title: "Economical span, double circuit, five spans"
subject: "Transmission and Distribution System Design"
chapter: 4
key: "semester_8/transmission_and_distribution_system_design:economic-span-double-circuit-five-spans"
source: https://www.bctengineer.com/q/semester_8/transmission_and_distribution_system_design/economic-span-double-circuit-five-spans
site: BCT Engineering
---

# Economical span, double circuit, five spans

Transmission and Distribution System Design · Chapter 4: Conductor and Support Selection

- Asked in: 2070 Bhadra, 16 marks
- Answer checked by Claude Opus 5.5 (high effort) on 2026-10-14
- Page: https://www.bctengineer.com/q/semester_8/transmission_and_distribution_system_design/economic-span-double-circuit-five-spans
- Whole chapter: https://www.bctengineer.com/md/semester_8/transmission_and_distribution_system_design/chapter-4

## Question

To transmit a given amount of power to a given distance a double circuit line with a double earth wire is chosen for which the following design steps are completed, compute the most economical span.

| Span | Dmax (m) | h1 (m) | h2 (m) | h3 (m) | Ht (m) |
|---|---|---|---|---|---|
| 250 m | 5.27 | 12.178 | 14.998 | 17.818 | 28.444 |
| 275 m | 6.24 | 13.148 | 15.968 | 18.788 | 29.414 |
| 300 m | 7.30 | 14.208 | 17.028 | 19.848 | 30.474 |
| 325 m | 8.43 | 15.338 | 18.158 | 20.978 | 31.604 |
| 350 m | 9.65 | 16.558 | 19.378 | 22.198 | 32.824 |

Where h1: height of lower conductor from ground, h2: height of middle conductor from ground, h3: height of top conductor from ground, Ht: total height of tower. The power conductor has maximum working tension of 6000 kg and diameter of 4 cm. The earth wire has maximum working tension of 2000 kg and diameter of 2 cm. Assume maximum conductor deviation of 5° is permissible for all towers and the wind force is 100 kg/m².

## Short answer

The most economical span is 275 m, yielding the minimum tower weight per km of 30.06 t/km. It is determined by computing base bending moment and tower weight via Ryle's formula for each span and selecting the least weight per km.

## Answer

The most economical span gives the **minimum tower weight (cost) per km of line**. For each span, compute the base bending moment of a 5° deviation tower, then the tower weight from Ryle's formula, then the weight per km.

Tower weight is taken from **Ryle's formula** (as given with IOE papers):

$$
W_t = 0.0016\,H_t\sqrt{M\times FS}\ \ \text{tonne}
$$

Here $H_t$ is in ft, $M$ is the bending moment at the base in klb-ft, and FS = 2 (assumed). The conversions are 1 m = 3.281 ft and 1 kg·m = 0.007233 klb-ft. Tower cost is taken as proportional to tower weight, and the number of towers per km is about $1000/L$. So the span with the **least tower weight per km** is the most economical.

#### Loads and bending moment
For each span $L$ the loads on a tower are found as follows. The wind span is taken equal to the span.

- Each power conductor (6 of them, 2 at each height $h_1, h_2, h_3$):
$$
F_c = p\,d_c\,L + 2T_c\sin\frac{\theta}{2} = 100\times0.04\,L + 2\times6000\sin\frac{\theta}{2}\ \text{kg}
$$
- Each earth wire (2 of them, at height $H_t$):
$$
F_e = p\,d_e\,L + 2T_e\sin\frac{\theta}{2} = 100\times0.02\,L + 2\times2000\sin\frac{\theta}{2}\ \text{kg}
$$
- Bending moment at the base:
$$
M = 2F_c(h_1+h_2+h_3) + 2F_e H_t
$$
Wind on the tower body is neglected because it is about the same for all spans.

All towers are designed for the maximum permissible deviation θ = 5°, so $2\sin2.5^\circ = 0.08724$.

**Sample calculation for L = 250 m, θ = 5°:**

$$
\begin{aligned}
F_c &= 100\times0.04\times250 + 12000\sin2.5^\circ = 1000+523.4 = 1523.4\ \text{kg}\\
F_e &= 100\times0.02\times250 + 4000\sin2.5^\circ = 500+174.5 = 674.5\ \text{kg}\\
M &= 2(1523.4)(12.178+14.998+17.818) + 2(674.5)(28.444) = 175{,}460\ \text{kg·m}\\
&= 1269.1\ \text{klb-ft}\\
W_t &= 0.0016\times(28.444\times3.281)\sqrt{1269.1\times2} = 7.522\ \text{t}\\
\text{Weight/km} &= 7.522\times\frac{1000}{250} = 30.090\ \text{t/km}
\end{aligned}
$$

#### Results for all spans
| Span L (m) | $F_c$ (kg) | $F_e$ (kg) | M (kg·m) | $W_t$ (t) | Towers/km | Weight/km (t) |
|---|---|---|---|---|---|---|
| 250 | 1523.4 | 674.5 | 175,460 | 7.522 | 4.000 | 30.090 |
| 275 | 1623.4 | 724.5 | 198,157 | 8.267 | 3.636 | 30.061 |
| 300 | 1723.4 | 774.5 | 223,283 | 9.092 | 3.333 | 30.305 |
| 325 | 1823.4 | 824.5 | 250,773 | 9.992 | 3.077 | 30.745 |
| 350 | 1923.4 | 874.5 | 281,041 | 10.986 | 2.857 | 31.390 |

Steps followed:
1. $F_c$ and $F_e$ increase with span because the wind span increases.
2. $M$ increases because both the loads and the heights ($h_1,h_2,h_3,H_t$, which include the sag) increase.
3. $W_t$ increases, but the number of towers per km falls.
4. The product, weight per km, is lowest at 275 m (30.061 t/km). It is only slightly higher at 250 m (30.090 t/km) and then rises clearly from 300 m onwards.

```text
 t/km
 31.4 |                              *
 30.7 |                       *
 30.3 |                *
 30.1 |  *      *
      +--+------+------+------+------+--
        250    275    300    325    350  span (m)
```

**Answer: the most economical span is 275 m, with a tower weight of 8.267 t per tower and 30.06 t per km.**

## Check yourself

The answer's key points as multiple-choice questions, with the correct option and why.

1. What decides the economical span?
   A. Maximum tower weight per tower
   B. Minimum tower weight per km
   C. Minimum sag
   D. Minimum number of towers
   Answer: B. Cost is proportional to weight. (Key point: Criterion)

2. Why does M rise with span?
   A. Tension decreases
   B. Only the conductor weight increases
   C. Wind load rises with wind span and heights include larger sag
   D. Angle increases
   Answer: C. Both Fc and heights increase. (Key point: Moment)

3. What is 2T sin(theta/2) with theta = 5 deg for conductor?
   A. About 1000 kg
   B. About 1523 kg
   C. About 87 kg
   D. About 523 kg (12000 x sin2.5)
   Answer: D. 12000 x 0.04362 = 523.4 kg. (Key point: Deviation term)

4. Which span is most economical?
   A. 275 m, 30.06 t/km
   B. 250 m, 30.09 t/km
   C. 300 m, 30.31 t/km
   D. 350 m, 31.39 t/km
   Answer: A. 275 m is just below 250 m, then it rises. (Key point: Result)

## Close variants set in other exams

- [Most economical span, double circuit line](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-double-circuit) — Transmission and Distribution System Design, chapter 4, asked 6×
- [Economical span, double circuit, A/B/C towers](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-double-circuit-abc-towers) — Transmission and Distribution System Design, chapter 4, asked 5×
- [Economical span, 200 km, A/B/C tower types](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-200km-three-tower-types) — Transmission and Distribution System Design, chapter 4, asked 6×
- [Economical span, double circuit, 5° deviation](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-double-circuit-6000kg) — Transmission and Distribution System Design, chapter 4, asked 4×

## Related in Transmission and Distribution System Design

- [Economical span, 200 km, 10% angle towers](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-200km-angle-towers) — Transmission and Distribution System Design, chapter 4, asked 2×
- [Most economical span, 180 km single circuit](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-180km-single-circuit) — Transmission and Distribution System Design, chapter 4
- [T/F: double earth wire for 400 kV single circuit](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Atf-400kv-single-circuit-double-earth) — Transmission and Distribution System Design, chapter 3
- [T/F: earth wire choice depends on circuit and voltage](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Atf-earth-wire-choice-circuit-voltage) — Transmission and Distribution System Design, chapter 3
- [Most economical span from sag table](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-sag-table-28mm) — Transmission and Distribution System Design, chapter 4, asked 2×
- [Most economical EHV span from sag table](https://www.bctengineer.com/question.md?key=semester_8%2Ftransmission_and_distribution_system_design%3Aeconomic-span-sag-table-21mm) — Transmission and Distribution System Design, chapter 4, asked 2×

## Related in other subjects

- [Block diagram reduction: G1–G4 with H1, H2, H3](https://www.bctengineer.com/question.md?key=semester_3%2Fcontrol_systems%3Abdr-g1-g4-h1h2h3-2073) — Control Systems, chapter 3, asked 3×
- [Block diagram reduction: G1–G4 with H1, H2, H3 loops](https://www.bctengineer.com/question.md?key=semester_3%2Fcontrol_systems%3Abdr-g1-g4-h1h2h3-2070r) — Control Systems, chapter 3, asked 2×