- Asked in: 2066 Bhadra, 2+6 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/transportation_engineering_ii/intersection-control-methods-webster-400-300
- Whole chapter: https://www.bctengineer.com/md/semester_7/transportation_engineering_ii/chapter-1

## Question

What are different methods of traffic control at an intersection? The average normal flow of traffic on cross roads A and B during design period are 400 and 300 PCU per hour; the saturation flow values on these roads are estimated as 1450 and 1150 PCU per hour respectively. The all-red time required for pedestrian crossing is 12 sec. Design two phase traffic signal by Webster's method.

## Short answer

Methods include signs, channelization, roundabouts, signals, and grade separation. For flows 400 and 300 PCU/h, saturations 1450 and 1150 PCU/h, all-red 12 s, Webster gives optimum cycle 65 s with phase greens 25 s and 24 s and 2 s amber each.

## Answer

#### Methods of traffic control at an intersection
1. **Uncontrolled (priority by rules):** drivers give way to the vehicle on the right or on the main road; suitable for very low volume.
2. **Traffic signs and markings:** STOP and GIVE WAY signs, with stop lines; the minor road gives way to the major road (IRC:67, IRC:35).
3. **Channelisation:** islands and markings guide the movements (IRC:SP:41).
4. **Rotary (roundabout):** one-way circulation, no signals (IRC:65).
5. **Traffic signals:** fixed-time, vehicle-actuated or area-coordinated (IRC:93).
6. **Police control** by hand signals at peak times or special events.
7. **Grade separation:** flyover, underpass or interchange for very high volume.

#### Design of a two-phase signal by Webster's method
Data: roads A and B carry 400 and 300 PCU/h; saturation flows 1450 and 1150 PCU/h; all-red time for pedestrians $R$ = 12 s per cycle.

#### Step 1: Flow ratios
Flow ratio $y = q/s$ for each approach; the larger value in a phase is the critical one.

| Phase | Approach | q | s | y = q/s |
|---|---|---|---|---|
| Phase 1 | Road A | 400 | 1450 | 0.276 |
| Phase 2 | Road B | 300 | 1150 | 0.261 |

$$
Y = 0.276 + 0.261 = 0.537
$$

#### Step 2: Lost time

An amber of 2 s per phase is assumed and taken as the lost time of that phase; the all-red time $R$ = 12 s is also lost.

$$
L = 2 + 2 + 12 = 16.0\ \text{s}
$$

#### Step 3: Optimum cycle time (Webster)

$$
C_0 = \frac{1.5L + 5}{1 - Y} = \frac{1.5(16.0) + 5}{1 - 0.537} = 62.6\ \text{s}
$$

Adopt **C = 65 s**.

#### Step 4: Green times

Total effective green $= C - L = 65 - 16.0 = 49.0$ s, divided in proportion to $y$:

$$
g_{1} = \frac{y_1}{Y}(C-L) = \frac{0.276}{0.537}(49.0) = 25.2\ \text{s}
$$

$$
g_{2} = \frac{y_2}{Y}(C-L) = \frac{0.261}{0.537}(49.0) = 23.8\ \text{s}
$$

Because the whole amber is counted as lost time, the displayed green equals the effective green (so that $\sum G + \sum I + R = C$):

| Phase | Effective g (s) | Green G (s) | Amber (s) |
|---|---|---|---|
| Phase 1 | 25.2 | 25 | 2 |
| Phase 2 | 23.8 | 24 | 2 |

Check: 25 + 2 + 24 + 2 + 12 = 65 s.

#### Phase diagram

```text
|    P1 green 25    | A2|   P2 green 24    | A2|   R 12  |
```

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. In Webster's method, what is the flow ratio y of an approach and how is Y obtained here?
   A. y = s/q; Y is the larger of the two
   B. y = q/s; Y is the sum of the critical y values of the phases (0.276 + 0.261 = 0.537)
   C. y = q x s; Y is the average of the phases
   D. y = q/s; Y is the difference of the two phases
   Answer: B. y = q/s for each phase's critical approach, and Y is their sum, 0.537. (Key point: Flow ratio and critical value)

2. How was the total lost time L = 16 s obtained?
   A. 2 s lost per phase for two phases plus 12 s all-red for pedestrians
   B. 12 s per phase for two phases
   C. Only the 12 s all-red time
   D. 2 s amber only, no all-red
   Answer: A. L = (0+2) + (0+2) + 12 = 16 s, i.e. 2 s per phase plus the 12 s pedestrian all-red. (Key point: Lost time)

3. Which formula gives Webster's optimum cycle time?
   A. C0 = (1.5L + 5)/(1 - Y)
   B. C0 = (L + 5)/(1 + Y)
   C. C0 = 1.5L/Y
   D. C0 = (1.5L - 5)/Y
   Answer: A. Webster's formula is C0 = (1.5L + 5)/(1 - Y), giving 62.6 s here, adopted as 65 s. (Key point: Optimum cycle time)

4. How is the effective green (C - L = 49 s) divided between phases?
   A. Equally between phases
   B. In proportion to the flow ratios y/Y
   C. In proportion to saturation flows only
   D. All to the road with the higher volume
   Answer: B. g = (y/Y)(C - L), giving about 25.2 s for Road A and 23.8 s for Road B. (Key point: Green time split)

5. Which method of intersection control is suitable for very high volume and removes crossing conflicts?
   A. Police control
   B. Channelisation
   C. Grade separation
   D. Uncontrolled give-way rule
   Answer: C. Flyovers, underpasses or interchanges are used for very high volumes because they remove crossing at the same level. (Key point: Control methods)

## Close variants set in other exams

- [Webster signal: roads H and F, 3 s and 4 s headways](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Awebster-two-phase-h-f-400) — Transportation Engineering II, chapter 1, asked 2×

## Related in Transportation Engineering II

- [Two-phase signal: 400 and 250 PCU/hr, 7 m roads](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Awebster-two-phase-400-250-width) — Transportation Engineering II, chapter 1
- [Webster signal: 450 and 350 PCU/hr, all-red 15 s](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Awebster-two-phase-450-350-pcu) — Transportation Engineering II, chapter 1
- [Webster two-phase signal with saturation headways](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Awebster-two-phase-four-legged-table) — Transportation Engineering II, chapter 1
- [Signal design: roads X 15 m and Y 10.5 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-design-roads-x-15m-y) — Transportation Engineering II, chapter 1
- [Signal timing: roads A 15 m and B 12 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-15m-b) — Transportation Engineering II, chapter 1, asked 2×
- [Signal timing: roads A 15 m and B 7 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-15m-7m) — Transportation Engineering II, chapter 1