# Specification for procuring a power transformer

Power Plant Design · Chapter 4: Electric System Design of a Power Plant

- Asked in: 2079 Jestha, 8 marks; 2073 Magh, 6 marks; 2070 Magh, 8 marks (asked 3 times)
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_8/power_plant_design/power-transformer-specification
- Whole chapter: https://www.bctengineer.com/md/semester_8/power_plant_design/chapter-4

## Question

Develop a typical specification while procuring a power transformer to be used in power plant design.

## Short answer

Outdoor oil-immersed 3-phase GSU to IEC 60076; e.g. 30 MVA ONAN/37.5 MVA ONAF; 132/11 kV, 50 Hz, YNd11; impedance 10–12.5%; off-circuit tap changer; HV BIL 650 kVp; ONAN/ONAF cooling; guaranteed no-load and load losses; conservator with air cell, Buchholz, PRV, OTI, WTI; routine and type tests.

## Answer

A **technical specification** for a power plant's power (step-up) transformer lists the ratings, design, performance and test requirements so that bidders quote a transformer that fits the plant and grid. A typical specification (following **IEC 60076**) for a hydropower GSU is:

| Item | Typical specification |
|---|---|
| Type, application | Outdoor, oil-immersed, 3-phase, two-winding, generator step-up |
| Standard | IEC 60076 (all parts) |
| Rated power | e.g. 30 MVA (ONAN) / 37.5 MVA (ONAF) |
| Rated voltage ratio | e.g. 132 / 11 kV |
| Frequency | 50 Hz |
| Vector group | YNd11 (HV star neutral solidly earthed) |
| Impedance | About 10–12.5% on rated MVA (with tolerance per IEC) |
| Tap changer | Off-circuit ±2 × 2.5% on HV (or OLTC if grid needs it) |
| Cooling | ONAN/ONAF (or OFWF in cavern powerhouses) |
| Insulation level (BIL) | HV 650 kVp lightning impulse, 275 kV power frequency (for 145 kV class); LV 75 kVp, 28 kV |
| Temperature rise | Top oil 60 K, average winding 65 K over 40 °C ambient |
| Altitude | Derating/insulation correction above 1000 m |
| Losses | Guaranteed no-load and load losses, capitalised in bid evaluation |
| Efficiency, regulation | Stated at rated load and 0.85 pf |
| Noise level | e.g. below 75 dB(A) |
| Short-circuit withstand | 2 s thermal, dynamic per IEC 60076-5 |
| Core and winding | CRGO core; copper windings; disc/helical type |
| Oil | Mineral oil to IEC 60296 |
| Bushings | Porcelain/composite, with bushing CTs for protection |
| Accessories | Conservator with air-cell, silica gel breather, Buchholz relay, PRV, OTI, WTI, MOG, drain/filter valves, rollers, earthing terminals, marshalling box |
| Tests | Routine (ratio, polarity, resistance, impedance, losses, dielectric), type (temperature rise, impulse) and special tests; FAT witnessed |
| Transport | Max weight and dimensions for hill road access; nitrogen-filled transport if needed |
| Documents and spares | Drawings, manuals, recommended spares, warranty |

The rating is fixed from generator MVA (e.g. two 15 MVA units → 30 MVA), impedance from fault-level and stability studies, and BIL from the insulation coordination of the HV system.

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. The typical vector group for a hydropower GSU is:
   A. Dyn1 with LV earthed
   B. YNd11 with HV star neutral earthed
   C. Yy0 unearthed
   D. Dd0
   Answer: B. Delta on the generator side blocks zero sequence and third harmonics; HV star neutral is earthed. (Key point: Vector group)

2. The transformer MVA rating and impedance are fixed from:
   A. Colour code
   B. Rainfall data
   C. Only the bidder's catalogue
   D. Generator MVA and fault-level/stability studies
   Answer: D. Rating follows generator MVA (e.g. two 15 MVA units give 30 MVA); impedance from fault-level and stability studies. (Key point: Rating basis)

3. A typical specification follows IEC 60076 and requires:
   A. No tests
   B. Only visual inspection
   C. Routine, type and special tests with factory acceptance tests witnessed
   D. Tests only after installation
   Answer: C. Routine, type and special tests are specified, and FAT is witnessed. (Key point: Tests and standard)

## Close variants set in other exams

- [Specification for procuring a generator](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Agenerator-specification) — Power Plant Design, chapter 4, asked 4×

## Related in Power Plant Design

- [Design: 550 m head plant, transformer quotation](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2077-550m-quotation) — Power Plant Design, chapter 4, asked 3×
- [Design: 245 m head plant, standby generator](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2073-245m-standby) — Power Plant Design, chapter 4, asked 14×
- [Design: 250 m head plant at Q25%](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2072-250m-q25) — Power Plant Design, chapter 4, asked 14×
- [Design: 200 m head plant, bus MVA levels](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2070-200m-bus-mva) — Power Plant Design, chapter 4, asked 14×
- [Design: 230 m head plant, 20 km line](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2070-230m-20km) — Power Plant Design, chapter 4, asked 14×
- [Design: 250 m head plant, 66 kV double circuit](https://www.bctengineer.com/question.md?key=semester_8%2Fpower_plant_design%3Adesign-2071-250m-0-92mh) — Power Plant Design, chapter 4, asked 13×

## Related in other subjects

- [Design: 500 kVA 66/11 kV power transformer](https://www.bctengineer.com/question.md?key=semester_5%2Felectric_machine_design%3Adesign-500kva-66-11kv) — Electric Machine Design, chapter 3, asked 6×
- [Design: 4000 kVA 66/11 kV power transformer](https://www.bctengineer.com/question.md?key=semester_5%2Felectric_machine_design%3Adesign-4000kva-66-11kv) — Electric Machine Design, chapter 3, asked 5×
- [Typical power system network and components](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Atypical-power-system-network-components) — Power System Analysis I, chapter 1
- [Typical power system with voltage levels](https://www.bctengineer.com/question.md?key=semester_4%2Fpower_system_analysis_i%3Atypical-power-system-voltage-levels) — Power System Analysis I, chapter 1