# Hydrograph and flow duration curve

Power Plant Design · Chapter 3: Hydro Power Plant Design

- Asked in: 2078 Kartik, 6 marks
- Video: [HYDROGRAPH,MASSCURVE AND FLOW DURATION CURVE](https://www.youtube.com/watch?v=Xjls-BiLd10) — Asw Education
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_8/power_plant_design/hydrograph-flow-duration
- Whole chapter: https://www.bctengineer.com/md/semester_8/power_plant_design/chapter-3

## Question

What are hydrograph and flow duration curve? Discuss its applicability.

## Short answer

A hydrograph plots discharge against calendar time, showing seasonal sequence; a flow duration curve plots discharge against percentage of time exceeded, losing time order. The hydrograph is used for seasonal energy, flood design, storage and maintenance; the FDC sets design flow, capacity, firm power, unit number, riparian release and site comparison.

## Answer

#### Hydrograph
A **hydrograph** is a graph of river discharge plotted against **time in calendar order** (hours, days or months). It shows when high and low flows occur, e.g. the monsoon peak in July–August and the dry-season low in March–April for Nepalese rivers.

```text
 Q (m3/s)
  |            __
  |           /  \
  |          /    \
  |         /      \__
  |  _____/            \______
  +---------------------------> Month
   Jan  Mar  May  Jul  Sep  Nov
```

#### Flow duration curve (FDC)
An **FDC** is a graph of discharge against the **percentage of time it is equalled or exceeded**. It is made by sorting the same flow data in descending order and plotting each value against its exceedance $P = \dfrac{m}{n+1}\times 100\%$. Time order is lost, but the duration of each flow is shown.

```text
 Q (m3/s)
  |\
  | \
  |  \___
  |      \______
  |             \__________
  +--------------------------> % time exceeded
  0     45   65       95  100
```

#### Applicability of the hydrograph
1. **Seasonal energy:** monthly flows give month-wise energy, needed for wet/dry season tariff and PPA.
2. **Flood design:** peak flood hydrographs size spillways, cofferdams and diversion works.
3. **Storage design:** the mass curve (cumulative hydrograph) gives the reservoir or pondage volume needed to meet demand.
4. **Construction and maintenance planning:** plan works and unit outages in low-flow months.
5. **Sediment planning:** high-flow months carry most sediment, guiding desander operation.

#### Applicability of the FDC
1. **Design discharge:** chosen at a set exceedance, e.g. $Q_{40}$–$Q_{45}$ for ROR in Nepal.
2. **Installed capacity and annual energy:** area under the FDC up to the design flow gives energy; plant factor is found from it.
3. **Firm power:** from $Q_{90}$–$Q_{95}$.
4. **Number and size of units:** shows how often the plant runs at part load.
5. **Riparian release:** from the low-flow tail.
6. **Comparison of sites:** a flat FDC means steady flow, ideal for ROR; a steep FDC means storage is needed.

| Point | Hydrograph | FDC |
|---|---|---|
| x-axis | Time (calendar) | % time exceeded |
| Shows sequence | Yes | No |
| Main use | Seasonal energy, floods, storage | Design flow, capacity, firm power |

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What does a hydrograph plot?
   A. Discharge against % time exceeded
   B. Head against discharge
   C. Rainfall against area
   D. Discharge against time in calendar order
   Answer: D. A hydrograph keeps time sequence; the FDC does not. (Key point: Hydrograph)

2. How is an FDC constructed?
   A. Sort flows in descending order and plot against exceedance
   B. Plot flows in time order
   C. Sum flows monthly
   D. Average flows yearly
   Answer: A. FDC loses time order but shows durations. (Key point: FDC)

3. Which use belongs to the hydrograph?
   A. Firm power from Q95
   B. Flood design and storage (mass curve) design
   C. Choosing Q45 design flow
   D. Riparian release
   Answer: B. Time sequence is needed for floods and storage; the FDC gives design flow and firm power. (Key point: Hydrograph use)

4. What does a steep FDC indicate?
   A. Steady flow ideal for ROR
   B. No monsoon
   C. Storage is needed
   D. Flat river
   Answer: C. A flat FDC suits ROR, a steep one needs storage. (Key point: FDC shape)

## Close variants set in other exams

- [Flow duration curve and its applicability](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Aflow-duration-curve) — Power Plant Design, chapter 3, asked 3×

## Related in Power Plant Design

- [Flow duration curve and unit sizing](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Afdc-unit-sizing) — Power Plant Design, chapter 3

## Related in other subjects

- [Flow duration curve and planning parameters](https://www.bctengineer.com/question.md?key=semester_6%2Fhydro_power%3Afdc-planning-parameters) — Hydro Power, chapter 3
- [Flow duration curve and power at mean flow](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aror-capacity-fdc-flow-table-79) — Hydropower Engineering, chapter 3
- [Flow duration curve; firm and secondary energy](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Afdc-firm-secondary-energy-69) — Hydropower Engineering, chapter 3
- [Load duration curve; diesel plant; ROR flow duration](https://www.bctengineer.com/question.md?key=semester_7%2Fhydropower_engineering%3Aload-duration-diesel-import-fdc) — Hydropower Engineering, chapter 3