---
title: "Speed-time curves: urban, sub-urban, main line"
subject: "Utilization of Electrical Energy"
chapter: 4
key: "semester_7/utilization_of_electrical_energy:speed-time-curves-urban-mainline"
source: https://www.bctengineer.com/q/semester_7/utilization_of_electrical_energy/speed-time-curves-urban-mainline
site: BCT Engineering
---

# Speed-time curves: urban, sub-urban, main line

Utilization of Electrical Energy · Chapter 4: Electric Traction

- Asked in: 2069 Chaitra
- Video: [Speed Time Curve Analysis for Sub Urban & Urban Service |Electric Traction & Control|](https://www.youtube.com/watch?v=m9wNFqSdUuQ) — Anish Vora
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/utilization_of_electrical_energy/speed-time-curves-urban-mainline
- Whole chapter: https://www.bctengineer.com/md/semester_7/utilization_of_electrical_energy/chapter-4

## Question

Define speed time curve for traction system. Discuss speed time curve of urban service, sub-urban service and main line service.

## Short answer

Speed-time curve graphs speed vs time; slope = acceleration, area = distance. Urban (~1 km stops): high acceleration/braking, no free run, quadrilateral shape. Suburban (1-8 km): short free run, long coasting, quadrilateral. Mainline (>10 km): low acceleration/braking, long free run, short coasting, trapezoidal shape. Schedule speed depends on stop spacing and acceleration/braking rates.

## Answer

A **speed-time curve** of a traction system is the graph of train speed against time for a run between two stations. Its slope is acceleration, the area under it is distance travelled, and it is used to find schedule speed, energy use and motor rating.

#### 1. Urban (city) service
- Stops are about 1 km apart; trains must start and stop often.
- High acceleration (1.5–4 km/h/s) and braking (3–4 km/h/s) are needed to keep a reasonable schedule speed.
- There is **no free-run** period; acceleration is followed by a short coasting and braking.
- Curve shape is approximately quadrilateral.

```text
 V |   /\
   |  /  ``-._
   | /        \
   |/          \
   +------------\--- t
   accel  coast  brake
```

#### 2. Suburban service
- Stops 1–8 km apart; acceleration and braking similar to urban service.
- A short free-run period may appear after acceleration, followed by a long coasting period.

```text
 V |   /---.___
   |  /        ``--.
   | /              \
   |/                \
   +------------------\--- t
   accel free  coast  brake
```

#### 3. Main-line service
- Stops are more than 10 km apart, so the train runs mostly at crest speed.
- Acceleration and braking are low (0.6–0.8 and about 1.5 km/h/s) and occupy a small part of the time.
- Long free run, short coasting before braking; curve approximately trapezoidal.

```text
 V |   ____________________
   |  /                    ``-.
   | /                         \
   |/                           \
   +-----------------------------\--- t
   accel     free run     coast brake
```

| Feature | Urban | Suburban | Main line |
|---|---|---|---|
| Stop spacing | ~1 km | 1–8 km | > 10 km |
| Acceleration | High | High | Low |
| Free run | Nil | Short | Long |
| Coasting | Short | Long | Short |
| Approximate shape | Quadrilateral | Quadrilateral | Trapezoidal |

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. On a speed-time curve, the area under the curve represents:
   A. Acceleration
   B. Distance travelled
   C. Energy consumed directly
   D. Schedule speed
   Answer: B. Slope gives acceleration and the area under the curve gives distance between stations. (Key point: Meaning of speed-time curve)

2. Which feature describes the urban service speed-time curve?
   A. Long free run at crest speed
   B. No free run; acceleration, short coasting, then braking
   C. Trapezoidal shape with low acceleration
   D. Stops more than 10 km apart
   Answer: B. Stops are about 1 km apart, so there is no free run; high acceleration and braking give an approximately quadrilateral curve. (Key point: Urban service)

3. Why is the main-line curve approximately trapezoidal?
   A. Stops are very close
   B. Stops are >10 km apart so the train mostly runs at crest speed with low acceleration/braking
   C. Coasting is very long
   D. It uses very high acceleration
   Answer: B. Long free run at crest speed forms the flat top, with small accel and braking portions. (Key point: Main line service)

4. How does the suburban curve differ from the urban one?
   A. It has no coasting
   B. Acceleration is much lower
   C. It has a short free run and a long coasting period
   D. Stop spacing is below 1 km
   Answer: C. Stops are 1-8 km apart, so a short free run may appear and coasting is long. (Key point: Suburban service)

## Related in Utilization of Electrical Energy

- [Speed-time curve parts; urban and sub-urban](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Aspeed-time-curve-parts-urban-suburban) — Utilization of Electrical Energy, chapter 4
- [Speed-time curves for services; notching, coasting etc.](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Aspeed-time-curves-services-periods) — Utilization of Electrical Energy, chapter 4
- [Quadrilateral speed-time curve on down gradient](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Aquadrilateral-curve-down-gradient-energy) — Utilization of Electrical Energy, chapter 4
- [Crest, average and schedule speed; speed-time curve](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Acrest-average-schedule-speed-42kmph) — Utilization of Electrical Energy, chapter 4
- [Advantages of traction; traction fed from separate line](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Aadvantages-traction-separate-distribution-line) — Utilization of Electrical Energy, chapter 4

## Related in other subjects

- [Service connection from main pipe to building](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Aservice-connection-layout) — Water Supply Engineering, chapter 7, asked 2×
