Skip to main content

RQD and its calculation

Short answer

RQD is the percentage of sound core pieces ≥10 cm per total core run: RQD = (sum lengths ≥10 cm / total length)×100. Where no core exists, RQD = 115 - 3.3 J_v (volumetric joint count) or from scanline frequency. It is a key input to RMR and Q-system classifications.

What is Rock Quality Designation (RQD)? How is it calculated from drill core samples and from rock outcrops (in the absence of core)? Explain its importance in rock mass classification.

Rock Quality Designation (RQD), proposed by Deere (1967), is the percentage of sound core pieces 10 cm or longer in the total length of a core run. It is an index of the degree of jointing and fracturing of the rock mass.

From drill core

RQD=∑length of core pieces≥10 cmtotal length of core run×100 %RQD = \frac{\sum \text{length of core pieces} \geq 10\ \text{cm}}{\text{total length of core run}} \times 100\ \%

Only natural, hard and sound pieces are counted; breaks caused by drilling or handling are ignored. Example: in a 150 cm run with pieces of 12, 25, 8, 30, 15 and 20 cm, the pieces counted are 12 + 25 + 30 + 15 + 20 = 102 cm, so RQD = 102/150 × 100 = 68 % (fair).

From outcrops (no core)

  1. Volumetric joint count (Palmstrom):
RQD=115−3.3 Jv(Jv≥4.5),RQD=100 for Jv<4.5RQD = 115 - 3.3\,J_v \quad (J_v \geq 4.5),\qquad RQD = 100\ \text{for}\ J_v < 4.5

where JvJ_v is the number of joints per cubic metre (the sum of the joint frequencies per metre of all sets). 2. Scanline (Priest and Hudson): count the discontinuities per metre, λ\lambda, along a scanline; then RQD=100 e−0.1λ(0.1λ+1)RQD = 100\,e^{-0.1\lambda}(0.1\lambda + 1).

RQD classes

RQD (%)Quality
90 to 100Excellent
75 to 90Good
50 to 75Fair
25 to 50Poor
below 25Very poor

Importance

  • It is a quick, cheap index of rock quality from boreholes.
  • It is one of the parameters of the RMR system (rating 3 to 20) and of the Q-system (RQD/JnRQD/J_n gives block size).
  • It helps in choosing tunnel support, estimating rock mass strength and deformability, and deciding grouting and excavation methods.
  • Limitation: it ignores joint orientation, condition and filling.

✓ Answer checked by Claude Opus 5.5 (high effort)