Skip to main content

Hydropower Engineering

Photo by Lijovklm on Wikimedia Commons, CC BY-SA 4.0

Most repeated questions

From 21 past exams

  1. 4×Hydropower Development Policy 2001 (2058 BS)Chapter 1 · last set 2082 Baishakh
  2. 4×Purpose and types of spillwaysChapter 4 · last set 2081 Bhadra
  3. 4×Types of powerhouses and suitabilityChapter 8 · last set 2081 Bhadra
  4. 4×Settling basin 60 m³/s, 0.2 mm, w = 1.5 cm/sChapter 5 · last set 2080 Baishakh
  5. 3×Surge and water hammer: 25 m³/s, 15 m surge tankChapter 6 · last set 2082 Baishakh
  6. 3×Seepage and phreatic line: horizontal filter at toeChapter 4 · last set 2081 Bhadra
  7. 3×RoR headworks arrangement and functional requirementsChapter 5 · last set 2081 Bhadra
  8. 3×Powerhouse layout with vertical axis Francis turbineChapter 8 · last set 2081 Baishakh
  9. 3×Powerhouse general arrangement and dimensionsChapter 8 · last set 2078 Bhadra
  10. 3×Studies in reconnaissance, pre-feasibility, feasibilityChapter 2 · last set 2073 Shrawan

Counts include close variants: the same question set again with other numbers or wording.

Chapters

Tap the ring to track each chapter: Seen → Known → Confident

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8