---
title: "Forms of tariff with merits and demerits"
subject: "Utilization of Electrical Energy"
chapter: 6
key: "semester_7/utilization_of_electrical_energy:tariff-forms-merits-demerits"
source: https://www.bctengineer.com/q/semester_7/utilization_of_electrical_energy/tariff-forms-merits-demerits
site: BCT Engineering
---

# Forms of tariff with merits and demerits

Utilization of Electrical Energy · Chapter 6: Demand Side Management

- Asked in: 2071 Shrawan
- Video: [L34: Power Factor Tariff System | Types of Tariff |  Power System Series | In Hindi](https://www.youtube.com/watch?v=ZIRG2Klf0Y0) — TechInsight
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_7/utilization_of_electrical_energy/tariff-forms-merits-demerits
- Whole chapter: https://www.bctengineer.com/md/semester_7/utilization_of_electrical_energy/chapter-6

## Question

What is tariff? Explain the various forms of tariff with their merit and demerits.

## Short answer

Tariff is the schedule of charges for electrical energy, designed to recover fixed, running and profit. Forms are simple, flat, block, two-part, maximum demand, power factor, three-part, and time-of-day tariffs, each with merits and demerits: simple is easy but unfair, two-part/three-part recover costs but need demand metering, TOD shifts load but needs special meters.

## Answer

**Tariff** is the rate (schedule of charges) at which electrical energy is sold to a consumer. It must recover the fixed cost, the running cost and a reasonable profit. It should also be simple and fair, and should encourage good use of the plant.

#### 1. Simple (flat rate per unit) tariff
A fixed rate per kWh, e.g. Rs 10/kWh, for all units.
- Merits: simple to understand and bill.
- Demerits: does not separate fixed and running costs; small and large consumers pay the same rate; no incentive for a high load factor.

#### 2. Flat rate tariff
Different per-unit rates for different types of consumers (lighting, power).
- Merits: fairer than the simple tariff between consumer classes.
- Demerits: needs separate meters and wiring for each class; the rate is fixed for a class whatever the consumption.

#### 3. Block rate tariff
Energy is divided into blocks, with a different rate for each block (the rate falls for later blocks, or rises, as in Nepal's domestic tariff).
- Merits: large consumers get a lower average rate (declining block); a rising block (as used by NEA) protects poor users and discourages waste.
- Demerits: takes no account of maximum demand or time of use.

#### 4. Two-part tariff
Bill = a × kW (or kVA) maximum demand + b × kWh.
- Merits: fixed cost is recovered from the demand charge and running cost from the energy charge; fair; suits industries.
- Demerits: the maximum demand is often assessed (estimated) rather than measured, which is hard to do fairly; the consumer pays the fixed part even when little energy is used.

#### 5. Maximum demand tariff
Like the two-part tariff, but the maximum demand is actually measured by an MD meter.
- Merits: removes the objection to an assessed demand.
- Demerits: costly metering; suitable only for big consumers.

#### 6. Power factor tariff
Charges depend on pf: kVA maximum demand tariff, sliding scale tariff, or kW and kVAR tariff.
- Merits: penalises low pf, encourages pf correction, reduces plant size.
- Demerits: extra metering; complex.

#### 7. Three-part tariff
Bill = a (fixed per consumer) + b × kW + c × kWh.
- Merits: recovers customer, demand and energy costs separately; the most scientific form.
- Demerits: complicated for ordinary consumers; used only for big consumers.

#### 8. Time of day (TOD) tariff
Different energy rates for peak, normal and off-peak periods.
- Merits: shifts load to off-peak hours and improves load factor; a DSM tool.
- Demerits: needs TOD meters; may be inconvenient for consumers.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What is a tariff?
   A. The schedule of charges at which electrical energy is sold, covering fixed cost, running cost and a profit
   B. A tax on equipment
   C. The cost of generation only
   D. A meter type
   Answer: A. Tariff must recover fixed and running cost and a reasonable profit. (Key point: Meaning of tariff)

2. What is the form of a two-part tariff and its main demerit?
   A. a x kW + b x kWh; the fixed part is paid even with little energy use
   B. b x kWh only; no demerit
   C. a per consumer + c x kWh; complex
   D. Different rates for peak and off-peak
   Answer: A. Fixed cost is recovered by the demand charge and running cost by energy, but the fixed part is payable regardless of use. (Key point: Two-part tariff)

3. What is the three-part tariff?
   A. a + b x kW + c x kWh, with a fixed per consumer
   B. Rates by consumer class
   C. Declining blocks only
   D. Rates by time of day
   Answer: A. It recovers customer, demand and energy costs separately and is used only for big consumers. (Key point: Three-part tariff)

4. What is the merit of the time of day tariff?
   A. It shifts load to off-peak and improves load factor
   B. It needs no special meter
   C. It has one rate all day
   D. It ignores demand
   Answer: A. Different rates for peak, normal and off-peak periods push consumers to off-peak, making it a DSM tool. (Key point: TOD tariff)

## Related in Utilization of Electrical Energy

- [Types of electric drives with merits and demerits](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Aelectric-drive-types-merits) — Utilization of Electrical Energy, chapter 2
- [Merits and demerits of DC track electrification](https://www.bctengineer.com/question.md?key=semester_7%2Futilization_of_electrical_energy%3Adc-track-electrification-merits) — Utilization of Electrical Energy, chapter 4

## Related in other subjects

- [Cofferdam types, uses, merits and demerits](https://www.bctengineer.com/question.md?key=semester_5%2Ffoundation_engineering%3Acofferdam-types-merits) — Foundation Engineering, chapter 5, asked 7×
- [Incineration: merits and demerits](https://www.bctengineer.com/question.md?key=semester_6%2Fsanitary_engineering%3Asolid-waste-incineration) — Sanitary Engineering, chapter 10, asked 7×
- [Merits and demerits of river and ridge routes](https://www.bctengineer.com/question.md?key=semester_6%2Ftransportation_engineering_i%3Ariver-ridge) — Transportation Engineering I, chapter 5, asked 7×
- [Distribution layouts, merits and demerits](https://www.bctengineer.com/question.md?key=semester_5%2Fwater_supply_engineering%3Adistribution-layouts-merits-demerits) — Water Supply Engineering, chapter 7, asked 6×
