Site investigation for road construction

Short answer

Site investigation for a road involves desk study and reconnaissance, followed by detailed engineering geological mapping, test pits, boreholes, and geophysical surveys to determine ground conditions. In-situ tests, slope stability analysis, and material surveys for aggregates and fill are conducted, with findings documented in strip maps and geological sections.

Describe the various methods of site investigation for road construction.

Site investigation for a road finds the ground conditions along the alignment so that the road is safe, economical and stable. It is done in stages.

1. Reconnaissance and desk study

  • Collect topographic maps, geological maps, aerial photographs, satellite images and earlier reports.
  • Walk over possible routes to compare them and avoid landslides, steep slopes, marshes and fault zones.

2. Preliminary survey

  • Detailed engineering geological mapping of the corridor: rock types, structures, weathering, slope angles, springs, existing landslides.
  • Aerial photograph interpretation for lineaments, drainage and unstable areas.
  • A few test pits and shallow boreholes at key locations.

3. Detailed investigation of the chosen alignment

  • Test pits and trenches every 200 to 500 m or at changes in soil type to find soil type and depth of rock; sample for laboratory tests (grain size, Atterberg limits, CBR, compaction).
  • Boreholes (auger/rotary) at bridge sites, high embankments, deep cuttings and landslide areas to get strata, groundwater and rock quality.
  • Geophysical methods: electrical resistivity and seismic refraction for depth of bedrock, water table and buried slide surfaces.
  • In-situ tests: SPT, plate load test, field CBR.
  • Slope stability study by kinematic analysis of joints and bedding relative to the cut face.

4. Material survey

  • Locate quarries for stone and aggregate, borrow pits for fill, and sand and gravel sources; test for quality and quantity.

5. Reporting

  • Prepare strip maps, longitudinal geological sections, and recommendations on cut slopes, retaining structures, drainage and bioengineering.

6. Construction stage

  • Inspect cuttings and foundations, and revise treatment if conditions differ.