---
title: "Case study: Nepal Electricity Authority / Telecom"
subject: "Organization and Management"
chapter: 9
key: "semester_7/organization_and_management:case-study-nea-nt"
source: https://www.bctengineer.com/q/semester_7/organization_and_management/case-study-nea-nt
site: BCT Engineering
---

# Case study: Nepal Electricity Authority / Telecom

Organization and Management · Chapter 9: Management Information System

- Asked in: 2072 Chaitra, 8 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/organization_and_management/case-study-nea-nt
- Whole chapter: https://www.bctengineer.com/md/semester_7/organization_and_management/chapter-9

## Question

If you are asked to prepare the case study considering the planning horizon, leadership, motivation and human resource development for either Nepal Electricity Authority or Nepal Telecom to improve the existing performance of these institutions, how do you prepare the case study following its structure?

## Short answer

Structure the case study on Nepal Electricity Authority with: title and introduction; background; problem statement on high losses, delays, low motivation; objectives; methodology using interviews and reports; analysis of planning horizon (SWOT, gap), leadership (Kulman Ghising example), motivation (Maslow, Herzberg), HRD; findings; recommendations like fixed-tenure leadership, performance incentives, loss reduction; and implementation plan with monitoring indicators.

## Answer

I would choose **Nepal Electricity Authority (NEA)**. A case study is prepared in a structured sequence, as below.

#### Structure of the case study
**1. Title and introduction**
"Improving performance of Nepal Electricity Authority: planning, leadership, motivation and HR development." State the purpose, scope and importance of NEA as a state-owned utility, established in 2042 BS (1985) under the NEA Act, which generates, transmits and distributes electricity in Nepal.

**2. Background of the organization**
History, mission, structure (generation, transmission and distribution directorates), number of employees, customers, installed capacity, finances, and main issues such as system loss, tariffs, financial losses, project delays and import/export of power.

**3. Statement of the problem**
Selected issues: high technical and non-technical losses, delays and cost overruns in projects, weak maintenance, the financial burden of debt and power purchase agreements, frequent outages in some places, political interference in appointments, and low staff motivation.

**4. Objectives of the study**
To analyse four areas (planning horizon, leadership, motivation, human resource development) and recommend improvements.

**5. Methodology and data collection**
Primary data: interviews with managers, engineers, linemen and consumers; questionnaires; field observation. Secondary data: NEA annual reports ("A Year in Review"), Ministry of Energy documents, Electricity Regulatory Commission reports, previous research.

**6. Analysis, area by area**
- **Planning horizon:** Compare short-term (annual), medium-term and long-term (20-year) plans; check the demand forecast, project readiness, transmission-generation balance and risk of delays; apply SWOT and gap analysis.
- **Leadership:** Style of top management (political appointment, tenure instability), decision speed, vision, accountability; Kulman Ghising's period as an example of performance-based leadership.
- **Motivation:** Salary, promotion, working conditions of linemen, safety, recognition, union issues; use Maslow and Herzberg to analyse.
- **Human resource development:** Training, career path, technical skill upgrading, succession planning, brain drain.

**7. Findings**
Strengths, weaknesses, opportunities (hydropower, export to India/Bangladesh, smart grid) and threats (political influence, competition from private producers, climate and demand).

**8. Alternatives and recommendations**
- Fixed-tenure professional leadership; performance contract.
- Rolling long-term plan linked with the budget and a realistic project schedule.
- Performance-linked incentives, safety and recognition schemes.
- Training plan, succession planning and technology adoption (SCADA, smart meters).
- Loss reduction targets with monitoring.

**9. Implementation plan and conclusion**
Timeline, responsible units, resources, monitoring indicators (system loss %, outage hours, customer satisfaction) and a short conclusion.

**10. References and appendices.**

```text
Intro -> Background -> Problem -> Objectives
 -> Method -> Analysis -> Findings -> Recommendations
```

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. In the answer's case study structure, which sequence of sections is correct?
   A. Introduction, Background, Problem statement, Objectives, Methodology, Analysis, Findings, Recommendations
   B. Introduction, Analysis, Background, Methodology, Findings, Objectives, Recommendations
   C. Background, Recommendations, Problem statement, Methodology, Analysis, Objectives, Findings
   D. Introduction, Objectives, Recommendations, Background, Analysis, Problem statement, Findings
   Answer: A. The case study moves from introduction and background to the problem, objectives and method, then analysis, findings and recommendations. (Key point: Order of case study structure)

2. Which four areas does the NEA case study objective say must be analysed?
   A. Marketing, finance, production and purchasing
   B. Planning horizon, leadership, motivation and human resource development
   C. Planning horizon, leadership, budgeting and auditing
   D. Organizing, staffing, controlling and marketing
   Answer: B. The question and the objectives section focus on planning horizon, leadership, motivation and HR development. (Key point: Four areas to analyse)

3. Which of the following is SECONDARY data in the NEA case study methodology?
   A. Interviews with linemen
   B. Questionnaire to consumers
   C. NEA annual report 'A Year in Review'
   D. Field observation of substations
   Answer: C. Secondary data comes from existing documents such as annual reports; interviews, questionnaires and observation are primary data. (Key point: Data collection)

4. Which theories does the answer suggest for analysing staff motivation at NEA?
   A. Maslow and Herzberg
   B. Taylor and Fayol
   C. Theory X only
   D. Porter's five forces and BCG matrix
   Answer: A. Motivation (salary, promotion, safety, recognition) is analysed with Maslow's hierarchy and Herzberg's two-factor theory. (Key point: Motivation analysis theories)

5. Which recommendation addresses NEA's leadership problem of political appointment and tenure instability?
   A. Smart meters and SCADA
   B. Fixed-tenure professional leadership with a performance contract
   C. Raising electricity tariffs
   D. Reducing the number of directorates
   Answer: B. Fixed tenure and performance contracts reduce political interference and make leaders accountable. (Key point: Leadership recommendation)

## Related in Organization and Management

- [Most efficient leadership style in Nepal](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Aleadership-style-nepal) — Organization and Management, chapter 8
- [Objectives of case study](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Acase-study-objectives) — Organization and Management, chapter 9, asked 5×
- [Human need and Herzberg's hygiene theory](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Aherzberg-human-need) — Organization and Management, chapter 8, asked 2×
- [Motivation/needs and Maslow's hierarchy](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Amaslow-hierarchy) — Organization and Management, chapter 8, asked 2×
- [Recommendations to improve your college](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Acollege-improvement-recommendations) — Organization and Management, chapter 9
- [Motivation and Herzberg's hygiene theory](https://www.bctengineer.com/question.md?key=semester_7%2Forganization_and_management%3Aherzberg-hygiene) — Organization and Management, chapter 8

## Related in other subjects

- [Case study: new system vs existing (cost, manpower)](https://www.bctengineer.com/question.md?key=semester_5%2Finstrumentation_ii%3Acs-cost-manpower-automation) — Instrumentation II, chapter 10, asked 4×
- [Case study: existing vs proposed system](https://www.bctengineer.com/question.md?key=semester_5%2Finstrumentation_ii%3Acs-2074asoj) — Instrumentation II, chapter 10
- [Case study: feasibility, drawbacks, convincing](https://www.bctengineer.com/question.md?key=semester_5%2Finstrumentation_ii%3Acs-2072kartik-feasibility) — Instrumentation II, chapter 10
- [Short note: Telecom development in Nepal since 1913](https://www.bctengineer.com/question.md?key=semester_8%2Ftelecommunications%3Ashort-note-nepal-telecom-development) — Telecommunications, chapter 1
