# Signal timing: Road 1 14 m, Road 2 7 m

Transportation Engineering II · Chapter 1: Traffic Engineering

- Asked in: 2081 Bhadra, 8 marks
- Video: [transportation engineering 1  module 5  part 2  signal design by webster's method](https://www.youtube.com/watch?v=H7-pS6ONqik) — Domicile  Designs
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/transportation_engineering_ii/signal-webster-road1-14m-road2-7m
- Whole chapter: https://www.bctengineer.com/md/semester_7/transportation_engineering_ii/chapter-1

## Question

At a right-angled intersection of two roads, Road 1 has four lanes with a total width of 14m and Road 2 has two lanes with a total width of 7m. The volume of traffic approaching the intersection during the design hour are 850 and 750 PCU/hr on the two approaches of Road 1 and 200 and 250 PCU/hr on the two approaches of Road 2. Take saturation flow of each direction of road 1 and 2 as 3675 PCU/hr and 1890 PCU/hr respectively. Amber time 3 sec, lost time 2 sec per phase for both the roads.

## Short answer

Using Webster's method, critical flow ratios 0.231 (Road1) and0.132 (Road2), sum Y=0.364, total lost time10 s. Optimum cycle35 s; displayed green: Road1=18 s, Road2=11 s, amber3 s each.

## Answer

Road 1 and Road 2 each run in one phase, so this is a two-phase signal. The design hour flows of the two approaches of each road are given and the saturation flow is the same for both directions of a road (3675 and 1890 PCU/h).


#### Step 1: Flow ratios
Flow ratio $y = q/s$ for each approach; the larger value in a phase is the critical one.

| Phase | Approach | q | s | y = q/s |
|---|---|---|---|---|
| Phase 1 | Road 1 (850) | 850 | 3675 | 0.231 (critical) |
| Phase 1 | Road 1 (750) | 750 | 3675 | 0.204 |
| Phase 2 | Road 2 (200) | 200 | 1890 | 0.106 |
| Phase 2 | Road 2 (250) | 250 | 1890 | 0.132 (critical) |

$$
Y = 0.231 + 0.132 = 0.364
$$

#### Step 2: Lost time

Lost time per phase = start-up lost time 2 s + amber 3 s = 5 s; no all-red time is given.

$$
L = (2.0+3.0) + (2.0+3.0) = 10.0\ \text{s}
$$

#### Step 3: Optimum cycle time (Webster)

$$
C_0 = \frac{1.5L + 5}{1 - Y} = \frac{1.5(10.0) + 5}{1 - 0.364} = 31.4\ \text{s}
$$

Adopt **C = 35 s**.

#### Step 4: Green times

Total effective green $= C - L = 35 - 10.0 = 25.0$ s, divided in proportion to $y$:

$$
g_{1} = \frac{y}{Y}(C-L) = \frac{0.231}{0.364}(25.0) = 15.9\ \text{s}
$$

$$
g_{2} = \frac{y}{Y}(C-L) = \frac{0.132}{0.364}(25.0) = 9.1\ \text{s}
$$

Displayed green $G = g + $ start-up loss (so that $\sum G + \sum I + R = C$):

| Phase | Effective g (s) | Start-up loss (s) | Green G (s) | Amber (s) |
|---|---|---|---|---|
| Phase 1 | 15.9 | 2.0 | 18 | 3 |
| Phase 2 | 9.1 | 2.0 | 11 | 3 |

Check: 18 + 3 + 11 + 3 = 35 s.

#### Phase diagram

```text
|      P1 green 18       |   A3  | P2 green 11  |   A3  |
```

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which flow ratios are summed to get Y?
   A. All four approach ratios
   B. The largest ratio in each phase: 0.231 + 0.132
   C. Only road 1 ratios
   D. The smallest in each phase
   Answer: B. Only the critical (largest) y in each phase counts, so Y = 0.231 + 0.132 = 0.364. (Key point: Critical flow ratio)

2. How is the total lost time L = 10 s obtained?
   A. 2 s start-up + 3 s amber per phase, for two phases
   B. 3 s per phase only
   C. 2 s total
   D. Cycle time minus green
   Answer: A. Each phase loses 2 + 3 = 5 s, so L = 10 s. (Key point: Lost time)

3. Which is Webster's optimum cycle formula?
   A. C0 = (1.5L + 5)/(1 - Y)
   B. C0 = (1.5L + 5)(1 - Y)
   C. C0 = L/(1 - Y)
   D. C0 = 1.5L - Y
   Answer: A. C0 = (1.5 x 10 + 5)/(1 - 0.364) = 31.4 s, adopted as 35 s. (Key point: Webster cycle time)

4. How is the effective green divided between phases?
   A. Equally
   B. In proportion to critical y: g = (y/Y)(C - L)
   C. Proportional to road width
   D. In proportion to amber
   Answer: B. g1 = (0.231/0.364)(25) = 15.9 s and g2 = 9.1 s; adding the 2 s start-up loss gives 18 s and 11 s. (Key point: Green time split)

## Related in Transportation Engineering II

- [Signal timing: roads P 14 m and Q 10.5 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-p-14m-q) — Transportation Engineering II, chapter 1
- [Signal timing: roads A 14.4 m and B 12 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-14-4m) — Transportation Engineering II, chapter 1
- [Signal timing: roads A 15 m and B 7 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-15m-7m) — Transportation Engineering II, chapter 1
- [Signal timing: roads A 15 m and B 12 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-15m-b) — Transportation Engineering II, chapter 1, asked 2×
- [Signal timing: roads A 18 m and B 12 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-a-18m-b) — Transportation Engineering II, chapter 1, asked 2×
- [Signal timing: roads P 13.5 m and Q 10.5 m](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Asignal-pedestrian-road-p-13-5m) — Transportation Engineering II, chapter 1

## Related in other subjects

- [30th hour volume and design controls](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3Adesign-volume-controls) — Transportation Engineering I, chapter 3
- [Runoff volume using Horton's equation, 850 km2](https://www.bctengineer.com/question.md?key=semester_5%2Fengineering_hydrology%3Ahorton-runoff-volume-850km2) — Engineering Hydrology, chapter 3
- [First product of inertia of right-angled triangle](https://www.bctengineer.com/question.md?key=semester_3%2Fstrength_of_materials%3Aproduct-of-inertia-right-triangle) — Strength of Materials, chapter 2
- [Forebay design (14.5 m³/s, two penstocks)](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aforebay-design-14-5cumec) — Hydropower Engineering, chapter 6