# Tunnel importance, components, cross sections

Transportation Engineering II · Chapter 5: Introduction to Bridge and Tunnel Engineering

- Asked in: 2076 Asoj, 8 marks
- Video: [Tunnel engineering | factors on which size and shape of tunnel depends | #tunnel](https://www.youtube.com/watch?v=X6vkXvLy4nY) — Digitech Engineering
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/transportation_engineering_ii/tunnel-importance-components-cross-sections
- Whole chapter: https://www.bctengineer.com/md/semester_7/transportation_engineering_ii/chapter-5

## Question

What is the importance of tunnel? With neat sketch, describe different components of tunnel and tunnel cross sections?

## Answer

#### Importance of tunnel

A tunnel is an underground passage excavated through a hill or mountain, or under water, without removing the overlying ground, to carry traffic.

**Importance of road tunnels**
- Shortens distance and travel time by avoiding steep climbs and long detours; especially useful in Nepal's hilly terrain.
- Lowers gradients, vehicle operating cost and fuel use.
- Avoids unstable slopes, landslides and snow- or avalanche-prone passes, and provides an all-weather connection.
- Reduces the environmental damage of large cuttings and hill-cut roads, and saves land in congested cities.
- Provides crossings under rivers, cities or sensitive areas without disturbing the surface; also useful for defence and utilities.
- Reduces accidents on hairpin bends.

#### Components and cross sections

```text
          Crown / Arch (roof)
        ___________________
      /       Extrados       \
     |   ___ Intrados ___     |
 Haunch |  |  Springing line | |  Haunch
     |  | /               \ |  |
 Side   |/    CARRIAGEWAY    \|  Side
 wall   |  Footpath/Walkway   | wall
        |___Invert (floor)____|
        [Side drain]  [Side drain]
```

**Components**
- **Portal:** entrance/exit structure with wing walls and a retaining wall that protects the face from erosion and slides.
- **Crown/roof (arch):** top part of the lining; its inner surface is the **intrados** and its outer surface the **extrados**.
- **Haunch:** the part of the arch between the springing line and the crown.
- **Springing line:** the line where the arch meets the side walls.
- **Side walls:** vertical or curved walls that support the roof.
- **Invert (floor/bottom arch):** the floor, flat or curved, carrying the pavement; a curved invert resists upward pressure in squeezing ground.
- **Lining:** shotcrete, cast-in-place concrete or segmental lining supporting the ground.
- **Drainage:** side drains, sumps and cross-drains.
- **Services:** ventilation, lighting, emergency exits and cross-passages, signage, and fire safety systems.

**Tunnel cross sections (shapes)**
1. **Circular:** the best structural shape against all-round pressure; used in soft ground and in shield and TBM tunnels.
2. **Horseshoe:** arched roof with curved side walls and a flat or slightly curved invert; common for road and railway tunnels in rock.
3. **D-shaped (segmental roof with vertical walls):** flat floor, vertical side walls and an arched roof; used in hard rock where side pressure is small.
4. **Egg-shaped/ovoid:** for water or sewage tunnels.
5. **Rectangular/box:** used in cut-and-cover tunnels in cities.
6. **Elliptical:** used in soft ground where the vertical and lateral pressures are unequal.

The size follows the carriageway width (Nepal Road Standard 2070, plus shoulders and walkways), the vertical clearance (about 5.0 m) and the space needed for services.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. Which is an advantage of a road tunnel in hilly terrain?
   A. It lengthens the route
   B. It shortens distance and gives a lower gradient
   C. It increases fuel use
   D. It requires large cuttings
   Answer: B. Tunnels avoid steep climbs and detours, lowering gradient, travel time and operating cost. (Key point: Importance of tunnel)

2. How does a tunnel give all-weather connection?
   A. By avoiding unstable slopes, landslides and snow-prone passes
   B. By adding more hairpin bends
   C. By increasing surface cuts
   D. By avoiding drainage
   Answer: A. Passing beneath the hazard keeps the road open regardless of slides or snow. (Key point: Hazard avoidance)

3. In a tunnel lining, the intrados is:
   A. The outer surface of the arch
   B. The inner surface of the arch
   C. The floor
   D. The portal wall
   Answer: B. Intrados is the inner surface of the crown; extrados is the outer surface. (Key point: Intrados and extrados)

4. What is the invert of a tunnel?
   A. The roof arch
   B. The springing line
   C. The floor (flat or curved) that carries the pavement and resists upward pressure
   D. The portal retaining wall
   Answer: C. The invert is the floor/bottom arch, important in squeezing ground. (Key point: Invert)

## Related in Transportation Engineering II

- [Bridge components; tunnel drainage and ventilation](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Abridge-components-tunnel-drainage-ventilation) — Transportation Engineering II, chapter 5
- [Bridge components; tunnel drainage and ventilation](https://www.bctengineer.com/question.md?key=semester_7%2Ftransportation_engineering_ii%3Abridge-components-tunnel-drainage-ventilation-problems) — Transportation Engineering II, chapter 5

## Related in other subjects

- [Headworks layout and cross sections](https://www.bctengineer.com/question.md?key=semester_6%2Firrigation_and_drainage_engineering%3Aheadworks-layout-sections) — Irrigation and Drainage Engineering, chapter 5
- [Typical cross-sections of hill roads](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3Ahill-cross-sections) — Transportation Engineering I, chapter 5, asked 9×
- [Velocity profile in channel cross-sections](https://www.bctengineer.com/question.md?key=semester_4%2Fhydraulics%3Avelocity-profile-channel-shapes) — Hydraulics, chapter 5
- [Hill road earthwork with cross sections](https://www.bctengineer.com/question.md?key=semester_7%2Festimating_and_costing%3Ahill-road-u-cross-sections) — Estimating and Costing, chapter 6