negligible. Including it ($H_e=H+h_a$, iterated) gives $Q=5993$ m³/s, the same to three significant figures.

**Answer**: discharge through the spillway $\approx$ **5990 m³/s**.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which expression gives the discharge?
   A. Q = (2/3) Cd sqrt(2g) L H^(3/2)
   B. Q = Cd L H
   C. Q = Cd L H^2
   D. Q = Cd sqrt(2g) H
   Answer: A. Weir flow over a crest of length L under head H follows the 3/2 power law. (Key point: Discharge formula)

2. Why can velocity of approach be neglected?
   A. Approach area is huge (2500 x 15 m), so Va = 0.16 m/s and ha is only 0.0013 m
   B. Approach velocity is zero by definition
   C. The crest is too long
   D. Cd already includes losses of 50%
   Answer: A. ha is 0.03% of H, so it hardly changes Q. (Key point: Velocity of approach)

3. What discharge results?
   A. About 5990 m3/s
   B. About 599 m3/s
   C. About 59,900 m3/s
   D. About 1500 m3/s
   Answer: A. Q = 627.5 x 4.5^1.5 = 5990 m3/s. (Key point: Result)

## Related in Hydropower Engineering

- [Phreatic line and discharge (crest 300 masl)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-phreatic-line-2079-baishakh) — Hydropower Engineering, chapter 4, asked 2×
- [Spillway need; chute, shaft; ski-jump conditions](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aspillway-chute-shaft-skijump-conditions) — Hydropower Engineering, chapter 4
- [Seepage discharge through dam body (k = 1×10⁻⁶ m/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aearthen-dam-seepage-gradient-figure-2072k) — Hydropower Engineering, chapter 4
- [Spillway purposes and ogee advantages](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aspillway-purposes-ogee-advantages) — Hydropower Engineering, chapter 4
- [Types of spillway crest gates](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aspillway-crest-gate-types) — Hydropower Engineering, chapter 4, asked 2×
- [Francis runner design (40 m head, 10 m³/s)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Afrancis-turbine-velocity-triangle-40m) — Hydropower Engineering, chapter 7

## Related in other subjects

- [Spillway model height, head and flow](https://www.bctengineer.com/question.md?key=semester_3%2Ffluid_mechanics%3Aspillway-model-height-head-flow) — Fluid Mechanics, chapter 10
- [Reservoir routing through spillway, 6-hr inflow](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Areservoir-routing-spillway-6hr) — Engineering Hydrology, chapter 7
- [Discharge over overflow spillway](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Aoverflow-spillway-discharge) — Hydro Power, chapter 6
- [Spillway classification and ogee spillway](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Aspillway-classification-ogee) — Hydro Power, chapter 6, asked 2×